HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations


Reply

 
Thread Tools Display Modes
     
     
  #881  
Old Posted Aug 21, 2012, 9:23 PM
MichaelB MichaelB is offline
Registered User
 
Join Date: May 2006
Location: North edge of Downtown
Posts: 3,208
Quote:
Originally Posted by wwmiv View Post
I do NOT want a Trump Tower coming to Austin. He's vile. There! You've finally seen me go nimby.
LOL! And LOL!
Reply With Quote
     
     
  #882  
Old Posted Aug 22, 2012, 12:39 AM
LoneStarMike's Avatar
LoneStarMike LoneStarMike is offline
Registered User
 
Join Date: Aug 2006
Location: Austin
Posts: 2,264
Quote:
Originally Posted by KevinFromTexas View Post
Also, there's a "Waterloo Park Tower" listed on the city's central emerging projects list. It says it'll be an office and residential tower at the Brick Oven site east of Waterloo Park and south of Brackenridge.

Here is the list.
ftp://ftp.ci.austin.tx.us/DowntownAu..._june_2012.pdf
Here's the permit/case# for that one:

2012-071580 ZC

There's not much, but it mentions

30,432 sq ft Medical office
45,648 sq ft Office
7,608 sq ft Retail
68,472 sq ft Condo (74 du) Does that mean # of units?

Total - 152,120 sq ft

Project Name Waterloo Park Tower
Application Date: July 17, 2012
The applicant is requesting to rezone from CS-1 to CBD
PC Hearing - September 27, 2012
Reply With Quote
     
     
  #883  
Old Posted Aug 22, 2012, 2:03 AM
JoninATX JoninATX is offline
Registered User
 
Join Date: Aug 2009
Location: The ATX
Posts: 3,317
New apartment project joins Burnet Road renaissance



Quote:
By Shonda Novak

Updated: 8:46 p.m. Tuesday, Aug. 21, 2012

Amid the region's apartment building boom, Ardent Residential has broken ground on Burnet Flats, a project that will bring 179 upscale apartments to an evolving stretch of Burnet Road in North Central Austin.

At 5453 Burnet, next to Karavel Shoes, Burnet Flats is Austin-based Ardent's second project along Burnet between 45th Street and RM 2222/Koenig Lane. Ardent also developed a 175-unit mixed-use project two blocks south that it sold to AMLI in December 2010.

Burnet Flats' first units are expected to be ready in late 2013, with the project due to wrap up in the second quarter of 2014. Market rates have not yet been set, said Brett Denton, co-founder and a principal in Ardent along with Art Carpenter. Some units will be leased to qualifying tenants at below-market rents. The project will also have about 3,000 square feet of ground-floor commercial space.

"Like many urban corridors in Austin, Burnet Road is experiencing a transition with the development of new, denser projects to house Austin's growing population while still maintaining the local character of these important roads," Denton said. "A lot is happening in these three or four blocks. It's becoming a destination area."

Several new restaurants or bars are expected to join the lineup, including a Little Woodrow's and Pinthouse Pizza, which will open in the next month or two in a building at 4729 Burnet Road that once housed an appliance store.
http://www.statesman.com/business/re...e-2439568.html
Reply With Quote
     
     
  #884  
Old Posted Aug 22, 2012, 3:04 AM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
Meh
 
Join Date: Jul 2001
Location: Austin <------------> Birmingham?
Posts: 57,325
Quote:
Originally Posted by LoneStarMike View Post
Here's the permit/case# for that one:

2012-071580 ZC

There's not much, but it mentions

30,432 sq ft Medical office
45,648 sq ft Office
7,608 sq ft Retail
68,472 sq ft Condo (74 du) Does that mean # of units?

Total - 152,120 sq ft

Project Name Waterloo Park Tower
Application Date: July 17, 2012
The applicant is requesting to rezone from CS-1 to CBD
PC Hearing - September 27, 2012
That's a small lot, slightly less than a quarter of the size of most downtown blocks by the look of it. I would bet this ends up being close to 10 floors.
__________________
Donate to Donald Trump's campaign today!

Thou shall not indict
Reply With Quote
     
     
  #885  
Old Posted Aug 23, 2012, 6:33 PM
priller's Avatar
priller priller is offline
Registered User
 
Join Date: Apr 2007
Posts: 1,979
Walked by last the Marriott site last night. They've started digging up the parking lot.



Reply With Quote
     
     
  #886  
Old Posted Aug 23, 2012, 6:52 PM
MichaelB MichaelB is offline
Registered User
 
Join Date: May 2006
Location: North edge of Downtown
Posts: 3,208
thanks Priller. I had a flash back to when they finally started on Frost!
Reply With Quote
     
     
  #887  
Old Posted Aug 23, 2012, 7:48 PM
Jdawgboy's Avatar
Jdawgboy Jdawgboy is offline
Representing the ATX!!!
 
Join Date: Jan 2003
Location: Austin
Posts: 5,735
Looking at the Hyatt Place I see why they had to leave a blank wall there. It bumps right up to the property line and more likely than not there will be a future building where the u ship office is. There is no ally there so the builings would merge. Id like to see a tall highrise on that lot.
__________________
"GOOD TIMES!!!" Jerri Blank (Strangers With Candy)
Reply With Quote
     
     
  #888  
Old Posted Aug 25, 2012, 6:20 AM
Mopacs's Avatar
Mopacs Mopacs is offline
Austinite
 
Join Date: Jul 2002
Location: Austin.TX.USA
Posts: 4,584
Found this new rendering of the IBC Bank Plaza tower on Endeavor's website:



http://www.endeavor-re.com/property/...retail/photos/
__________________
Austin.Texas.USA
Home of the 2005 National Champion Texas Longhorns
Reply With Quote
     
     
  #889  
Old Posted Aug 25, 2012, 7:41 AM
migol24 migol24 is offline
Registered User
 
Join Date: Sep 2008
Location: San Francisco, Austin
Posts: 1,603
Quote:
Originally Posted by Mopacs View Post
Found this new rendering of the IBC Bank Plaza tower on Endeavor's website:



http://www.endeavor-re.com/property/...retail/photos/
Well, I will admit that it looks better than the last rendering.
Reply With Quote
     
     
  #890  
Old Posted Aug 25, 2012, 7:48 AM
nixcity's Avatar
nixcity nixcity is offline
Registered User
 
Join Date: Jul 2006
Location: Austin, TX.
Posts: 768
It has a base that makes you think its going to be 600 feet but no.....
Reply With Quote
     
     
  #891  
Old Posted Aug 25, 2012, 3:38 PM
ahealy's Avatar
ahealy ahealy is offline
Registered User
 
Join Date: Jul 2008
Location: San Antonio / Austin
Posts: 2,564
Quote:
Originally Posted by Mopacs View Post
Found this new rendering of the IBC Bank Plaza tower on Endeavor's website:



http://www.endeavor-re.com/property/...retail/photos/
dead zone
Reply With Quote
     
     
  #892  
Old Posted Aug 25, 2012, 3:55 PM
photoLith's Avatar
photoLith photoLith is offline
Ex Houstonian
 
Join Date: Feb 2008
Location: Pittsburgh n’ at
Posts: 15,491
Quote:
Originally Posted by priller View Post
Walked by last the Marriott site last night. They've started digging up the parking lot.



Wait, what is this? Any renders?
__________________
There’s no greater abomination to mankind and nature than Ryan Home developments.
Reply With Quote
     
     
  #893  
Old Posted Aug 25, 2012, 5:59 PM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
Meh
 
Join Date: Jul 2001
Location: Austin <------------> Birmingham?
Posts: 57,325
Quote:
Originally Posted by nixcity View Post
It has a base that makes you think its going to be 600 feet but no.....
I was thinking the same thing. It looks very similar to The Austonian base.

Quote:
Originally Posted by ahealy
dead zone
Yeah, this really needs some retail. I hope whatever gets built at the post office site across the street is wrapped with retail on all sides. I really don't mind the design. It's too bad it couldn't be taller, but the design isn't bad. I do like the contrast between what I guess is limestone and the almost smokey glass.

Quote:
Originally Posted by photoLith View Post
Wait, what is this? Any renders?
This is the construction site for the JW Marriott Convention Hotel. It'll be 408 feet tall with 34 floors and will have 1012 rooms. It'll be the largest JW Marriott in the world and the largest hotel in Austin. It officially broke ground this week.

Models here:
http://i20.photobucket.com/albums/b2...63712547_n.jpg
http://i20.photobucket.com/albums/b2...36505824_n.jpg

Building development thread here:
http://forum.skyscraperpage.com/showthread.php?t=192074
__________________
Donate to Donald Trump's campaign today!

Thou shall not indict
Reply With Quote
     
     
  #894  
Old Posted Aug 25, 2012, 9:57 PM
priller's Avatar
priller priller is offline
Registered User
 
Join Date: Apr 2007
Posts: 1,979
Made a quickie model of the hotel in SketchUp and took a few views of it in Google Earth. Unfortunately, I don't think it will have much of an impact on the overall skyline, being nestled among various other building. Still, a major addition to downtown.

Again, many thanks to Kevin for all the links to building info, especially the COA case number. Wealth of information there!


From the Chase Bank garage:




From S. First bridge:




From the Hilton pool deck (I'm sure I'll be taking many pics from here):




From Cesar Chavez and I-35:

Reply With Quote
     
     
  #895  
Old Posted Aug 25, 2012, 10:50 PM
BevoLJ's Avatar
BevoLJ BevoLJ is offline
~Hook'em~
 
Join Date: Oct 2010
Location: Austin, TX/London, UK
Posts: 1,814
Wow! They just started and I want it to be finished already! That area of 2nd and Congress are going to be awesome!

Between that JW Hotel and if something good goes in on that T. Stacy site at 6th and Congress that hopefully will include some street retail it will really tie 6th + 5th and Congress and 2nd streets together.

Second Street for 2015 SXSW will be crazy!
__________________
Austin, Texas
London, United Kingdom
Reply With Quote
     
     
  #896  
Old Posted Aug 26, 2012, 9:31 PM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
Meh
 
Join Date: Jul 2001
Location: Austin <------------> Birmingham?
Posts: 57,325
These photos are from August 18th, 22nd and 24th. They're all from I-35.











2400 Nueces.


Views from I-35 near Parmer Lane. You can see the IBM buildings up on North Mopac to the right, and to the left are some of the Arboretum midrises. That building in the middle behind the pole is at Mopac and Braker.


IBM buildings on North Mopac and some of the Domain buildings.


National Instruments HQ on North Mopac.


RiverView Apartments.




I call this one "Does anyone have a hack saw?" I really hate that pole!




2400 Nueces again. It's at the 11th floor now. Just 5 more to go.


UT lowrises and midrises.








__________________
Donate to Donald Trump's campaign today!

Thou shall not indict
Reply With Quote
     
     
  #897  
Old Posted Aug 28, 2012, 1:59 AM
Syndic's Avatar
Syndic Syndic is offline
Registered User
 
Join Date: Jun 2010
Location: Austin, TX
Posts: 1,945
Great pics. These projects may not be overly exciting, but they're good infill. Can't wait for the next round of projects to kick off.

Really love the Riverview Apartments. They really contribute to the impression that our city is not just one small downtown.
Reply With Quote
     
     
  #898  
Old Posted Aug 28, 2012, 5:34 AM
zx14 zx14 is offline
Registered User
 
Join Date: Dec 2007
Posts: 279
Not trying to be off topic but if the Austonian were to add a 350 foot tall spire. That would make it the tallest in Texas. There are a few buildings in this country that are not much taller that use an over sized flag pole to achieve that height. Why not complain about spire height. Just join in on the fun.
Reply With Quote
     
     
  #899  
Old Posted Aug 28, 2012, 5:43 AM
BevoLJ's Avatar
BevoLJ BevoLJ is offline
~Hook'em~
 
Join Date: Oct 2010
Location: Austin, TX/London, UK
Posts: 1,814
Thank you for those Kevin. I avoid I-35 at all cost. I think I have been on parts north of Ben White only like 5-6 times in the last decade. lol. It has some great views and is good to get to see how those views are coming along with out having to suffer the traffic.
__________________
Austin, Texas
London, United Kingdom
Reply With Quote
     
     
  #900  
Old Posted Aug 28, 2012, 4:13 PM
AusTxDevelopment AusTxDevelopment is offline
Registered User
 
Join Date: Jun 2012
Posts: 808
Apple To Begin Construction In September

Construction to start in September on Apple Inc.’s operations center

Community Impact News
by Amy Denney
August 24, 2012


Technology company Apple Inc. has finalized a contract with Dallas-based Cadence McShane Construction Co. to construct the first phase of the planned Americas Operations Center in Northwest Austin, and construction is expected to start in September, said Srinath Kasturi, vice president at Cadence McShane, which has offices in Austin, Dallas and Houston.



Apple, headquartered in Cupertino, Calif., purchased nearly 39 acres of land at Parmer Lane and Delcour Drive in June with plans to invest $304 million into the operations center and hire more than 3,600 employees by Dec. 31, 2021.

The City of Austin approved an $8.6 million economic incentive agreement for Apple’s investment in Austin, and Apple could receive between $5.4 million and $6.4 million in incentives from Travis County depending on whether the company fulfills certain agreed-upon requirements.

Apple is also slated to receive $21 million from the state’s Texas Enterprise Fund. That amount is the seventh-highest awarded to a company since the fund’s inception in 2003, according to the Economic Development and Tourism Division of the Governor’s Office.

Texas Instruments received $50 million—one of the largest amounts—between 2004 and 2007 for its $3 billion investment.

Apple’s new facility will be part of the Riata Vista Office Complex, which is being developed by McShane Development Co., a sister company of Cadence McShane. City staff approved initial site plans for the project in 2007, and on May 24, Austin City Council approved extension of the site to Dec. 31, 2021, to allow enough time for the project to be completed.

According to site plans filed in April with the City of Austin, the complex will include five office buildings with a total of 649,028 square feet of space, two retail buildings with a total of 34,794 square feet and one 5,250-square-foot restaurant.

Although Apple has not yet confirmed that it will be building a new campus, the documents said, “... the primary tenant to utilize these future professional office buildings is Apple Inc.”

Lynda Courtney, development services process coordinator for the city, said the documents do not indicate how much of the office buildings Apple will occupy. She said the revised site plans have increased the buildings by one floor to a total of four floors and added parking to meet Apple’s needs.

Courtney said Phase 1 would include construction of the parking lot, a detention pond and the drainage system. Phase 1A and 1B would be Apple’s two office buildings. The second phase would include construction of the remaining office, retail and restaurant buildings on the west side of the property.

Cadence McShane will hire subcontractors to construct Phase 1. Kasturi declined to provide more details about the project because of a confidentiality agreement.

http://impactnews.com/articles/const...rations-center
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 8:45 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.