I wasn't able to attend this meeting, but I don't think there has been anything posted about this rezoning before.
https://vancouver.ca/docs/council/vher20221024ag.pdf
Yaletown Park towers are being repainted.
(They are just painted concrete).
On the right side of the pic, they've applied a base light beige coat, below the windows, then they applied a gray sealant coat ofor the ledges, then I suppose they'll go back and painta final coat or two.
Hoepfully they'll retain the 3-shade colour blocking across the tower facade, but knowing stratas these days, they may just opt for one colour.
There was a wide-ranging discussion of the exterior project and why the resolution to raise money for its remediation failed at the Annual General Meeting, including the project is more than just repainting: it involves waterproofing the eyebrows above the windows and resurfacing the balconies.
Council briefly reviewed a previous proposal from Remdal to do the exterior coating and membrane work. The proposal was for discussion purposes only. Council will await the final draft of the RDH Engineering report.
Might be connected to some repair work
https://s3.amazonaws.com/mrp-listin...bc3d7bbf1bfd.pdf#view=FitH&zoom=100&toolbar=0
The gray parts on the ledges are probably the "eyebrows" mentioned in your post and the coating looks like sealant.
I wouldn't be surprised about a resolution failing at the AGM, as that complex was heavily marketed to investors.
Those towers are mostly one bedroom units.
Yeah they couldn't pass a motion to fix their water system that was creating pinhole leaks in their piping![]()
man oh man, strata sucks. but a better question is... how old is the place, and why are there holes in the pipes?:sly::???:
https://donurquhart.com/blog/older-condos-in-vancouver-and-their-plumbing-what-to-look-out-for/Was the building re-plumbed between 2000 and 2006?
Between these years a type of copper plumbing was manufactured out of China that was faulty. If the building is experiencing frequent pin hole leaks in the hot water copper pipes within a few years of being re-plumbed it is most likely that it may have been re-plumbed with the faulty Chinese copper plumbing. One of the manufacturers in China responsible for the poor copper pipes was Hung Tai manufacturing.
Faulty copper pipe from China in the early 2000s.
The website also says that buildings need to be replumbed every 20-25 years. Hmmm.
Yaletown Park, by Wall Financial Corp. Two towers completed 2006, one in 2007.
Larger buildings move large volumes of soft water continuously through their copper pipes. This “hungry water” if left untreated, seeks minerals from piping, and speeds the corrosion process. The higher volume of soft water is why B.C. condo owners and other large buildings see premature plumbing failure, while pipes in single-family homes last much longer.
Vancouver’s soft water is high in oxygen and carbon dioxide. It readily absorbs copper, lead, and other minerals from plumbing. We bring the water back to a optimal pH, at 8.0, which allows the protective layer from Hytec’s Aquasoft to work more quickly.
Yaletown Park, by Wall Financial Corp. Two towers completed 2006, one in 2007.
Weird...
A large crowd of partiers walked across from the VAG North Plaza (where there was a DJ spinning tunes) across Howe St. (stopping traffic) into the Howe Street tunnel.
Pic by me tonight:
![]()
I rememenbr looking at one of those with a friend who was looking for a downtown condo. It had the weirdest bathroom set-up kind of a jack and jill set-up where the bathtub shower separated two bathrooms.
Does anybody have news about the Cohen Block site in East Van? Supposed to be a big development for the area:
https://www.urbanyvr.com/the-cohen-block-rentals/