HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations


Reply

 
Thread Tools Display Modes
     
     
  #4821  
Old Posted Yesterday, 11:23 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,002
It's not 2020. Vaughan has surpassed the don't expect much to come of it as far as skyscrapers are concerned which is the topic at hand. It has 9 skyscrapers built and under construction. It doesn't matter if it's a shithole today or an oasis surrounded by a shithole. It is 3 subway stops from the second largest university campus in the GTA.
Reply With Quote
     
     
  #4822  
Old Posted Today, 2:35 PM
Maldive's Avatar
Maldive Maldive is online now
Registered User
 
Join Date: Sep 2004
Posts: 4,223
Yonge Street rising.


Albion_Sky


110 Eglinton East | 236.55m | 58s | Madison Group | Rafael Viñoly l pre-construction

One last angle on the proposal.


UT


CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre l Phase 2 u/c

Cool model of the CIBC Square twins (and park over the rail corridor).


cyclo

cyclo

reinventingthewheel

Riseth

From Rogers Centre (SkyDome) on the right.


reinventingthewheel

From Riverdale Park.


Rascacielo

mburrrrr

Reflected in the serrated gold of Royal Bank Plaza.


globalexpress


Toronto House | 186.53m | 58s | Westbank | Hariri Pontarini l nearly complete

One of the better executions in the gaggle of new builds in the Entertainment District.


rdaner

RyanD

Still working on the sidewalks in front of the beautifully restored heritage building.


AHK

Red Mars

Some curtain-wall light magic.


AHK


CAMH Discovery Centre | 41.6m | 7s | CAMH | KPMB l u/c

The jewel in the Discovery Centre crown (Centre for Addiction and Mental Health).


UT

UT

No room to move on site ;-).


rdaner

UT

cereal

Alley Kat


50 Scollard | 147.62m | 41s | Lanterra | Foster + Partners l u/c


Northern Light

Nifty white vertical cladding appearing.


Northern Light

Northern Light

Peeking through.


Benito

Johnny Au


KING Toronto | 57.6m | 16s | Westbank | Bjarke Ingels Group l u/c

Nice aerial of all the BIG’s lego creation with about 4 floors to go (“the east and west mountains”).


mr24

Stefan

UT

thecharioteer


36 Ellesmere | 45.7m | 12s | Starbank | BDP Quadrangle l Approved


UT

UT


888 Dupont | 53.9m | 14s | TAS | SA l pre-construction

This rental and retail building has been resubmitted at 17 storeys (now 246 rental units). Dupont Street is booming with 16 under construction projects
(mostly mid-rises) on or in neighbouring streets, and another 16 in the development pipeline
between Spadina and Dundas West.


No new renderings - original 14 storey version below:


UT


Bathurst Quay Revitalization | City of Toronto | Kearns Mancini l u/c

Silos - Before


bowen

Silos - After


70Challenger

Silos glimpsed from a distance.


kotsy

rdaner


St Lawrence Centre Redevelopment | CreateTO | Hariri Pontarini l pre-construction

The winning design turning the concrete bunker into a transparent, welcoming new theatre and concert hall.

Neat fly-through on INSTA:

https://www.instagram.com/reel/C6KJ7...e-30d242570f85
rdaner


UT

Concert Hall.


Link

UT
__________________
circa 2008: home of the 3rd best skyline in N.A. +++ circa 2028: home of the 2nd best skyline in N.A. (T-Dot)
Reply With Quote
     
     
  #4823  
Old Posted Today, 3:43 PM
Maldive's Avatar
Maldive Maldive is online now
Registered User
 
Join Date: Sep 2004
Posts: 4,223
1910 Yonge | 177.49m | 53s | Davpart | Graziani + Corazza l recommended for Approval

I doubt the Davisville community will be thrilled with this (does have rentals in the mix): now recommended for Approval. 53 and 48 storeys with a 1041 units in a rental/condo mix.


UT

UT

These monoliths below are proposed just up the street in the Davisville nabe (for heaven’s sake use some bloody orange or red brick and warm things up):

The Millwood | 157.6m | 45s | Times Group | Core Architects pre-construction


UT

UT


191 College | 95.18m | 31s | Unix Housing Group | Icon l recommended for Approval

A tall mass timber project with an affordable rental and market-rate rental mix is now recommended for Approval.


UT

UT
__________________
circa 2008: home of the 3rd best skyline in N.A. +++ circa 2028: home of the 2nd best skyline in N.A. (T-Dot)
Reply With Quote
     
     
  #4824  
Old Posted Today, 6:32 PM
BrickellBased BrickellBased is online now
Registered User
 
Join Date: Apr 2023
Location: Miami, FL
Posts: 189
Location. Location. Location.

Quote:
Originally Posted by WhipperSnapper View Post
It's not 2020. Vaughan has surpassed the don't expect much to come of it as far as skyscrapers are concerned which is the topic at hand. It has 9 skyscrapers built and under construction. It doesn't matter if it's a shithole today or an oasis surrounded by a shithole. It is 3 subway stops from the second largest university campus in the GTA.
Reply With Quote
     
     
  #4825  
Old Posted Today, 7:03 PM
Maldive's Avatar
Maldive Maldive is online now
Registered User
 
Join Date: Sep 2004
Posts: 4,223
Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini l u/c

SkyTower left of centre.

Kinda cool shot from a broker site. Thinking the photo was taken from the top of Libeskind’s “L Tower” on Yonge.


jackattack

mburrrrr

On the left is the prepped site of the 3 tower (up to 299 metres) Sugar Wharf Phase 2.


mburrrrr
__________________
circa 2008: home of the 3rd best skyline in N.A. +++ circa 2028: home of the 2nd best skyline in N.A. (T-Dot)
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 8:31 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.