HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction


Reply

 
Thread Tools Display Modes
     
     
  #1  
Old Posted Jul 17, 2019, 10:08 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
MINNEAPOLIS | North Loop Green | 425 & 239 FT | 37 & 17 FLOORS

Brand-new proposal from Hines called North Loop Green in the Star Tribune today: http://www.startribune.com/hines-pit...wer/512835772/

36-floor apartment building and 14-floor office building connected by retail at the base. Site is a parking lot in a former rail yard directly across 5th St from Target Field and immediately adjacent to Target Field Station, which is where both of Minneapolis' light rail lines meet its single commuter rail line. Only the one rendering and fairly brief descriptions at this point. Hopefully more to come soon!

Reply With Quote
     
     
  #2  
Old Posted Jul 18, 2019, 12:48 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Here's a second rendering found hidden on the ESG website by SSC user Avian.

I count at least 39 floors on the residential tower...

Reply With Quote
     
     
  #3  
Old Posted Jul 23, 2019, 5:49 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Plans published for Planning Commission Committee of the Whole this week: http://www.ci.minneapolis.mn.us/www/...msp-219900.pdf .

Previous floor count published in the Star Tribune based on floors above the 5th Street bridge. Actual height above grade is proposed at 39 floors and 442' for the residential tower and 17 floors and 236' for the office tower.

Looks like 450 apartments, 90 of which are earmarked for short-term rentals, 339,000 sqft of office space, 20,000 sqft of retail space, 590 enclosed parking stalls (2 levels below grade, 3 levels between grade and bridge level), plus significant public outdoor space.



























Reply With Quote
     
     
  #4  
Old Posted Jul 23, 2019, 6:40 PM
JMKeynes JMKeynes is offline
BANNED
 
Join Date: Aug 2017
Location: SW3
Posts: 4,216
Good news for the Mini-Apple!
Reply With Quote
     
     
  #5  
Old Posted Jul 23, 2019, 6:49 PM
Steely Dan's Avatar
Steely Dan Steely Dan is online now
devout Pizzatarian
 
Join Date: Jul 2001
Location: Lincoln Square, Chicago
Posts: 29,782
this one is gonna look great from inside the ballpark.

very nice looking project.
__________________
"Missing middle" housing can be a great middle ground for many middle class families.
Reply With Quote
     
     
  #6  
Old Posted Aug 25, 2019, 3:51 PM
kenratboy kenratboy is offline
Registered User
 
Join Date: Nov 2003
Location: Salt Lake City, UT
Posts: 1,096
Woohoo, lets hope it doesn't end up chopped down to 250 feet
Reply With Quote
     
     
  #7  
Old Posted Sep 21, 2019, 12:14 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Updated plans here: http://www.ci.minneapolis.mn.us/www/...msp-220829.pdf .

Variety of changes, including new facade treatment on residential tower, lower height. Now 37 floors/425' and 17 floors/239'.



















Reply With Quote
     
     
  #8  
Old Posted Sep 22, 2019, 5:53 AM
MN/WI MN/WI is offline
Registered User
 
Join Date: Jun 2014
Posts: 436
This is going to be a game changer for the skyline. Something this tall north of 1st Ave, for that matter north of Hennepin. I like the new rust look. I'd like to see them add some aged copper as well.
Reply With Quote
     
     
  #9  
Old Posted Dec 11, 2019, 4:58 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Updated plans headed to the HPC next week: http://www.minneapolismn.gov/www/gro...msp-221992.pdf .

They don't provide the height above grade exactly, as they are measuring everything off of the 5th St bridge level, but it looks like ~425', 37 floors for the residential tower and ~239', 17 floor for the office tower.

From the plans:























Reply With Quote
     
     
  #10  
Old Posted Aug 19, 2020, 2:41 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
8/18.

I wouldn't read too much into this. Based on nearby utility markings this looks like it's being staged for some utility work on the Cedar Lake Trail. Could be utility relocation ahead of the project though? No signs by the pay box regarding impending lot closure, I checked.



Reply With Quote
     
     
  #11  
Old Posted Aug 19, 2020, 5:00 AM
TallBob TallBob is offline
Registered User
 
Join Date: Sep 2011
Posts: 3,135
^^Ya....There hasn't been much info on this one! I just hope it's not going to get a re-design which could lead to a height reduction. I always thought that combining the office into the residential portion and just had one taller tower....but I suppose a 650 footer that close to Target Field would be too much to ask for!
Reply With Quote
     
     
  #12  
Old Posted Aug 23, 2020, 4:53 PM
kenratboy kenratboy is offline
Registered User
 
Join Date: Nov 2003
Location: Salt Lake City, UT
Posts: 1,096
Figure, they will keep the parking lot open until the very last moment. You can literally close it overnight. No reason to close it if people can still pay to park!

Of course the big question now will be the office tower...they going to reconsider that (to be direct, related to concerns about the demand and value of office space even after a vaccine is available - the long-term trends).
Reply With Quote
     
     
  #13  
Old Posted Aug 24, 2020, 10:26 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
SSC user ArcCrypts has discovered obstruction cases with the FAA for this site. Effective date listed 10/19/20. Listed heights are 418' for the building and 617' for the crane.

https://oeaaa.faa.gov/oeaaa/external...seID=446162627

https://oeaaa.faa.gov/oeaaa/external...seID=446171535
Reply With Quote
     
     
  #14  
Old Posted Aug 25, 2020, 7:09 AM
TallBob TallBob is offline
Registered User
 
Join Date: Sep 2011
Posts: 3,135
I always thought and was stated over at SSC that this building was listed at 425'!
Reply With Quote
     
     
  #15  
Old Posted Nov 13, 2021, 5:41 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
I haven't had the opportunity to go past the site to get my own photos yet, but this one broke ground last week!
Reply With Quote
     
     
  #16  
Old Posted Nov 13, 2021, 7:19 PM
Steely Dan's Avatar
Steely Dan Steely Dan is online now
devout Pizzatarian
 
Join Date: Jul 2001
Location: Lincoln Square, Chicago
Posts: 29,782
^ cool!

With eleven and gateway wrapping up, it's great to see another big tower getting underway in Minneapolis.
__________________
"Missing middle" housing can be a great middle ground for many middle class families.
Reply With Quote
     
     
  #17  
Old Posted Nov 14, 2021, 12:05 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Totally! And seeing this level of commitment post-covid and unrest feels really reassuring.

Somewhat like Eleven, this one is going to change the skyline pretty significantly from some angles due to how far out of the main office core it is. I think the experience on the ground is going to be interesting too, with the new greenspace under the 3rd/4th St viaducts, and stitching the North Loop and Warehouse District together along the 5th St bridge. Pretty unique site with the grade change and bridges.
Reply With Quote
     
     
  #18  
Old Posted Nov 20, 2021, 1:04 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Yesterday.



Reply With Quote
     
     
  #19  
Old Posted Nov 27, 2021, 7:55 AM
TallBob TallBob is offline
Registered User
 
Join Date: Sep 2011
Posts: 3,135
I think I'm the only one that still thinks they should set the Residences above the office portion. It'd probably put the structure at around 500-550'. Wishfull thinking!
Reply With Quote
     
     
  #20  
Old Posted Dec 4, 2021, 10:13 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 678
Today:



Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction
Forum Jump



Forum Jump


All times are GMT. The time now is 11:25 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.