Quote:
Originally Posted by AJM
[Images redacted]
Truss was picked from street with the TG1900 on left and landed on the 26th floor, it was then tripped and installed with the Potain.
|
The intricacy of this part of the construction is very interesting. The lower portion will look relatively far along when this thing starts to go vertical again. I didn't pay close attention to the schematics that I've seen, but I wonder if something similar will happen with CITC's upper (hotel) floors.