Quote:
Originally Posted by PHL10
Compared to Arthaus, this one is still slow going.
|
Was going slow, due to the cantilever. The first floor went up at the end of June and the cantilever was poured by the end of September with the residential floors going up pretty fast since then, with four stories above the cantilever floor