HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations


Reply

 
Thread Tools Display Modes
     
     
  #2361  
Old Posted Dec 12, 2020, 10:54 AM
mousquet's Avatar
mousquet mousquet is offline
that prick
 
Join Date: Jan 2011
Location: Nimbyland Paris, Museum France
Posts: 3,804
Quote:
Originally Posted by IWant2BeInSTL View Post
Sorry but I had to.
You should've refrained. That was gross.
__________________
Les extrémistes de tout bord, politique ou religieux sont dépourvus de surmoi. Tels des psychopathes et des bigots abrutis, ils vivent dans la défiance et l'endoctrinement systématiques et malveillants, à l'étroit dans leurs petites têtes trop faciles à remplir. Ils ne savent que se regarder le nombril et dire - et moi ?! et moi ?! et moi?!
Ils sont tout ce qu'il y a de plus médiocre et nuisible...
Reply With Quote
     
     
  #2362  
Old Posted Dec 14, 2020, 3:00 AM
IWant2BeInSTL IWant2BeInSTL is offline
Registered User
 
Join Date: Aug 2008
Location: STL ---> NY ---> STL ---> VA ---> CO ---> STL
Posts: 1,086
^

Central West End AC Hotel Progress Update











4545 Laclede tower crane is up as well













All photos by chriss752 at urbanstl.com: https://urbanstl.com/4545-laclede-t11737-s100.html
Reply With Quote
     
     
  #2363  
Old Posted Dec 14, 2020, 3:56 AM
IWant2BeInSTL IWant2BeInSTL is offline
Registered User
 
Join Date: Aug 2008
Location: STL ---> NY ---> STL ---> VA ---> CO ---> STL
Posts: 1,086
Another shot of the horrible Jeanne Gang abortion (according to some) that is 100 Above the Park:



photo by chriss752 at urbanstl.com: link
Reply With Quote
     
     
  #2364  
Old Posted Dec 15, 2020, 2:48 AM
Chris Stritzel's Avatar
Chris Stritzel Chris Stritzel is offline
Registered User
 
Join Date: Nov 2015
Location: St. Louis
Posts: 249
The Verve 3765 Lindell continues to rise.

Project update photos from today (taken by me). This project should be completed by August 2021.



__________________
"Here's to the crazy ones..." - Steve Jobs
Reply With Quote
     
     
  #2365  
Old Posted Dec 15, 2020, 2:51 AM
Chris Stritzel's Avatar
Chris Stritzel Chris Stritzel is offline
Registered User
 
Join Date: Nov 2015
Location: St. Louis
Posts: 249
The Beaumont Telephone Exchange Building Redevelopment into Apartments the the Midtown Sporting Club (both are part of the JCMidtown development) are coming along nicely.

These buildings were all previously dilapidated. Future phases will include the renovation of two more buildings, an office building, box yard, parking garage, and maybe a residential or hotel mid-rise.






__________________
"Here's to the crazy ones..." - Steve Jobs
Reply With Quote
     
     
  #2366  
Old Posted Dec 15, 2020, 2:56 AM
Chris Stritzel's Avatar
Chris Stritzel Chris Stritzel is offline
Registered User
 
Join Date: Nov 2015
Location: St. Louis
Posts: 249
On Olive: New Renderings and Progress Update.

The "On Olive" housing development in Grand Center is coming along nicely. Numerous homes are under construction or will begin construction soon. The homes are designed by multiple architects, with the most renowned being Tatiana Bilbao of Mexico City. Attached are progress update photos from today as well as new renderings, which come from the "On Olive" project website. FYI: these are the first new homes in the Grand Center neighborhood in decades.

On Olive is located between Vandeventer and Spring in the Grand Center neighborhood. The project replaces numerous vacant lots and vacant buildings while redeveloping the Wolfner Building.








New renderings...







__________________
"Here's to the crazy ones..." - Steve Jobs
Reply With Quote
     
     
  #2367  
Old Posted Dec 16, 2020, 7:36 AM
Chris Stritzel's Avatar
Chris Stritzel Chris Stritzel is offline
Registered User
 
Join Date: Nov 2015
Location: St. Louis
Posts: 249
City Foundry Phase 2

Additional rendering of Phase 2 (view from within the development) and a description by the architect, Todd Halamka + Partners.
Quote:
City Foundry Phase 2 is a new 368,000-square-foot, mixed-use residential development in Saint Louis, Missouri. The development includes 282 dwelling units atop a multi-level parking garage, with ground floor commercial retail. Continuing a westward expansion of the newly completed City Foundry Phase 1 development, the new residential building design envisions elegant, compact dwelling units in studio, 1 bedroom and 3 bedroom layouts permitting work/live opportunities on premise, coupled with extraordinary amenity facilities including two outdoor garden terraces at level 8 complete with extensive flowers, trees, swimming and leisure settings. Additional level 13 rooftop indoor/outdoor amenity spaces are included with vistas extending across the entire City Foundry site below and the downtown city of Saint Louis, Mississippi River and Gateway Arch beyond.

As project owner and developer, the Lawrence Group anticipates a fall 2021 commencement of construction. The building will seek Well Building certification and incorporates both natural and mechanical ventilation strategies to optimize systems efficiencies and maintain low energy consumption. The building design also explores modular unit planning with repetitive interior and exterior components, fostering construction schedule and materials cost savings.


The rendering below is of "Fassler Hall". It will open in the main Foundry Building next year. This rendering was found embedded on their website.
__________________
"Here's to the crazy ones..." - Steve Jobs
Reply With Quote
     
     
  #2368  
Old Posted Dec 30, 2020, 7:29 PM
IWant2BeInSTL IWant2BeInSTL is offline
Registered User
 
Join Date: Aug 2008
Location: STL ---> NY ---> STL ---> VA ---> CO ---> STL
Posts: 1,086
Recent drone photos of 4545 Laclede construction

All photos by chriss752 at urbanstl.com: link









Reply With Quote
     
     
  #2369  
Old Posted Dec 31, 2020, 2:12 AM
IWant2BeInSTL IWant2BeInSTL is offline
Registered User
 
Join Date: Aug 2008
Location: STL ---> NY ---> STL ---> VA ---> CO ---> STL
Posts: 1,086
New rendering and website for the Hutton on Madison in Kirkwood:

https://www.thehuttonresidences.com/



Below is a shot of the recently completed Barclay Condos next door by the same developer (Savoy Properties):



Photo by chriss752 at urbanstl.com: link
Reply With Quote
     
     
  #2370  
Old Posted Dec 31, 2020, 7:52 PM
IWant2BeInSTL IWant2BeInSTL is offline
Registered User
 
Join Date: Aug 2008
Location: STL ---> NY ---> STL ---> VA ---> CO ---> STL
Posts: 1,086
These are a couple weeks old but show the environs surrounding the 2 new TOD developments going up next to the Skinker-DeBaliviere Metrolink station:The Expo and The Hudson

All photos by chriss752 at urbanstl.com: https://urbanstl.com/expo-at-forest-...7535-s375.html











Reply With Quote
     
     
  #2371  
Old Posted Dec 31, 2020, 9:28 PM
IWant2BeInSTL IWant2BeInSTL is offline
Registered User
 
Join Date: Aug 2008
Location: STL ---> NY ---> STL ---> VA ---> CO ---> STL
Posts: 1,086
A better rendering of the 1014 Spruce developement—146 apartments + 3000 sq ft of commercial space downtown near Busch Stadium

Materials are brick, metal, glass, and stone.


image source
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 1:05 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2021, vBulletin Solutions, Inc.