A major overhaul of Paris Gare du Nord.
Completion for 2023

New passengers halls and a shopping mall will be constructed
Departure and arrival flows will be separated.



http://www.leparisien.fr/info-paris-...16-6228948.php
Reply With Quote
     
     
  #562  
Old Posted Oct 23, 2016, 2:35 PM
Minato Ku's Avatar
Minato Ku Minato Ku is offline
Tokyo and Paris fan
 
Join Date: Jul 2006
Location: Paris, Montrouge
Posts: 4,168
Gare du Nord
The current main hall will become the arrival hall for the mainline trains while a new departure hall will be build above the tracks behind it.

Terminal de départ
Departure hall


Terminal d'arrivée
Arrival hall


Terminal Transmanche)
The Eurostar terminal will be built on the west side the station.


Pôle Francilien
On the east side where is located the suburban terminal, a massive new building will be built.
This will be the heart of the station with shopping mall.
It will link the arrival, departure terminals and the urban and suburban transports.








This picture shows the acces to the departure terminal from the new eastern building Pôle Francilien.


It's not a small renovation, it's a massive overhaul of Gare du Nord.
All this must be done with minimal disruption to the operation of the station.
Reply With Quote
     
     
  #563  
Old Posted Oct 23, 2016, 4:27 PM
mousquet's Avatar
mousquet mousquet is offline
Registered User
 
Join Date: Jan 2011
Location: Greater Paris, France
Posts: 4,556
Whoa, looks like the work done on Saint-Lazare raised some better ideas.
Serious improvement over the current suburban terminal.


https://fr.wikipedia.org/wiki/Transilien_Paris-Nord

Nothing really obnoxious, but it only looks sloppy compared to the adjoining historic terminal.
More retail will be welcome too, so the station grows a little more entertaining.
Quote:
Originally Posted by Minato Ku View Post
All this must be done with minimal disruption to the operation of the station.
Lol, ok. See you everyone in a couple of decades for completion, then.
Reply With Quote
     
     
  #564  
Old Posted Oct 23, 2016, 9:17 PM
Minato Ku's Avatar
Minato Ku Minato Ku is offline
Tokyo and Paris fan
 
Join Date: Jul 2006
Location: Paris, Montrouge
Posts: 4,168
The objective is to complete the renovation before 2024.
Reply With Quote
     
     
  #565  
Old Posted Mar 6, 2017, 8:35 PM
Minato Ku's Avatar
Minato Ku Minato Ku is offline
Tokyo and Paris fan
 
Join Date: Jul 2006
Location: Paris, Montrouge
Posts: 4,168
Connection between Gare du Nord and Gare de l'Est.

Two things are planned.
Improving the connection at street level between the two stations and the construction of a tunnel

...

1 - Improving pedestrian travel

This first aspect is based on rue d'Alsace and rue de Dunkirk, with work on pedestrian traffic and improvement of signage.
Work on the surrounding of the Magenta station will also be realized. Its square could be redeveloped, there are studies on a building SNCF located nearby on 50 rue d'Alsace. This sector of convergence between stations could make possible to open Gare de l'Est with Gare du Nord.



2 - Creating an underground link

The second major point of the project is to connect two tunnels: the Château-Landon tunnel, which crosses all the platforms of Gare de l'Est, and the tunnel under the Magenta station to the platforms of Gare du Nord.
Château-Landon tunnel now allows access via stairs to the platforms of the Gare de l'Est. It would be renovated, and elevators would be built, as far as possible, to access certain platforms of the Gare de l'Est from the tunnel for people with reduced mobility.
By digging an additional 60 meters of tunnel under Rue La Fayette, a large subterranean link to Gare du Nord would be built.



...

http://www.nouvelle-liaison-gare-nor...pes-du-projet/
Reply With Quote
     
     
  #566  
Old Posted Mar 26, 2017, 12:18 PM
Minato Ku's Avatar
Minato Ku Minato Ku is offline
Tokyo and Paris fan
 
Join Date: Jul 2006
Location: Paris, Montrouge
Posts: 4,168
Renovation of Auber.

That's it, Auber will be renovated.
Work should be done by 2022. The station will keep most of its original style.

There will be a change of floors on the platforms and in the main concourse, with a tiled floor covering. The lighting will be redesigned.
To optimize the space, the project aims to remove dark nooks and crannies.
Paris transit autorities wishes to highlight Auber's heritage by using Briare enamels (original material) to best match the exceptional volumes of the station and to retain the original colors (red and blue).









https://twitter.com/STIFidf/status/844534500239560704
Reply With Quote
     
     
  #567  
Old Posted Mar 26, 2017, 12:36 PM
Minato Ku's Avatar
Minato Ku Minato Ku is offline
Tokyo and Paris fan
 
Join Date: Jul 2006
Location: Paris, Montrouge
Posts: 4,168
Val de Fontenay
Presentation of redevelopment projects for Val de Fontenay.
By 2030, the traffic of the station (today served by the RER A and E) will greatly increase with the arrival of two metro lines (lines 1 and 15), tram T1 and the development of surrounding neighborhood.

The station must be redesigned

Video Link

Video in French
Reply With Quote
     
     
  #568  
Old Posted Jul 1, 2017, 9:03 AM
mousquet's Avatar
mousquet mousquet is offline
Registered User
 
Join Date: Jan 2011
Location: Greater Paris, France
Posts: 4,556
They're starting to operate HSR connecting Bordeaux and Rennes to Paris as of today.

Quote:
New high speed LGV trains rolling full steam ahead
[...]
Two new LGV (Lignes à grande vitesse) trains will roll into their respective stations in Rennes and Bordeaux today, with some important people aboard.
[...]
Construction of the new LGV lines began in 2012 and the development will put Rennes an hour and a half from Paris, while the 370 mile distance from Paris to Bordeaux will be covered in just two hours.
[...]
The Paris-Rennes line is an extension of a track which already runs to Le Mans. It is believed the extension of the line as far as Rennes will benefit smaller towns on the Brittany coast.

A future LGV line is planned to extend to the far south of France, connecting Paris with Montpellier is just over three hours.
https://www.connexionfrance.com/Fren...ll-steam-ahead

If I recall correctly, this stands for a €12-billion investment in all, while SNCF is facing harsh criticism for neglecting the much smaller regional lines all over the country.
They've been spending too much of their money in HSR national infrastructures, so they can't afford keeping second-rate regional lines up-to-date.

That's the wrong side of such a thing. Otherwise, it's all fine.
Reply With Quote
     
     
  #569  
Old Posted Jul 1, 2017, 11:43 PM
Minato Ku's Avatar
Minato Ku Minato Ku is offline
Tokyo and Paris fan
 
Join Date: Jul 2006
Location: Paris, Montrouge
Posts: 4,168
A short visit of the new T11 Express.
The line is fully segregrated.

























Interior














RER B seen from the platforms of the T11 at Le Bourget
Reply With Quote
     
     
  #570  
Old Posted Jul 2, 2017, 6:39 PM
mousquet's Avatar
mousquet mousquet is offline
Registered User
 
Join Date: Jan 2011
Location: Greater Paris, France
Posts: 4,556
Quote:
Originally Posted by Minato Ku View Post
The line is fully segregrated.
Except for the fact that these trains are only trams, by far smaller, it looks much the same as a RER or Transilien line in your pictures.

I hear the Tangentielle Ouest (T13) will partly be the same, but it will cross urban streets in their dedicated lanes like regular local trams do, as a so called tram-train, which explains the need for these much smaller vehicles.

Maybe this one up north does the same, though?

Edit: stuff has to make sense, so I looked for an answer.
The tram-train above will indeed cross some urban fabric as a tram when the line is extended, if it doesn't yet.
The line is designed to eventually go from Noisy-le-Sec up to Sartrouville, which is big. Roughly 20 miles.
However, it will take time before this long route is complete. At least 10 years, they say.

Last edited by mousquet; Jul 2, 2017 at 9:22 PM.
Reply With Quote
     
     
  #571  
Old Posted Jul 4, 2017, 1:09 AM
White Pine White Pine is offline
Registered User
 
Join Date: Jan 2010
Posts: 391
How is this line working? Ottawa is doing something similar with trams except it will be the spine of their network. :/
Reply With Quote
     
     
  #572  
Old Posted Jul 4, 2017, 12:43 PM
mousquet's Avatar
mousquet mousquet is offline
Registered User
 
Join Date: Jan 2011
Location: Greater Paris, France
Posts: 4,556
Well, if you're curious, Greater Paris's line T4 partly implements such a 'tram-train' already.
I think Wiki's article is good enough to begin with.

https://en.wikipedia.org/wiki/%C3%8E...tramway_Line_4

Was the 1st line in France to implement that technology to solve the problem of railroad crossings along.
Only partly, however, cause it doesn't cross any real urban environment or street.
It is nonetheless an available option for some prospective extension of it, but for now, it's just an old line that needed lighter vehicles to deal with railroad crossings.

This hybrid tram-train tech is only in an early stage here, so it doesn't seem fully satisfying or efficient yet. Further experience will bring about improvement.
Reply With Quote
     
     
  #573  
Old Posted Aug 13, 2017, 12:35 PM
Minato Ku's Avatar
Minato Ku Minato Ku is offline
Tokyo and Paris fan
 
Join Date: Jul 2006
Location: Paris, Montrouge
Posts: 4,168
Château Rouge

After a closure of one year, Château Rouge on line 4 reopened at the beginning of August.
They enlarged the ticket hall and created a new access to cope with the crowd.

New access

Larger ticket hall





Platforms are still under renovation work.
As the line 4 will become driverless, they will install platform doors. They wait this installation before completing the renovation.
Reply With Quote
     
     
  #574  
Old Posted Dec 10, 2017, 11:05 AM
Minato Ku's Avatar
Minato Ku Minato Ku is offline
Tokyo and Paris fan
 
Join Date: Jul 2006
Location: Paris, Montrouge
Posts: 4,168
Cours Emilion, new entrance


DSC07077 by Minato ku, sur Flickr


DSC07070 by Minato ku, sur Flickr


DSC07072 by Minato ku, sur Flickr


DSC07069 by Minato ku, sur Flickr


DSC07063 by Minato ku, sur Flickr


Cours Saint-Emilon by Minato ku, sur Flickr
Reply With Quote
     
     
  #575  
Old Posted Dec 10, 2017, 3:36 PM
mousquet's Avatar
mousquet mousquet is offline
Registered User
 
Join Date: Jan 2011
Location: Greater Paris, France
Posts: 4,556
The stations of line 14 are some of our best IMO, and undeniably.
It's all modern and comfortable in there. The dirty homeless won't piss those...
There's even some sort indoor garden on the platforms of Gare de Lyon.


https://en.wikipedia.org/wiki/Paris_M%C3%A9tro_Line_14

Nice change from the traditional ceramics or whatever the materials are to older lines.

The new lines currently under construction should feature the same comfort.
It's going to feel good. Héhé.
Reply With Quote
     
     
  #576  
Old Posted Dec 10, 2017, 5:06 PM
Busy Bee's Avatar
Busy Bee Busy Bee is offline
Show me the blueprints
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 10,301
Cours Emilion looks terrific. RATP sure does it right.
__________________
Everything new is old again

There is no goodness in him, and his power to convince people otherwise is beyond understanding
Reply With Quote
     
     
  #577  
Old Posted Jun 7, 2018, 8:31 PM
Minato Ku's Avatar
Minato Ku Minato Ku is offline
Tokyo and Paris fan
 
Join Date: Jul 2006
Location: Paris, Montrouge
Posts: 4,168
Platform doors at Mouton-Duvernet.
The line 4 will become driverless, the first platform doors are being installed at Mouton Duvernet.


Façade de quai by Minato ku, sur Flickr


Façade de quai by Minato ku, sur Flickr
The first door is working (there is only one )

Façade de quai by Minato ku, sur Flickr


Façade de quai by Minato ku, sur Flickr


Façade de quai by Minato ku, sur Flickr


Façade de quai by Minato ku, sur Flickr


Façade de quai by Minato ku, sur Flickr


Façade de quai by Minato ku, sur Flickr
Reply With Quote
     
     
  #578  
Old Posted Jun 7, 2018, 8:49 PM
mousquet's Avatar
mousquet mousquet is offline
Registered User
 
Join Date: Jan 2011
Location: Greater Paris, France
Posts: 4,556
Fine. I wish they did the same on all lines, especially to the endless 7, 8 and 9, by downright suppressing several stops along the routes.

Do you sometimes ride these? I have line 8 next door and take RER D as much as possible instead.
It takes like half an hour to get to Strasbourg-Saint-Denis or Opéra from Maisons-Alfort's École Vétérinaire, that's simply not acceptable on a daily basis.

The inner subway network has far too many stops. Still stuck in the belief that Central Paris is the center of the world, while the suburbs all around will very soon be much busier, if not already.
Reply With Quote
     
     
  #579  
Old Posted Jun 8, 2018, 2:11 PM
ardecila's Avatar
ardecila ardecila is offline
TL;DR
 
Join Date: Jun 2006
Location: the city o'wind
Posts: 16,356
Those platform doors on Line 4 really spoil the wide-open feel of the arched Metro station. The platforms feel much more cramped after doors are installed.

I remember shorter doors on Line 1, they didn't have the same architectural problem and seemed much better IMO. I wonder why Line 4 is getting tall ugly doors?
__________________
la forme d'une ville change plus vite, hélas! que le coeur d'un mortel...
Reply With Quote
     
     
  #580  
Old Posted Jun 8, 2018, 4:22 PM
mousquet's Avatar
mousquet mousquet is offline
Registered User
 
Join Date: Jan 2011
Location: Greater Paris, France
Posts: 4,556
^ Hm, I hadn't thought of that aspect.
It's true that when platforms are crowded, it might feel a bit oppressive like a narrow corridor.

The priority is only to improve traffic fluidity and frequency. They picked this line to be automated precisely because it must be a busiest of the network.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 10:37 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.