Old Posted Aug 4, 2017, 4:09 PM
dsmmace dsmmace is offline
Registered User
 
Join Date: Jun 2012
Location: Saskatoon
Posts: 423
As indicated previously, the red Stuart Olson crane would come down and a new Pagnotta one will be going in. A second one will be going in for the other parkade and tower than Ledcor is the General Contractor on. I haven't heard who is doing the structural work for them yet.
Reply With Quote
     
     
  #802  
Old Posted Aug 4, 2017, 4:39 PM
mitchellk12's Avatar
mitchellk12 mitchellk12 is offline
Moderator
 
Join Date: Sep 2015
Location: Saskatoon, SK
Posts: 652
Quote:
Originally Posted by dsmmace View Post
As indicated previously, the red Stuart Olson crane would come down and a new Pagnotta one will be going in. A second one will be going in for the other parkade and tower than Ledcor is the General Contractor on. I haven't heard who is doing the structural work for them yet.
thanks. wasnt sure if there were 2 cranes for the hotel/condo seeing as theyre completion dates are different. i guess 1 can do it all
Reply With Quote
     
     
  #803  
Old Posted Aug 4, 2017, 9:39 PM
Crisis's Avatar
Crisis Crisis is offline
Registered User
 
Join Date: Apr 2010
Posts: 1,225
Interesting. Last I heard, Pagnotta was going to be using 2 cranes for the hotel & condo towers.
Reply With Quote
     
     
  #804  
Old Posted Aug 8, 2017, 3:17 PM
The Bess The Bess is offline
Registered User
 
Join Date: Apr 2008
Posts: 854
Reply With Quote
     
     
  #805  
Old Posted Aug 8, 2017, 3:39 PM
mitchellk12's Avatar
mitchellk12 mitchellk12 is offline
Moderator
 
Join Date: Sep 2015
Location: Saskatoon, SK
Posts: 652
Quote:
Originally Posted by The Bess View Post
Glad to know they have faith in Saskatoon. Now lets get that North office tower going too.
Reply With Quote
     
     
  #806  
Old Posted Aug 8, 2017, 3:43 PM
mitchellk12's Avatar
mitchellk12 mitchellk12 is offline
Moderator
 
Join Date: Sep 2015
Location: Saskatoon, SK
Posts: 652
Quote:
Originally Posted by Crisis View Post
Interesting. Last I heard, Pagnotta was going to be using 2 cranes for the hotel & condo towers.
Same here, either way..its going to be off the ground soon. 1 crane or 2 i'm excited to see the finished product in the end.
Reply With Quote
     
     
  #807  
Old Posted Aug 10, 2017, 2:45 AM
The Bess The Bess is offline
Registered User
 
Join Date: Apr 2008
Posts: 854
Definately going to be interesting to see how they position the 3 cranes on site
Reply With Quote
     
     
  #808  
Old Posted Aug 11, 2017, 2:55 PM
prairieguy prairieguy is offline
Registered User
 
Join Date: Apr 2007
Posts: 1,488
Just enjoying a morning coffee at Good Earth Cafe across the street from the site, and they are definitely starting the backfill process and "digging in" to that mound of soil and dumping it back into the hole. Hopefully it won't be long before the mound of dirt is gone and another crane is erected on that location. Lots of activity at the site currently.
Reply With Quote
     
     
  #809  
Old Posted Aug 12, 2017, 1:14 AM
dsmmace dsmmace is offline
Registered User
 
Join Date: Jun 2012
Location: Saskatoon
Posts: 423
Some delays in schedule, the raft slab should have our whole crew on with two concrete pumps, we don't see these kind of pours every day in Saskatchewan. Should take place sometime next week.
Reply With Quote
     
     
  #810  
Old Posted Aug 14, 2017, 2:16 PM
Crisis's Avatar
Crisis Crisis is offline
Registered User
 
Join Date: Apr 2010
Posts: 1,225
Quote:
Originally Posted by dsmmace View Post
Some delays in schedule, the raft slab should have our whole crew on with two concrete pumps, we don't see these kind of pours every day in Saskatchewan. Should take place sometime next week.
Are you talking about the main floor slab? I presume that it's a big pour containing some pretty large transfer beams to take the loads from the towers above.
Reply With Quote
     
     
  #811  
Old Posted Aug 15, 2017, 3:47 AM
dsmmace dsmmace is offline
Registered User
 
Join Date: Jun 2012
Location: Saskatoon
Posts: 423
Correct, hopefully the transfer slab will take place this Friday. We have other work to move onto! ;-)
Reply With Quote
     
     
  #812  
Old Posted Aug 15, 2017, 3:58 PM
prairieguy prairieguy is offline
Registered User
 
Join Date: Apr 2007
Posts: 1,488
Quote:
Originally Posted by dsmmace View Post
Correct, hopefully the transfer slab will take place this Friday. We have other work to move onto! ;-)
Would that be the office tower??!!
Reply With Quote
     
     
  #813  
Old Posted Aug 18, 2017, 3:33 AM
dsmmace dsmmace is offline
Registered User
 
Join Date: Jun 2012
Location: Saskatoon
Posts: 423
Transfer slab pour starts at 4am...
Reply With Quote
     
     
  #814  
Old Posted Aug 18, 2017, 10:41 PM
prairieguy prairieguy is offline
Registered User
 
Join Date: Apr 2007
Posts: 1,488
stopped by around 1pm today and it looked like about 2/3 had been poured and "levelled". Can't wait to see this start going "up"!
Reply With Quote
     
     
  #815  
Old Posted Aug 19, 2017, 1:29 AM
dsmmace dsmmace is offline
Registered User
 
Join Date: Jun 2012
Location: Saskatoon
Posts: 423
Yeah, the concrete wasn't ready for trowels until after ~2pm. We ending up with 682m3 on this pour.

I believe we are scheduled to be there tomorrow to finish up the ramp entrance.
Reply With Quote
     
     
  #816  
Old Posted Aug 21, 2017, 4:05 PM
Ricopedra Ricopedra is offline
Registered User
 
Join Date: Nov 2008
Posts: 729
Anyone doing a drive-by, in the vicinity like, with an image-capturing device?

Last edited by Ricopedra; Aug 22, 2017 at 12:37 AM. Reason: more concise
Reply With Quote
     
     
  #817  
Old Posted Aug 21, 2017, 10:36 PM
YXE YXE is offline
Registered User
 
Join Date: Jun 2017
Posts: 275
Has anyone heard anything about the restaurant that is planned to be located on the southeast side of the condo? I'm wondering if they have something lined up already or if it will be 'for lease' for a while when it opens.
Reply With Quote
     
     
  #818  
Old Posted Aug 22, 2017, 1:32 PM
mitchellk12's Avatar
mitchellk12 mitchellk12 is offline
Moderator
 
Join Date: Sep 2015
Location: Saskatoon, SK
Posts: 652
Quote:
Originally Posted by YXE View Post
Has anyone heard anything about the restaurant that is planned to be located on the southeast side of the condo? I'm wondering if they have something lined up already or if it will be 'for lease' for a while when it opens.
it wont be, its a great area, someone will open something up quickly.
Reply With Quote
     
     
  #819  
Old Posted Aug 22, 2017, 2:39 PM
The Bess The Bess is offline
Registered User
 
Join Date: Apr 2008
Posts: 854
Ya i can't see someone not taking advantage of that location being that we have so few restaurants next to the river.
Reply With Quote
     
     
  #820  
Old Posted Aug 22, 2017, 3:11 PM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 328
I usually cycle past the site on my way home from work. For the first time ever there were no workers on site at 5:30 on a Monday (Aug 21). In addition, they have excavated the east side back down almost to the footings after weeks of slowly back filling and compacting.



Rebar for the (presumably circular) columns for the first floor of the condo is visible emerging from the transfer slab. It took a couple of weeks just to install the transfer slab rebar. It was an incredible sight.

Last week a large construction trailer was installed along Spadina by office tower site (visible in the image below).



Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 9:26 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.