Quote:
Originally Posted by bomberjet
Yes of course. Just like the Perimter/#1 interchange has the bridges over the tracks. But it requires grade seps which cost millions. Add that up over the 4 interchanges I mentioned and it increases cost significantly.
How would you fit a diamond interchange at Deacon with the railway right there. You can't really. Having no railway there is much easier.
|
Watch me. I’ve intended to draw and showcase my version of the two interchanges across the floodway.
Also my thinking is this: If you grade-separate the cross road from the highway, you may as well include the rail track in the package.