Oakridge Park | 13 Towers | 154m | 52fl | 5M sqft | U/C


i mean, the more pipe in the ground, the more fittings, the more potential for leaks. the key is to use quality products and good installation. its a pressurised system, basically the same idea as the potable water system. it shouldnt be anymore or any-less reliable than the potable system. but now youre talking about a developer that cuts corners and cuts costs.

now i LOVE the idea of a grey water system. i think we should be looking into doing that here, personally; water scarcity will only get worse over time through population growth and global warming. i also do quite like infrastructure in general, so i find it fascinating from that aspect. BUT i would NOT want to be in a strata, on the hooks for the costs of 2 pressurized pipe systems built by a developer getting all their parts in china, and cutting corners on the labour... see what happened with Vancouver House.

Yeah, I was just thinking of the duplication and the various recent instances of leaks - Vancouver House, Charleson, etc.
It makes sense from an environmental perspective, just a question of the headaches and costs that could result.
 
Yeah, I was just thinking of the duplication and the various recent instances of leaks - Vancouver House, Charleson, etc.
It makes sense from an environmental perspective, just a question of the headaches and costs that could result.

Olympic village I believe they abandoned the gray water system. I think the Convention center is the only system that still works and has been fairly trouble free. Running gray water systems are $$ to the strata as to be done properly they need to treat the the water somehow. Otherwise you end up with growth etc. We have a water supply issue here for 3 maybe 4 months.. Is it worth the cost to build cisterns and pump that water to green roof when we are telling people to not water. More flaws of a head in sand metro Vancouver board
 
Olympic village I believe they abandoned the gray water system. I think the Convention center is the only system that still works and has been fairly trouble free. Running gray water systems are $$ to the strata as to be done properly they need to treat the the water somehow. Otherwise you end up with growth etc. We have a water supply issue here for 3 maybe 4 months.. Is it worth the cost to build cisterns and pump that water to green roof when we are telling people to not water. More flaws of a head in sand metro Vancouver board

Our strata building has a cistern based system for some of our irrigation and our water feature. I wouldn't say it has been "trouble free" but it hasn't caused any major issues.

OTOH our city bills for sewer and water are massive. I don't know how it breaks down but this could be saving us money overall, hard to say.
 
Olympic village I believe they abandoned the gray water system.

Interesting. I think a friend who lived there said he had to use biodegradable detergents, etc. because the gray water was being used to water plants. I guess that became too troublesome to regulate.


OTOH our city bills for sewer and water are massive. I don't know how it breaks down but this could be saving us money overall, hard to say.

I remember that my strata had massive water bills during Covid because everyone was staying at home!
 
52699832273_facfa85915_b.jpg


52699753760_7c86cf6fcd_b.jpg


52699753585_20fdef5084_b.jpg


52699832073_25fde7a292_b.jpg


52699601059_80548c3d39_b.jpg


52698819352_16a6530273_b.jpg


52699754215_970528e10d_b.jpg


52699603299_3d9fe678d4_b.jpg


52699603154_257ea06a3f_b.jpg
 
Fantastic updates, thank you! It’s actually taking shape now.

Can anyone give an official simple rundown of which towers are currently U/C and their current planned heights?
 
Fantastic updates, thank you! It’s actually taking shape now.

Can anyone give an official simple rundown of which towers are currently U/C and their current planned heights?

Buildings 1-4, 6, & 7 are under construction. Possibly also 8 and 12 though they haven't extended past the podium yet.

Building 1: 5fl, 25m
2: 22fl, 70m
3: 36fl, 110m
4: 45fl, 138m
NE Office: 10fl, 33m
5: 52fl, 154m
6: 34fl, 115m
7: 23fl, 84m
8: 34fl, 111m
9: 12fl, 43m
10: 12fl, 43m
11: 14fl, 45m
12: 35fl, 113m
13: 24fl, 87m
14: 40fl, 129m

oakridge-centre-october-2020-design-9.jpg

Image from Henriquez Partners/Quadreal
 
Last edited:


A screenshot taken from the UDP review of the Transit Plaza last year. Based on this, development applications still need to be filed for Buildings 5, 9, 10, 11, 13, and 14.
 
Yep, and from my understanding they are in flux too, some growing some shrinking. Will be interesting to see if the City allows much more density or if it comes in similar to what we've already seen.
 
I just noticed these "Site Plans" (Leasing Plans) at the Oakridge website.

Video Walk-Throughs:
https://leasing.oakridgepark.com/videos/

8HPN9NR.png


Food Store (Safeway) is really awkwardly shaped with a mezzanine; adjacent liquor store.
Is there a pedestrian streetfront entrance to the Safeway from Cambie (or is access only from parkade and mall)?

Connection from Canada Line is through a "Lower Galleria".

Hudson's Bay is the only department store. I don't see pedestrian entrances to Hudson's Bay from 41st Ave.
There's a 32,000 sq ft space at the south end of the mall on Level 1.
There's a 44,000 sq ft space at the west side of Level 2 marked "office".
14,000 sq ft and 23,000 sq ft units on 2nd floor of south side podiums.

P3
level-p3.gif

https://leasing.oakridgepark.com/buildings/leasing/

P2
level-p2.gif

https://leasing.oakridgepark.com/buildings/leasing/

P1
level-p1.gif

https://leasing.oakridgepark.com/buildings/leasing/

Level 1
level-1.gif

https://leasing.oakridgepark.com/buildings/leasing/

Level 2
level-2.gif

https://leasing.oakridgepark.com/buildings/leasing/
 
Last edited:


Back
Top