I usually cycle past the site on my way home from work. For the first time ever there were no workers on site at 5:30 on a Monday (Aug 21). In addition, they have excavated the east side back down almost to the footings after weeks of slowly back filling and compacting.
Rebar for the (presumably circular) columns for the first floor of the condo is visible emerging from the transfer slab. It took a couple of weeks just to install the transfer slab rebar. It was an incredible sight.
Last week a large construction trailer was installed along Spadina by office tower site (visible in the image below).