caligrad
New member
LAs trash problem is trash collection. LA needs NEW types of trash cans on every corner/block that lock and cannot be opened or ran through by the homeless and people looking for recyclables. LA needs a subdivision under Trash where its people's jobs JUST to clean up the street. Have an age limit of 18-21 to gain "work experience" with a career path that may lead to a city job. Tell a bunch of 18–22-year Olds that they can get paid 20 an hour just to drive around collecting trash from the streets and trash bins throughout the city and see how clean LA gets in a week.
The LAX train situation .... I feel like we go over this at least once a year :haha:..
There will never be a direct line from LAX to DTLA within our lifetimes. LA in a sense blew it with the Crenshaw line. If you don't believe me, just look at google maps and follow the route. When the line meets Crenshaw in Inglewood. There's actually an empty right of way not being utilized right there. If you follow it, it goes all the way to Slauson where it then still has a dedicated right of way. They then could have had a tunnel boring machine go under fig or use the cut/cover method for those 2 miles and linked it up with the expo line in exposition park for a straight shot to downtown. Instead......We got the "easy" Crenshaw line that took 3 years longer to complete.
As for "well maybe they can do that in the future". They can't. From my understanding parts of the empty right of way have been sold to neighboring lots and the portion that runs along Slauson is being turned into a "walking path". Gotta love LAs way of thinking :cheers: *Sarcasm*
The LAX train situation .... I feel like we go over this at least once a year :haha:..
There will never be a direct line from LAX to DTLA within our lifetimes. LA in a sense blew it with the Crenshaw line. If you don't believe me, just look at google maps and follow the route. When the line meets Crenshaw in Inglewood. There's actually an empty right of way not being utilized right there. If you follow it, it goes all the way to Slauson where it then still has a dedicated right of way. They then could have had a tunnel boring machine go under fig or use the cut/cover method for those 2 miles and linked it up with the expo line in exposition park for a straight shot to downtown. Instead......We got the "easy" Crenshaw line that took 3 years longer to complete.
As for "well maybe they can do that in the future". They can't. From my understanding parts of the empty right of way have been sold to neighboring lots and the portion that runs along Slauson is being turned into a "walking path". Gotta love LAs way of thinking :cheers: *Sarcasm*