  #221  
Old Posted Sep 16, 2014, 12:29 AM
vkristof vkristof is offline
Registered User
 
Join Date: Jan 2013
Location: East end of eLIRR
Posts: 232
Quote:
Originally Posted by baseball1992 View Post
How much excavation does this tower need?
If you're talking about 35 HY, the "excavation" is the ongoing drilling of the caissons down into the bedrock. For this tower the caissons are being drilled between the LIRR tracks in the NW corner of the East Rail Yard. The NY NY FB photo below MIGHT show the caisson drill nearest the 11th Ave viaduct drilling one of those caissons.

Looking WSW, column assembly on the south side of 33rd street. The 11th Ave. viaduct ~bisects the photo horizontally. 35 HY will go around where the furthest yellow drill and the train at the covered platform are on photo right. You can see that they temporarily shut down a strip of 3? tracks for the caisson drills, white hydraulic crane and associated equipment. I'm also assuming they will demolish the brown roofed train platform to drill caissons for 35 HY columns and then rebuild platform for train maintenance operations.
9.15.2014?

HY NY FB
Meet the New Heart of New York - Joanie!

Quote:
The men and women building Hudson Yards work hard to keep construction of this city within a city humming along. But from time to time, even these intrepid individuals need help with the heavy lifting. That's where Joanie comes in. Since arriving on site in May, Joanie's put in her share of hours hauling thousands of pounds of steel foundation reinforcements and platform superstructure components. Sounds like a lot, but standing at 220 feet high, with a 600 horsepower engine and a max lifting capacity of 660 tons, this red Manitowoc 18000 crane can handle just about anything her operators throw at her. The strongest crane in New York City, Joanie's already hoisted her way into the hearts of all onsite. And after her mention in the September 4th Fortune article, she is quickly becoming one of the most recognizable and popular Hudson Yards team members! #NHNY
And the diagram below is a reminder of where Related hoped HY would be at the end of 2014 (3.5 months left)

Diagram looking NE

HY NY media distribution from 3.2014

Last edited by vkristof; Sep 16, 2014 at 2:11 PM. Reason: Mark up H NY FB photo to indicate 35 HY overbuild site
     
     
  #222  
Old Posted Sep 16, 2014, 12:47 AM
JayPro JayPro is offline
Registered User
 
Join Date: Apr 2008
Location: South Huntington, Long Island, New York
Posts: 1,047
I suppose I also was lamenting the transition of shape this tower made in its previous incarnation; but it didn't occur to me till now that the former corset building was essentially tweaked to do the same thing...only to four fused oblong cylinders instead of one.
Now I'm really starting to appreciate how even the oft-maligned box is treated here especially given the more radical forms taken by its three neighbors.
     
     
  #223  
Old Posted Sep 16, 2014, 2:15 AM
ILNY ILNY is offline
Registered User
 
Join Date: Jan 2013
Posts: 1,748
Quote:
Originally Posted by vkristof View Post
If you're talking about 35 HY, the "excavation" is the ongoing drilling of the caissons down into the bedrock. For this tower the caissons are being drilled between the LIRR tracks in the NW corner of the East Rail Yard. The NY NY FB photo below MIGHT show the caisson drill nearest the 11th Ave viaduct drilling one of those caissons.
So there will be no excavation, rock blasting or foundation level for this tower ? 35 HY will be constructed on caissons above the rail tracks?
     
     
  #224  
Old Posted Sep 16, 2014, 4:03 AM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 51,747
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
     
     
  #225  
Old Posted Sep 16, 2014, 7:57 AM
SkyscrapersOfNewYork's Avatar
SkyscrapersOfNewYork SkyscrapersOfNewYork is offline
Moderator
 
Join Date: Sep 2009
Location: New York City
Posts: 2,523
Hate to say it but it looks very bland now,in comparison to what could have been ofcourse.
__________________
New York City,The City That Never Sleeps,The Capitol Of The World,The Big Apple,The Empire City,The Melting Pot,The Metropolis,Gotham

Buildings Over 200 Meters 62 Completed 20 Under Construction 50 Proposed 0 On Hold
     
     
  #226  
Old Posted Sep 16, 2014, 12:54 PM
JayPro JayPro is offline
Registered User
 
Join Date: Apr 2008
Location: South Huntington, Long Island, New York
Posts: 1,047
Would that Dame ZH's building were allowed up to at least 56L's height....
     
     
  #227  
Old Posted Sep 16, 2014, 1:28 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 51,747
Quote:
Originally Posted by SkyscrapersOfNewYork View Post
Hate to say it but it looks very bland now
I think its worse than that. A "boring" glass box would have looked better. This version grates on my eyes.



Quote:
Originally Posted by JayPro View Post
Would that Dame ZH's building were allowed up to at least 56L's height....
She'll get her NY skyscraper one day.
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
     
     
  #228  
Old Posted Sep 17, 2014, 12:27 AM
JayPro JayPro is offline
Registered User
 
Join Date: Apr 2008
Location: South Huntington, Long Island, New York
Posts: 1,047
Quote:
Originally Posted by NYguy View Post
I think its worse than that. A "boring" glass box would have looked better. This version grates on my eyes.
Ah, but IMHO, that's just it. To somehow compensate for the dumbing down of any deviation from rectilinearity, we see more sensationalistic "giftwrapping". I give you the latest renders for 50H as an example IMO just as interesting as this one.
     
     
  #229  
Old Posted Sep 17, 2014, 1:27 AM
vkristof vkristof is offline
Registered User
 
Join Date: Jan 2013
Location: East end of eLIRR
Posts: 232
~300 caissons, mostly finished by end of 2014

Quote:
Originally Posted by ILNY View Post
So there will be no excavation, rock blasting or foundation level for this tower ? 35 HY will be constructed on caissons above the rail tracks?
Correct.

The excavation is the drilling of those caissons with the yellow caisson drills (there are at least 3 caisson drills in the East Rail Yard) with the vertical masts. The bottoms of the caissons are socketed into the bedrock, which slopes generally downwards (gets deeper) as you get closer to the Hudson River.

The MTA's Patrick Cashin took a bunch of photos ~2 months ago that shows a drilled, but not filled, caisson at the HY site. When he took the photos they (MTA & Tutor-Perini) had not temporarily closed that sorta central stripe of tracks that is presently closed and being used by 3 caisson drills:

7.9.2014

MTA/Patrick Cashin "Construction at Hudson Yards
Giant cranes and boring machines work in tight quarters with the Long Island Rail Road’s 24/7 operations at the LIRR west side storage yard to construct the platform that will support the office towers, apartments and shopping center of a new neighborhood being constructed by the Related Companies at 10th Avenue between 30th and 33rd streets on Manhattan’s west side. Simultaneously a concrete casing as route protection for Amtrak’s future trans-Hudson tunnel is being constructed. Photo: Metropolitan Transportation Authority / Patrick Cashin"
https://www.flickr.com/photos/mtaphotos/14815015813/

You can scroll at the link above to see photos of the 4 drills, closed tracks, construction barriers, THICK steel columns with studs for concrete, etc.. There has been substantial progress in the caisson drilling and overbuild erection since the photos were taken in early July
     
     
  #230  
Old Posted Sep 17, 2014, 1:51 AM
mistermetAJ mistermetAJ is offline
Registered User
 
Join Date: Oct 2011
Posts: 200
Quote:
Originally Posted by SkyscrapersOfNewYork View Post
Hate to say it but it looks very bland now,in comparison to what could have been ofcourse.
Another addition to the list of New Yorks new disappointing supertalls. I can't believe they butchered the corset building like that as well. Archictectural innovation seems to be only reserved for New York low rises. If it goes high, it's design is value engineered down.

Steinway Tower is the only hope to maintain a great design until the end...
     
     
  #231  
Old Posted Sep 17, 2014, 12:50 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 51,747
Quote:
Originally Posted by JayPro View Post
Ah, but IMHO, that's just it. To somehow compensate for the dumbing down of any deviation from rectilinearity, we see more sensationalistic "giftwrapping". I give you the latest renders for 50H as an example IMO just as interesting as this one.
If by "interesting", you mean horrible, that's just it. Because I put this one in that same class. But again, there have been so many revisions with this tower, who knows what the final product will be. We could likely be looking at further evolution down the line. I only hope it's for the better, because if it's any worse, I rather it didn't get built.
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
     
     
  #232  
Old Posted Sep 17, 2014, 8:37 PM
Surrealplaces's Avatar
Surrealplaces Surrealplaces is offline
Editor
 
Join Date: Feb 2006
Location: Cowtropolis
Posts: 19,968
Very disappointing indeed.

Quote:
Originally Posted by NYguy View Post
I think its worse than that. A "boring" glass box would have looked better. This version grates on my eyes.
     
     
  #233  
Old Posted Sep 23, 2014, 6:28 AM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 51,747
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
     
     
  #234  
Old Posted Sep 23, 2014, 1:37 PM
JayPro JayPro is offline
Registered User
 
Join Date: Apr 2008
Location: South Huntington, Long Island, New York
Posts: 1,047
Courtesy of SSC forumer iamtheSTIG, this alternate form was shown at the TimeWarner display, and as can be seen, includes the current form of the Culture/ex-Corset tower:



The form reverts to a morph, adds a beacon and setback; but the cladding is back to meh.
EDIT: Given a more hi-def look, there's more detail on the skin, albeit less than the version than the one with the tapered corner . Also, the beacon looks to consist of a separate setback of its own...and it looks to be surrounded by a ephemeral Bear-Sterns-like crown.

Last edited by JayPro; Sep 23, 2014 at 4:45 PM.
     
     
  #235  
Old Posted Sep 23, 2014, 4:12 PM
Perklol's Avatar
Perklol Perklol is offline
BANNED
 
Join Date: Apr 2013
Location: Somewhere
Posts: 1,460
^^That needs to get built.

Cool crown also.
     
     
  #236  
Old Posted Nov 27, 2014, 3:49 AM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 51,747
Another slightly different model, with a top similar to 3 Hudson...



Lizzie






Version still on the website...






__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.

Last edited by NYguy; Nov 27, 2014 at 4:05 AM.
     
     
  #237  
Old Posted Dec 8, 2014, 6:06 PM
JayPro JayPro is offline
Registered User
 
Join Date: Apr 2008
Location: South Huntington, Long Island, New York
Posts: 1,047
https://www.facebook.com/HudsonYards...type=1&theater
Apparently, the HY team released today a half-ton, 17' model of the complex; and this is all they've uploaded so far.
Based on juxtaposition, I'd dare say that our friend E-Tower seems to have gone thru yet another, rather haphazard shapeshifting frenzy.....
     
     
  #238  
Old Posted Dec 8, 2014, 6:23 PM
antinimby antinimby is offline
Registered User
 
Join Date: Sep 2006
Location: In syndication
Posts: 2,098
^ The North Tower looks like it was cut in half.
     
     
  #239  
Old Posted Dec 8, 2014, 7:04 PM
JayPro JayPro is offline
Registered User
 
Join Date: Apr 2008
Location: South Huntington, Long Island, New York
Posts: 1,047
^^
Nah..that has to be the South/Coach tower since it lacks the ob deck plate.
It looks as if the Culture tower's hiding something... .
Besides, if you look at pics of the whole complex, the aforementioned stands directly west to Coach.
     
     
  #240  
Old Posted Dec 10, 2014, 1:58 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 51,747
So, we're sticking with this version of the tower for now...who knows what we will end up with...





https://www.facebook.com/HudsonYardsNewYork


Quote:
A lot is happening at the International Council of Shopping Centers Conference at the Javits Center! Not only did the Hudson Yards team unveil a 1,000 pound, 17 ft tall model, but they also introduced a new immersive technology experience developed by Floored. Using the new Oculus DK2 technology -- a first at the conference -- guests can experience a fully customizable, virtual look at the future of New York City shopping and dining at Hudson Yards. You don't want to miss it!



https://twitter.com/HudsonYardsExp/s...895680/photo/1
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.

Last edited by NYguy; Dec 10, 2014 at 2:29 PM.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 1:35 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.