HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > General Development


Reply

 
Thread Tools Display Modes
     
     
  #781  
Old Posted Feb 23, 2020, 5:35 AM
TowerDude TowerDude is offline
Registered User
 
Join Date: Feb 2017
Posts: 296
They should also bring the L and 7 trains to Penn Station too and figure out some way to make free transfer corridors between the L/7 trains and the 1/2/3 and A/C/E trains
Reply With Quote
     
     
  #782  
Old Posted Feb 24, 2020, 11:45 AM
nito nito is offline
Registered User
 
Join Date: Mar 2004
Posts: 2,855
Quote:
Originally Posted by Nexis4Jersey View Post
East Side Access will shift most of the LIRR ridership away from Penn and some of the E train ridership. But for whatever reason the LIRR still intends on running full service to Penn despite ridership project to decrease by 60%. It also plans on gutting service to Atlantic Terminal in favor of a shuttle service. I don't think there is a high demand for through running , and you'll have a very hard time convincing the agencies that its worth while. NJT has billions in backlogged projects before it could even handle high capacity / frequent trains that would be required for through running.
I’d be surprised that there isn’t demand, or more accurately it is supressed by the lack of simple connectivity from cross-city rides to an integrated passenger information system. It isn’t just a case of people getting to jobs in New Jersey from Long Island and vice versa, it’s broader connectivity, such as getting to Newark Airport from Long Island, etc…

Metro areas are regularly brought up on this forum to gauge size and scale, but the absence of joined up regional planning results in staggeringly expensive projects that deliver little benefit. East Side Access is costing half the price of Crossrail, but merely relocates terminating trains one mile away (whilst also reusing an existing tunnel) to a station that has surplus platform capacity, but which doesn’t utilise them.
__________________
London Transport Thread updated: 2023_07_12 | London Stadium & Arena Thread updated: 2022_03_09
London General Update Thread updated: 2019_04_03 | High Speed 2 updated: 2021_09_24
Reply With Quote
     
     
  #783  
Old Posted Feb 24, 2020, 1:01 PM
k1052 k1052 is offline
Registered User
 
Join Date: Oct 2007
Posts: 2,235
Quote:
Originally Posted by nito View Post
Metro areas are regularly brought up on this forum to gauge size and scale, but the absence of joined up regional planning results in staggeringly expensive projects that deliver little benefit. East Side Access is costing half the price of Crossrail, but merely relocates terminating trains one mile away (whilst also reusing an existing tunnel) to a station that has surplus platform capacity, but which doesn’t utilise them.
MNRR didn't want to share Grand Central with LIRR so we get the mind bogglingly expensive ESA. Then of course LIRR didn't want to share their Penn slots with MNRR until the governor told them they had to.

Even within the same org the different arms are often too busy trying to block each other to protect their turf to get much done for their customers.
Reply With Quote
     
     
  #784  
Old Posted Feb 26, 2020, 2:46 AM
Nexis4Jersey's Avatar
Nexis4Jersey Nexis4Jersey is online now
Greetings from New Jersey
 
Join Date: Mar 2009
Location: North Jersey
Posts: 3,260
Quote:
Originally Posted by k1052 View Post
MNRR didn't want to share Grand Central with LIRR so we get the mind bogglingly expensive ESA. Then of course LIRR didn't want to share their Penn slots with MNRR until the governor told them they had to.

Even within the same org the different arms are often too busy trying to block each other to protect their turf to get much done for their customers.
I think the Grade into the Lower Level was more of an issue then the sharing. The current ESA is about level with the 63rd street tunnel , the lower level of GCT would most likely require a longer approach.
Reply With Quote
     
     
  #785  
Old Posted Feb 26, 2020, 1:14 PM
k1052 k1052 is offline
Registered User
 
Join Date: Oct 2007
Posts: 2,235
Quote:
Originally Posted by Nexis4Jersey View Post
I think the Grade into the Lower Level was more of an issue then the sharing. The current ESA is about level with the 63rd street tunnel , the lower level of GCT would most likely require a longer approach.
The grade was acceptable. MNRR didn't want LIRR in their tunnels or terminal. The stated reason for rejecting this alternative were "impact to MNRR operations". LIRR tried the same thing at Penn with their slots but got told no this time by the governor to facilitate MNRR Penn Access.

Anyhoo it's built now (mostly). The ESA does present some tantalizing options for future expansion but that doesn't seem likely until costs come down and the various transportation agencies cease their trench warfare.
Reply With Quote
     
     
  #786  
Old Posted May 21, 2020, 11:29 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 51,747
https://commercialobserver.com/2020/...y-post-office/

Facebook Closing on 740K SF at Farley Post Office, Despite Work From Home Initiative

BY STEVE CUOZZO
MAY 21, 2020


Quote:
Facebook’s breathlessly-watched negotiation to lease more than 700,000 square feet at Vornado’s Farley Post Office site is all but a done deal, sources told Commercial Observer.

“It’s immensely complicated. They were hoping to finish it by Memorial Day. They’ll miss that date, but the fact that they were aiming for it shows how near they are,” an insider said.

It was widely speculated that Facebook might change its mind about taking space at Farley after the coronavirus struck. But sources said the talks never broke down and the goal line’s now in reach.
Quote:
On Thursday, Facebook CEO Mark Zuckerberg announced he would shift as many as half of the firm’s 45,000 employees to work-from-home status, the Wall Street Journal reported.

But the transition would unspool slowly over the next ten years, he said. It didn’t appear to immediately impact Facebook’s ongoing expansion in Manhattan.

A likely 740,000-square-foot commitment between Facebook and one of the country’s largest developers at a high-profile Manhattan location would be a promising bellwether for the office market’s future.
Quote:
The building will also house a spectacular new Moynihan Train Hall, part of a state-backed project to modernize cramped and inefficient Penn Station across the street.

Vornado’s development cost is estimated at $1.03 billion, according to the publicly traded company’s most recent SEC filing. Related Companies is a five-percent partner in the project.

Facebook would have space on floors 2-4 as well as on a new fifth level being built atop the original structure.

Prior to the coronavirus outbreak, Facebook also signed leases for 1.5 million square feet at three of Related’s Hudson Yards towers. It currently has 760,000 square feet at 770 Broadway and 266,000 square feet at 225 Park Avenue South.
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
Reply With Quote
     
     
  #787  
Old Posted May 22, 2020, 3:36 PM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694
NJ Transit Authorizes Contract for Penn Station Design Work

Quote:
The NJ Transit Board of Directors authorized a $4.1 million contract with FX Collaborative Architects of New York for preliminary design, engineering and construction assistance of the Central Concourse Extension at Penn Station New York (PSNY).

The NJ Transit Central Concourse Extension is a proposed corridor that will provide additional access to Tracks 1-12. The overriding purpose of the Central Concourse Extension will be to improve passenger access to NJ Transit trains entering and leaving PSNY. It will also improve passenger connectivity within the station and to the street.


The new Central Concourse Extension will extend the existing Central Concourse south from the Hilton Passageway to provide additional access to Tracks 1-12 with new stairs and elevators to each platform.

Working with Amtrak, NJ Transit will define the project and advance the design to 30%, continuing the focus on the structural and mechanical, electrical and plumbing (MEP) impacts, construction impacts and architectural feasibility. Continued coordination with key stakeholders such as Amtrak and Long Island Rail Road (LIRR) will be an important element in the next design phase. The design and engineering of the project will require significant coordination with, and is subject to review and approval by, Amtrak, the station’s owner. This phase of design is anticipated to be completed in 2023.

NJ Transit is engaged in a number of additional initiatives regarding PSNY, and this project is being advanced within that context. The additional activities include:

Partnering with Amtrak on a redesign and opening up of the existing Level B (Main Concourse) waiting room, which will become fully available for NJ Transit customers and will include a ticketed customer entrance on its east side to provide easier access from NJ Transit’s 7th Avenue Concourse. (The Central Concourse’s northern terminus would be located in close proximity to this area.)

Engaging with Amtrak on its plans for moving a major portion of Amtrak’s daytime passenger operations across 8th Avenue to Moynihan Train Hall, and will work to develop an expansion of NJ Transit’s passenger facilities in its transition to be the primary railroad occupant on Level B.


Working with Amtrak, the MTA and others on a Master Plan design effort for Penn Station, which will build on the earlier work of the Penn Station Visioning Study that identified the Central Concourse Extension project as a fundamental improvement for passenger circulation.
==================
https://www.railwayage.com/passenger...n-design-work/
Reply With Quote
     
     
  #788  
Old Posted May 23, 2020, 3:51 PM
TowerDude TowerDude is offline
Registered User
 
Join Date: Feb 2017
Posts: 296
Facebook should be getting smaller not larger.
Reply With Quote
     
     
  #789  
Old Posted May 26, 2020, 4:26 PM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694
From today's press conference. Brief mention of the rail station.

Reply With Quote
     
     
  #790  
Old Posted Jun 10, 2020, 3:43 PM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694
Reply With Quote
     
     
  #791  
Old Posted Jun 16, 2020, 4:35 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 51,747
Still looks on target to open the end of the year...















__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
Reply With Quote
     
     
  #792  
Old Posted Jun 22, 2020, 5:26 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 51,747
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
Reply With Quote
     
     
  #793  
Old Posted Jun 23, 2020, 10:42 PM
ESysyn ESysyn is offline
Registered User
 
Join Date: May 2014
Location: HUNTSVILLE, AL
Posts: 46
Quote:
Originally Posted by TowerDude View Post
They should also bring the L and 7 trains to Penn Station too and figure out some way to make free transfer corridors between the L/7 trains
I know it is a long shot, but if they were to bring the L and 7 trains to Penn Station, they could merge the lines into a single line.

They could perhaps name it the U train.
Reply With Quote
     
     
  #794  
Old Posted Jun 24, 2020, 1:02 AM
KVNBKLYN KVNBKLYN is offline
Registered User
 
Join Date: Aug 2007
Location: Brooklyn
Posts: 345
Quote:
Originally Posted by ESysyn View Post
I know it is a long shot, but if they were to bring the L and 7 trains to Penn Station, they could merge the lines into a single line.
Considering the 7 is an A division train (narrow trains) and the L is a B division (wider trains), that wouldn't be possible without completely rebuilding the platforms along one of the current lines, so, unlikely to happen.
Reply With Quote
     
     
  #795  
Old Posted Jun 24, 2020, 9:49 PM
ESysyn ESysyn is offline
Registered User
 
Join Date: May 2014
Location: HUNTSVILLE, AL
Posts: 46
Quote:
Originally Posted by KVNBKLYN View Post
Considering the 7 is an A division train (narrow trains) and the L is a B division (wider trains), that wouldn't be possible without completely rebuilding the platforms along one of the current lines, so, unlikely to happen.
Yep, it is an expensive longshot its too bad

Last edited by ESysyn; Aug 4, 2020 at 9:21 PM.
Reply With Quote
     
     
  #796  
Old Posted Jul 26, 2020, 4:25 AM
jamesinclair jamesinclair is offline
Registered User
 
Join Date: Dec 2005
Posts: 865
This is related to the new station, in that NJT is taking over the existing waiting area as Amtrak will be moving

Quote:
Amtrak and NJ TRANSIT have completed the first phase of the Ticketed Waiting Area refresh at New York Penn Station and opened the space for customers today at the Amtrak Concourse on the Upper Level and 8th Avenue side of the Station. As part of the refresh, customers can expect new furniture and fixtures, including seats with electrical and USB outlets to charge devices, an upgraded ceiling complete with new LED lighting, a new information desk and a second entrance in close proximity to the NJ TRANSIT concourse, offering easy access towards the 7th Avenue side of the Station.

The project, which includes a $7.2 million total joint investment between Amtrak and NJ TRANSIT, has already started construction on the second phase and is planned to be completed and opened by early Fall 2020. A temporary space to accommodate passengers during the construction period will be near Tracks 13 and 14.
https://www.njtransit.com/node/1257260
Reply With Quote
     
     
  #797  
Old Posted Aug 3, 2020, 9:32 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 51,747
It's official...


https://therealdeal.com/2020/08/03/f...=feature_posts

Farley gets Zucked: Facebook signs huge lease at Post Office redevelopment
The social media giant announced a broader work-from-home push earlier this year






August 03, 2020


Quote:
Facebook is officially coming to the Farley Post Office redevelopment, in what is certain to be a major boost for New York’s struggling office market.

The social media giant has signed a lease for 730,000 square feet of space at the property, landlord Vornado Realty Trust announced Monday.

Vornado CEO Steve Roth on Monday said in a prepared statement that Facebook’s decision “reinforces New York’s position as the nation’s second tech hub.” Robert Cookson, who oversees real estate for the social networking giant, said that the company looked forward to being a part of this iconic New York City landmark’s future for years to come.”

Facebook’s New York city office is currently located at Vornado’s 770 Broadway. The company also signed on last year for more than 1.5 million square feet nearby at Hudson Yards.



https://commercialobserver.com/2020/...y-post-office/

Quote:
“Facebook first joined New York’s vibrant business and tech community in 2007,” Robert Cookson, the vice president of real estate for Facebook, said in a statement. “Since that time, we’ve continuously grown and expanded our presence throughout the city. The Farley Building will further anchor our New York footprint and create a dedicated hub for our tech and engineering teams.”

The Farley space will be the second massive office that Facebook will have in the area. In November, Facebook signed a lease for more than 1.5 million square feet across three buildings in the nearby Hudson Yards.

It’s also reportedly in talks to take over Neiman Marcus’ 188,000-square-foot retail space in Hudson Yards to convert into office use, which Neiman Marcus said last month it would ditch as part of the department store’s bankruptcy proceedings.
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
Reply With Quote
     
     
  #798  
Old Posted Aug 3, 2020, 11:53 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 51,747
https://www.nytimes.com/2020/08/03/n...-building.html

Facebook Bets Big on Future of N.Y.C., and Offices, With New Lease
Despite the pandemic, the social media giant leased all the office space in the former main post office at Penn Station in Midtown.






By Matthew Haag
Aug. 3, 2020


Quote:
Facebook on Monday agreed to lease all the office space in the mammoth 107-year-old James A. Farley Building in Midtown Manhattan, cementing New York City as a growing global technology hub and reaffirming a major corporation’s commitment to an office-centric urban culture despite the pandemic.

With the 730,000-square-foot lease, Facebook has acquired more than 2.2 million square feet of office space in the city for thousands of employees in less than a year, all of it on Manhattan’s West Side between Pennsylvania Station and the Hudson River.

Apple, Amazon and Google all lease space in the same area, an emerging tech corridor.

The timing of the deal’s announcement was somewhat of a surprise because Facebook, which had expressed interest in the Farley Building for months, has given most of its employees the option of working from home during the pandemic. Even after the pandemic subsides, Facebook has said that within the next 10 years up to half of its roughly 52,200 employees across the country would work from home.
Quote:
Much of Manhattan’s business district remains a virtual ghost town with only a small fraction of workers filling office towers.

But Facebook has more than 4,000 employees in its offices in Manhattan now, up from about 2,900 employees at the beginning of the year.

The company’s new office spaces in Manhattan, at the Farley Building and further west at Hudson Yards, could allow Facebook to move another 8,500 workers to the city. The deal at Hudson Yards, signed late last year, includes 1.5 million square feet in three buildings.
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
Reply With Quote
     
     
  #799  
Old Posted Aug 4, 2020, 9:21 PM
ESysyn ESysyn is offline
Registered User
 
Join Date: May 2014
Location: HUNTSVILLE, AL
Posts: 46
Does this mean that 15 penn plaza is still happening?
__________________
Make good trouble
- John Lewis
Reply With Quote
     
     
  #800  
Old Posted Aug 5, 2020, 7:03 AM
citybooster citybooster is offline
Registered User
 
Join Date: Jun 2015
Posts: 420
The discussion seems to imply Madison Square Garden won't be moved. They have a lease only through 2023. That would be a perfect time to END it, and there is no reason why the Dolans need to be so indulged and pampered. There is NOTHING that should warrant an further expansion of that lease. The best opportunity for the Penn Station remodeling itself, now that Farley is that much closer to formally opening and looks great, is to push Madison Square Garden westward. Certainly lose the theater and anything else disrupting the connection to the streetscape with the station.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > General Development
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 7:57 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.