High Speed 2 - Approved
After various consultations, the Transport Secretary Justine Greening has given the green light to High Speed Two. The initial £17bn stretch will run between London and Birmingham.
Following consultation with tens of thousands of interested parties, various amendments have been made to the current route:
- The line will be
in tunnel for around 22.5miles of its length (up 50%).
- An additional 56.5miles will be partially or totally hidden in cuttings, with a substantial reduction in the number of viaducts and embankments.
- Only five properties across the length of the line would experience high levels of noise.
- A commitment has been made to
plant two million trees along the route.
Aerial video from between Aylesbury and Birmingham:
http://www.bbc.co.uk/news/uk-16478954
An Ordnance Survey map of the route:
http://assets.dft.gov.uk/publication...5000issue3.pdf
Source: BBC: http://www.bbc.co.uk/news/uk-16478954
Some other notes:
- Upon completion of work of phase I (London - Birmingham) in 2026, there will be
11 trains per peak hour in each direction, with 10 trains per hour off-peak with a maximum capacity of 14 trains per hour.
- Once phase II is built,
peak-hour capacity in each direction will increase to 18 trains per hour.
- Upon the completion of phase II, it is expected that
270,000 passengers a day would use HS2 to Central London.
- The line is being built to international gauge and will include a connection to HS1 for journeys onwards to the continent.
- Planned operating speed is 225mph; however the line will be built for 250mph operations.
- The line would operate between 0500-2359 Monday-Saturday and 0800-2359 on Sundays.
- Trains will be
400m in length with seating capacity for 1,100.
- 27 sites were suggested for a London terminus; however the present West Coast Main Line terminus of London Euston will be rebuilt to cater to the 400m train sets.
- The pace of growth on the railways has been outstripping growth forecasts despite the economic climate meaning the present rail capacity limits will be reached sooner than predicted.
Proposals for the £15bn phase two branches to Manchester and Leeds are also being put forward, with recommendations to the government being announced later this year. Phase II would also incorporate a spur to Heathrow Airport, however with the potential development of a Thames Gateway Airport and a London-bypass HSR line this may not be needed.
The first phase will open in 2026, cutting journey times from London to Birmingham to 45 minutes. Journey times to Manchester and Leeds would be cut respectively by 68 and 88 minutes by 2032.
A Southeastern Shinkansen operating on High Speed 1
Image taken by UK-JPN on Flickr: http://www.flickr.com/photos/uk-jpn/...7627906625277/
HS2: Crossrail and London Overground Integration at Old Oak Common
jon10 over at skyscrapercity sourced these slides from
parkroyaltown.blogspot.com which illustrate Transport for London's (TfL) plans for the High Speed 2 station that would be built at Old Oak Common in west London.
With the proposed HS2 station at Old Oak Common, it is planned that an adjacent station would be built to serve the Great Western Main Line and Crossrail line, providing easy access from HS2 onto London Heathrow Airport.
Slide 1 illustrates the present plans for HS2 and Crossrail in the area. Presently the two London Overground lines (the North London Line and West London Line) skirt around the planned interchange but do not run via the planned site.
TfL have taken the view that the two London Overground lines could be diverted to create a new 18 platform interchange station that would drastically boost interchange and connectivity across and beyond London.
A subsequent development would be the West London Line being diverted away from its current terminus at Willesden Junction (just off the map to the north), and onto what is presently the freight-only Dudding Hill Line to terminate at Brent Cross, to create a brand new orbital rail route.
The North London Line would still call at Willesden Junction, but its course would be amended to create the Old Oak Common interchange, before rejoining the present route onto Richmond in south-west London.
The newly extended West London Line would create six new stations, four of which would interchange with other London Underground and National Rail lines, maximising the connectivity to HS2 and north-west London.
The second potential option is to re-route various West Coast Main Line commuter services onto Crossrail via Old Oak Common. This would:
- Significant relieve London Euston (the present WCML terminus) and the approach tracks, allowing for potentially more HS2 terminating platforms.
- Drastically reduce journey times for WCML commuters to the City and Canary Wharf.
- Maximise the track usage on the western section of Crossrail.
- Provide extensive connections to HS2 from a region which is growing fast.
Crossrail
Some photos of the construction work for the Canary Wharf station which is sunk into a dock. All images taken by
IanVisits at Flickr:
http://www.flickr.com/photos/ianvisi...th/6515449619/
Croxley Rail Link
Funding has been secured to construct the long-awaited Metropolitan Line extension to Watford Junction.
The present Watford Branch terminates at Watford station; however this will be sacrificed to allow for the line to be diverted eastwards on a disused alignment, before merging with the Watford DC London Overground Line at Watford High Street, before terminating at Watford Junction.
Two new stations will be constructed at Ascot Road and Watford General Hospital. Line frequency to Central London would be a train every 10 minutes, greatly expanding the journey options from Watford Junction.
There is also potential to re-utilise a south-western chord which would allow for Chiltern Railways to run non-Central London bound trains to Watford Junction, thus increasing regional connections to Watford.
Source: http://www.londonreconnections.com/
New Bus For London
The controversial 21st century Routemaster replacement for London's bendy-bus fleet was recently unveiled. The buses are part of Boris Johnsons' election pledge to bring back a Routemaster-equivalent bus which allowed passengers to literally hop-on or off the back of the bus.
This allowed for short dwell times at bus stops as people could easily access the bus without needing the bus to stop at a designated bus stop. Naturally however there was a cost; firstly the buses required conductors (in addition to the driver) who would check tickets, secondly people jumping off the bus at speed led to injuries and accidents. They are also proving to be quite costly (both in terms of being manufactured and the requirement to employ a conductor) and questionable in terms of passenger benefit.
Due to health & safety legislation, the rear platform will only be able to be used during the peak hours when a conductor is present. During off-peak hours, only the front and middle doors will open.
The buses incorporate two staircases to provide ease of access to the upper deck, and the 38 bus route from Victoria to Clapton will begin to receive its first vehicles sometime this year. Images taken by
DaveAFlett over at Flickr:
http://www.flickr.com/photos/9003948@N05/
New London Crossings
Various proposals for new crossings over the Thames have been made in the last few years, but with the exception of tube, train and DLR construction work, nothing much has taken off.
A major problem for East London is that road traffic is limited past Tower Bridge and the Rotherhithe Tunnel to the permanently congested Blackwall Tunnel and Queen Elizabeth Bridge (southbound) and Tunnels (northbound).
Recently the Mayor has sought to increase support for new crossings which is ironic considering it was he who originally put a hold on the Thames Gateway Bridge at the beginning of his term.
There are three crossings:
- The Thames Gateway Bridge which would link the missing link of the North (and to a partial extent the South) Circular roads.
- The Silvertown Crossing which would come in the form of a tunnel running from Silvertown to the Greenwich Peninsula to relieve the Blackwall Tunnels. This would be roughly on the same alignment as the presently under construction Cable Car.
- A Third Dartford Crossing, however this may not be sited adjacent to the present QE2 bridge and tunnel and may be sited further to the east and be incorporated as part of a tidal barrier in the previously mentioned Fosters’ Thames Hub airport project.
Sourced from The Evening Standard: http://www.thisislondon.co.uk/standa...-for-london.do
The Tube
According to figures released by Transport for London, Friday 9th December marked the highest number of passengers carried on the London Underground network in its 148 year history.
4.17mn passengers were carried across the network, which despite the mixed economic climate is up 7% year-on-year. The network also experienced its busiest every week (ending Sat 10th December) with 24.9mn journeys made.
Image taken by UK-JPN on Flickr: http://www.flickr.com/photos/uk-jpn/...n/photostream/
Information source:
TfL http://www.tfl.gov.uk/corporate/medi...tre/22218.aspx
London Cable Car
Construction is well underway on the Emirates Airline sponsored Cable Car that will link the ExCeL centre and 02 Arena. The rather pointless scheme is one of Boris Johnson’s pet projects to somehow appease his previous postponement of the Thames Gateway Bridge.
The first tower was recently completed. Image source from Londonist.com:
http://londonist.com/2011/12/first-c...-completed.php
And how the sponsored route will appear on the tube map.
Bank-Monument Tube Station Expansion
Bank-Monument is London’s 4th busiest tube station; consisting of an underground labyrinth located at the heart of the Square Mile consisting of the Central, Circle, District, Northern, Waterloo & City lines and DLR handling in excess of 43.5mn passengers each year.
The station is experiencing significant annual growth of 2mn passengers per annum, with the number of interchanges also substantially increasing by 42% in the past six years.
While Crossrail and Thameslink will assist in relieving some strain by 2018, an additional ticket hall will be constructed on King William Street which would enable for 4 x 40 person lifts to be installed allowing for step-free access to the Northern Line platforms.
A new southbound Northern Line tunnel will be constructed, while the present southbound platform tunnel will be converted into an additional passageway. New connecting tunnels would then feed into the Central Line and DLR platforms to increase interchange capacity. Construction would start in 2015 and last until 2021.
All images taken by
IanVisits at Flickr:
http://www.flickr.com/photos/ianvisi...th/6328793981/
Black = Current Northern Line
Green = DLR
Red = Central Line
White = Existing Underground Ticket Hall, Stairs & Escalators
Magenta = New Northern Line platform, connecting tunnels and King William Street ticket hall
The site for the future King William Street ticket hall
In addition, to the above plans, it is planned that as part of Bloomberg’s new office development at Wallbrook, an additional ticket hall will be built to allow for additional access to the Waterloo & City platforms.
Thameslink
Work on London’s north-south rail link continues.
London Bridge
Plans for the redevelopment of London Bridge station have been approved by Southwark Council. The works will see the number of terminating platforms (presently nine, in future six) sacrificed for more through platforms (presently six, in future nine); this will allow for greater segregation of services and increase frequencies along all lines into London Bridge, London Cannon Street, London Charing Cross and the Thameslink route via London Blackfriars.
In addition a new street-level concourse will be built to greatly expand the station's capacity during peak hours. Construction work will not commence until after the Olympics, and is set to be completed in 2018.
Images and walkthrough video sourced from
Network Rail (
http://www.networkrail.co.uk/aspx/12179.aspx) and other images from
Grimshaw Architects http://grimshaw-architects.com/project/london-bridge
• Video Link
Farringdon
Two aerial images of Farringdon station which illustrate a few of the recent developments at Farringdon:
- The recently opened new southern ticket hall (green roof).
- The original Farringdon station building (immediately across the road from the above); this will be regenerated in the coming months.
- The new Turnmill Street ticket hall (running to the right of the old station canopy).
- The nearly completed roof canopy extension to cover the northernmost platform section.
- The large plot immediately adjacent to the recently opened southern ticket hall will be the primary western entrance to the Crossrail platforms.
• Video Link
Video and images sourced from
Network Rail:
http://www.networkrailmediacentre.co...egoryID-8.aspx
West Hampstead
A before and after image of developments at West Hampstead Thameslink; the original station entrance is being retained and expanded, while a far larger station hall has been constructed to provide step-free access and greater cover for passengers using the station.
• Video Link
Video and images sourced from
Network Rail:
http://www.networkrailmediacentre.co...egoryID-8.aspx
Peterborough
Located on the East Coast Main Line, Peterborough is an important north-south London & intercity commuter and east-west freight junction that is 120km north of London.
Despite its distance from London, the fast straights on the ECML allow for journey times of under an hour. In addition the station also offers a London bound train every five minutes at the peak which makes the area an attractive commuter destination with 4mn passengers using the station. (passenger journeys are up 30% in the last decade).
Passenger journeys are up 30% in the last decade and with Peterborough becoming a northern terminus for Thameslink, Network Rail expect London-bound passenger volumes to significantly increase; doubling within the next twenty years. Subsequently to cope with this, work has started on extensive redevelopment to allow for higher train frequencies and longer trains.
At present the station has five platforms, this will increase to seven, with present platforms widened and extended to cope with the longer Thameslink train sets and future Intercity Express trains. The concourse will also be significantly enlarged and modernised, while a new step-free footbridge to all platforms will be constructed.
In addition due to the station's national importance from the eastern ports to the Midlands, a new goods loop will also be built to increase cross-country freight movements.
Images sourced from
Network Rail.
Cambridge Station Expansion
Opened in 1845 to service the famous university city, the station is a major rail junction and terminus for various commuter and rural services handling 7.6mn passengers per annum.
While a destination in its own right due to the various university-related education & business activities and tourist attractions, the station is also a major London commuter station, with ten London bound services each peak hour into two London termini (London King's Cross and London Liverpool Street).
Prior to December, the station had a complex configuration of six platforms (two north and two London-facing bay platforms), of which two platforms were a single 'joined' platform just shy of 500m in length. This peculiar layout meant that there was only one platform for trains running north beyond Cambridge from London and vice versa for trains in the other direction, constricting train movements.
The station also lacked sufficient London-bound platform capacity for terminating services.
Furthermore, with stations along the West Anglia Main Line into London Liverpool Street in the process of being extended (e.g. Broxbourne, Cheshunt and Sawbridgeworth) to handle 12 carriage class 379 services, a brand new island platform has been built to support terminating services.
Image and information sourced from
Network Rail:
http://www.networkrail.co.uk/Longer-...e-station.aspx
Croydon Tramlink
The successfull south London tram network has received the first of several new trams from Stadler to cope with increased demand on the 28km network. The new trams are 2.5m than the present Bombardier fleet.
Picture taken by Andrew Grantham: http://www.flickr.com/photos/andrewg...n/photostream/
Carriage Capacity Upgrades
Southern
It was recently announced (
http://www.rail.co/2012/01/03/southe...ding-contract/) that Southern have placed a £190mn order with Bombardier for 13 new class 377 sets (formed of 2x5 carriages, 130 carriages in total) which will assist with congestion relief on metro routes into London Victoria with delivery due in the latter half of 2012.
Various platforms at stations such as Balham are being extended to cope with the extended trains. In addition, these new carriages will support Southern's already sizable 700 carriage fleet of class 377's.
Source: UK-JPN on Flickr: http://www.flickr.com/photos/uk-jpn/...n/photostream/
South Western Trains
South West Trains have announced that they are seeking an additional 60 carriages to increase train lengths on Windsor Line trains by two carriages to 10 carriages. The present line is exceptionally busy with 54mn passengers per annum (up 4.4% year-on-year).
An additional three London Waterloo bound services will also be introduced (two from Reading and another from Hounslow) to boost line frequencies. The former Waterloo International platform 20 (which was mothballed following the move of Eurostar services to London St Pancras) will be utilised for the additional services come 2014, relieving platform congestion at London Waterloo.
Source:
http://www.rail.co/2011/12/23/london...k-time-trains/
Colchester Station Upgrade
Located to the east of London on the Great Eastern Main Line, Colchester station which handles 4.3mn passengers a year is the primary transport hub for what was once the capital of Roman Britain.
Historically, the southern entrance was the primary access point due to the geographical proximity to the town, however a modern northern entrance was created to accommodate a car park.
Subsequent changes in transport use and growth in passenger flows has meant that the old entrance has now been brought back into use. Further information:
http://www.rail.co/2011/12/23/offici...ester-station/
Taken by Always Santa Fe over at Flickr: http://www.flickr.com/photos/tunnel_...n/photostream/
Bromley South Expansion
Work has begun on expanding the capacity of the south-east London station including two new lifts and an expanded ticket concourse.
The station which handles 20 London bound trains per hour at rush hour is a major commuter station.
Source: Network Rail, http://www.networkrail.co.uk/Bromley-South-station.aspx
Heathrow Terminal 2
Work on the superstructure of Heathrow’s newest terminal is nearing completion.
Image taken by Mic V. on Flickr (Source: http://www.flickr.com/photos/micswor...n/photostream/)
East London Line Extension
Work continues on the second phase of the ELLE which will see the creation of a branch between Surrey Quays to Clapham Junction, completing the London Overground orbital route around Central London.
Clapham Junction bound services will branch off the present ELL south of Surrey Quays onto a brand new 2.5km alignment. The new rail link will also see the opening of a new station: Surrey Canal Road which is being funded by a developer who plans to build a £850mn 2,400 home development adjacent to the line.
The line then connects up to the present Inner South London Line, boosting frequencies and improving orbital interchanges at Queen’s Road Peckham, Peckham Rye, Denmark Hill, Clapham High Street, Wandsworth Road and Clapham Junction.
On approach to Clapham Junction, London Overground trains will run under the London Victoria & Waterloo approach tracks to terminate at platform two and same-platform interchange with the West London Line.
Unfortunately due to the geography of the line, interchange stations at Brixton and Loughborough Junction would be expensive, however in the future stations could be built if there was a sufficient business case.
Once the line is opened in the latter half of this year, frequencies via the central route of the ELL will increase to a train every 3 minutes.
All images sourced from
London Reconnections:
http://www.londonreconnections.com/
The 4 southern branches of the ELL that maximise rail interchanges across the south London rail network