http://skyscraperpage.com/cities/?buildingID=131228
--/Note: The project description via the City of Boston has been updated for this project. The corrections below pertain to the same building proposal and only indicate fields that now have additional information that was previously missing. /--
Official sources:
http://www.bostonplans.org/projects/...chester-avenue
https://caughtinsouthie.com/living/s...orchester-ave/
Building Name:
323-365 Dorchester Avenue – West Residential Building
Street Address:
323-365 Dorchester Avenue
• Architect:
COOKFOX Architects
• Floor to floor height:
3.59M
Coordinates (with decimal fraction):
42.336081934165385, -71.05872581817528
Heights--
- roof:
88.4M (source: BPDA [Boston Planning & Development Agency] -
https://bpda.app.box.com/s/98c7g8vks...up3nomo0eu7zjp - page 55)
- top floor:
75.1M (source: BPDA [Boston Planning & Development Agency] -
https://bpda.app.box.com/s/98c7g8vks...up3nomo0eu7zjp - page 55)
Current Building Status:
Proposed
Construction Dates--
- anticipated completion:
2026
Above ground floors:
20
Gross Floor area:
19,649m2
Unit count:
130
Building Use(s):
Residential, retail, parking garage
Building Style(s):
Modern
Building Materials:
Brick, glass, metal, steel, concrete
-----------------------------------------------------
https://skyscraperpage.com/cities/?buildingID=132036
Official sources:
https://archboston.com/community/thr...rt.6335/page-3
Current Building Status:
Under Construction
Construction Dates--
- started:
2021
- will finish:
2024
Building Style(s):
Modern
Building Materials:
Glass, steel, metal, concrete
-----------------------------------------------------
https://skyscraperpage.com/cities/?buildingID=122228
Official sources:
https://www.bldup.com/posts/interior...eaport-offices
http://www.bostonplans.org/getattach...6-5a1966c25d1c
• Floor to floor height:
3.96M
Heights--
- roof:
75.9M (measured via source: BPDA [Boston Planning & Development Agency] -
http://www.bostonplans.org/getattach...6-5a1966c25d1c - page 11)
Current Building Status:
Built
Construction Dates--
- started:
2019
- finished:
2021
Above ground floors:
17
Underground floors:
3
Building Materials:
Glass, aluminum, steel, concrete