Quote:
Originally Posted by RocketSurgeon
That yellow vapor barrier installation is interesting. Some of those panels went up months ago, yet they haven't finished them on a single floor yet. I wonder what the story behind that is?
|
Looking back at the renderings it appears where they haven't installed the yellow product, there will eventually be storefront window walls made entirely of glass/steel and not solid wall surface. The Yellow product is only on the portions of each floor where they are constructing traditional steel frame stud walls with insulation and inset windows. The sequencing of the work likely relates to having each of those scopes performed by different subcontractors and when the storefront window sub begins you'll see that go up quickly.
But obviously on an active job it could be anything. That's just my guess.
Edit - they do seem fairly far behind in installing the yellow product. They have the exterior stud walls 8 floors ahead of the exterior wallboard. That could be a supply issue. In other words multiple factors likely in play for what you're seeing.