swimmer_spe
New member
We just need more people. It's not out of reach it's just we're not there yet.
Explain Rigaud then.
We just need more people. It's not out of reach it's just we're not there yet.
Explain Rigaud then.
Explain Rigaud then.
We just need more people. It's not out of reach it's just we're not there yet.
Call it like it is: we are simply a car-reliant, backward country when it comes to public transportation.
The station that closed due to lack of passengers...? You might want another example. :runaway:
Say no more.
Switzerland is highly mountainous and has 8 mil inhabitants, with towns and villages spread out all over the country and regions. We have about 2.5 mil here in the Lower Mainland. At a third of Switzerland's population, we should be able to have at least one complete train line into the valley right?
Look at Switzerland's rail network here:
http://midas400.blogspot.com/2014/11/getting-around-on-swiss-travel-system.html
Call it like it is: we are simply a car-reliant, backward country when it comes to public transportation.
I think we all agree on that, so it's not as simple as "just build something different".
Yet Coquitlam deserves Skytrain and WCE.....
Population of 148,625
And Niagara Region does not get anything else except for a GO train.... at almost 3 times the population.
Switzerland has the advantage of being located between several major countries and being barely larger than the entire Lower Mainland. It's much easier to fly from Vancouver to Calgary or Seattle than dig another train line; if it were "that simple," it would already be done by now.
Context is key. The Tri-Cities (with a combined population of 234k, not 148) are part of Metro Vancouver and its growth plan, are an hour away from downtown, and are "easily" integrated with existing train networks. If Abbotsford was any combination of those three, they'd be considered for rail service too.
So, why not push for commuter rail to Surrey. After all, it is the second largest population in the area. There are rail lines there. That line is not CP. What excuse do you want to use this evening?
Vancouver is NOT a high density area as much as some downtown elites would like you to believe. Vancouver sprawls just as much as any city in NA reflected by the fact that the 3 fastest growing cities in GV are the suburban wastelands of Surrey, Langley, and Maple Ridge. There is absolutely no reason to believe why this trend will not continue.
You don't build transit to serve your needs for the next decade but rather for the next century. In Vancouver's case this means a suburban rail system. Translink/Victoria should be buying up every single piece of rail/hydro corridor it can get it's hands on and forbade any development right up against those lines to guarantee them as transport corridors.
Is there a timeline for the double tracking of the Grandview cut?
There needs to be a dedicated track for passenger trains arriving and leaving Pacific Central Station without having to wait for freight traffic to get out of the way. The Grandview cut should have been double tracked decades ago.
...Also, North Van and Coquitlam are the third and fourth fastest-growing cities in the metro (sometimes New West as well). Maple Ridge is fifth...
Not trying to argue against a SkyTrain to the North Shore - we need something - but I'd suggest that the North Shore's growth should be taken in context. (BTW the Rennie link is old, based on the 2011 and 2016 census reports.) The City of North Vancouver did grow by 7.5% between 2016 and 2021, but that growth rate is based on a 2021 population of only 59 576 people. The North Shore as a whole - both North Vans plus West Van - gained less than 3 000 people from 2020 to 2021.
North Shore News: Population up across North Shore in 2021: StatCan
Not trying to argue against a SkyTrain to the North Shore - we need something - but I'd suggest that the North Shore's growth should be taken in context. (BTW the Rennie link is old, based on the 2011 and 2016 census reports.) The City of North Vancouver did grow by 7.5% between 2016 and 2021, but that growth rate is based on a 2021 population of only 59 576 people. The North Shore as a whole - both North Vans plus West Van - gained less than 3 000 people from 2020 to 2021.
North Shore News: Population up across North Shore in 2021: StatCan
Surrey already has a SkyTrain, and it's getting another. Its heavy rail corridor, as mentioned, is Class 1, and the route itself really sucks. There's perfectly logical and understandable reasons why commuter rail isn't a thing, and the Fraser Valley is fine with more bus service... but you'd rather throw a temper tantrum on the internet until you get your way.
Which is why the Langley extension is being accompanied by high density transit-oriented development in Fleetwood and Langley. The WCE stations, after 27 years, are still parking lots.
In the short term, a Valley train doesn't work. In the long term, a Valley train doesn't work. In the very long term, it finally works, and only with a completely different ROW. Meanwhile, we need something to bridge the gap in the first two terms... and in all three terms, the entire GVRD needs more SkyTrain.
Also, North Van and Coquitlam are the third and fourth fastest-growing cities in the metro (sometimes New West as well). Maple Ridge is fifth.
Could've, would've, should've... didn't. This is the situation now, and we've got to handle it; the useful corridors are already train lines.
There needs to be a dedicated track for passenger trains arriving and leaving Pacific Central Station without having to wait for freight traffic to get out of the way. The Grandview cut should have been double tracked decades ago.
While that would be an ideal solution to the passenger train delays, with CN adding the extra track to allow 2-way operation of container trains, it might just add another track that has a freight train in the way when the Amtrak / VIA train is trying to get in or out of the station! Let's hope they at least follow through and add the other track.
Switzerland is highly mountainous and has 8 mil inhabitants, with towns and villages spread out all over the country and regions. We have about 2.5 mil here in the Lower Mainland. At a third of Switzerland's population, we should be able to have at least one complete train line into the valley right?
The City of North Vancouver did grow by 7.5% between 2016 and 2021, but that growth rate is based on a 2021 population of only 59 576 people. The North Shore as a whole - both North Vans plus West Van - gained less than 3 000 people from 2020 to 2021.
Shut up on the classes. That is like saying a road is dirt so it is useless. Just like Skytrain tracks get built, so too can class 6 heavy rail.
The issue becomes the fact that there will come a point where the Skytrain will not have the capacity. That is the real problem. At what point do you look at the extensions and lengthening of stations as a futile move and add heavy rail express passenger service?
And now.... still can. Just because they didn't do something back when, does not mean they cannot do something now.