Old Posted Feb 24, 2021, 9:10 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Would not be surprised to see them wait after the first tower a couple of years. If they rent all the units in first tower immediately with demand for more they may go ahead with next phase or they could wait years. Market conditions will determine.
Reply With Quote
     
     
  #142  
Old Posted Feb 24, 2021, 9:36 PM
TallerIsBetter TallerIsBetter is offline
Registered User
 
Join Date: Oct 2015
Posts: 182
Isn't there insane demand right now? If I were a Toronto person about to retire and sell my house for 1.5M and had a connection to London (say went to Western and liked it). Pocket the 1.5M and rent something super nice in a new snazzy tower in London for $2200/ mo. Set for life.
Reply With Quote
     
     
  #143  
Old Posted Feb 24, 2021, 10:36 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
London apartment vacancy rate has increased due to pandemic and lack of out of town students at Fanshawe and Western. Still to be seen is will the students come back in Sept or will we see it drawn out over future years?
Reply With Quote
     
     
  #144  
Old Posted Feb 25, 2021, 2:07 AM
Djeffery Djeffery is online now
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 4,522
Quote:
Originally Posted by TallerIsBetter View Post
Isn't there insane demand right now? If I were a Toronto person about to retire and sell my house for 1.5M and had a connection to London (say went to Western and liked it). Pocket the 1.5M and rent something super nice in a new snazzy tower in London for $2200/ mo. Set for life.
I don't know if any of the $2200 units are all that snazzy. My inlaws live in an Old Oak building in the burbs and pay around that for 2 bed, 2 bath, and I would say their unit is nice, but not really snazzy. I imagine a similar unit downtown would be a fair chunk more.
Reply With Quote
     
     
  #145  
Old Posted Mar 24, 2021, 5:03 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Major concrete pour today with half dozen cement trucks onsite and pump truck. Suspect they are pouring the floating slab foundation for building.
Reply With Quote
     
     
  #146  
Old Posted Apr 22, 2021, 5:10 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Still working at bottom of pit. Some concrete being poured likely for elevator/stairwell shaft base.
Reply With Quote
     
     
  #147  
Old Posted May 17, 2021, 12:16 AM
ssiguy ssiguy is online now
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 10,714
Anything going on at this site? Will it begin to rise above grade by late summer?
Reply With Quote
     
     
  #148  
Old Posted May 17, 2021, 1:50 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Very little progress. Still in the pit and they don't appear to have many workers on site. You'd think given the small footprint they would have got some of the perimeter walls and elevator shaft and posts completed by now.



Quote:
Originally Posted by ssiguy View Post
Anything going on at this site? Will it begin to rise above grade by late summer?
Reply With Quote
     
     
  #149  
Old Posted Jun 9, 2021, 4:29 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Able to glimpse south side of pit where they are now forming the L1 floor slab. Would imagine that they have now poured and formed most of the L2 level walls and posts. For such a small footprint progress is very slow.
Reply With Quote
     
     
  #150  
Old Posted Jun 23, 2021, 2:17 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Now forming the L1 walls after pouring the L1 floor slab. Given the small footprint this should move quickly and we should see the ground floor slab forming in July.
Reply With Quote
     
     
  #151  
Old Posted Jul 18, 2021, 6:27 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Looks like most of the L1 walls are now poured. Should see forming and steel rebar for the ground floor slab soon.
Reply With Quote
     
     
  #152  
Old Posted Jul 31, 2021, 2:29 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Milestone with the ground floor slab now poured. Even have some of the steel rebar and forms for ground floor walls and posts up. Hopefully the pace can now pick up since they are above ground.
Reply With Quote
     
     
  #153  
Old Posted Aug 6, 2021, 12:24 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
HIA dated 2015 - for future reference


https://pub-london.escribemeetings.c...cumentId=19984


plus artist rendering of 25s tower


- https://l360arch.com/signature-downt...truction-boom/
Reply With Quote
     
     
  #154  
Old Posted Aug 6, 2021, 3:27 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
First ground floor posts are now poured. Alot of elevator/stairwell shaft core steel and forming happening now.
Reply With Quote
     
     
  #155  
Old Posted Aug 6, 2021, 7:02 PM
That_Chris That_Chris is offline
Registered User
 
Join Date: Oct 2011
Posts: 60
Is it weird that I worry that this will end up with only phase one being built? Really hope we get more news or an updated timeline on phase 2 and 3.
Reply With Quote
     
     
  #156  
Old Posted Aug 6, 2021, 7:33 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Not weird at all. I share the same thoughts in regards to seeing the next phase built.



Quote:
Originally Posted by That_Chris View Post
Is it weird that I worry that this will end up with only phase one being built? Really hope we get more news or an updated timeline on phase 2 and 3.
Reply With Quote
     
     
  #157  
Old Posted Aug 7, 2021, 2:04 AM
TallerIsBetter TallerIsBetter is offline
Registered User
 
Join Date: Oct 2015
Posts: 182
I'm only guessing but the work they are doing to King seems very intensive and I would not be surprised if much of that is to support very high density along the King Bus loop. I would think the increase from 19 to 25 floors for this phase may be followed by a similar increase to the original 32 and 35 storey proposals. There was threatened (or was it actual?) ligation that was settled with the City, and I would not be surprised if that might include height increase bonusing/higher density/affordable units. The 181 King proposal was originally a vague 25 storey proposal, but I believe the last I saw was a render image for a really nice 38-ish floor tower.

That bus corridor would be where the city wants highest density so we'll see. Also one is a parking lot and the honestly any attempt to restore 181 seems impractical and unlikely, regardless of merits, as it probably continues to decline in structural stability.
Reply With Quote
     
     
  #158  
Old Posted Aug 22, 2021, 1:48 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Most of the 1st floor walls are now poured and formed. Still have some of the south side to finish. This is the ground floor lobby level so the height is extra tall. Of note the building immediately to the east has some rather large and growing cracks in the south facing wall. The exterior bricks have separated and it appears the SW corner is leaning to the SW.

Last edited by jammer139; Aug 22, 2021 at 2:17 PM.
Reply With Quote
     
     
  #159  
Old Posted Sep 23, 2021, 4:15 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Nearly done pouring the 2nd floor walls.
Reply With Quote
     
     
  #160  
Old Posted Sep 25, 2021, 11:42 PM
ssiguy ssiguy is online now
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 10,714
I rather like this building.

It's amazing how many buildings are going up in the inner city area that are all roughly just above the garage level...........Talbot/Dundas/SoHo/. Within 2 years, the city's skyline will have noticeably improved and it's great to see all these parking lots quickly getting filled up.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 10:31 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.