Innsertnamehere
Active member
It’s almost shocking how quickly services are shifting from downtown to Ward 3.
Reading the Spec article, it actually sounds more like they are completely ceasing operation, not moving. They didn't get the government funding they were expecting, and simply can't operate.
I agree though, all of these shelters either closing or moving seems planned. I guess the city really does have a different vision for the area with all the developments. Can't blame them. Placing all these shelters in such close proximity was never a good idea.
agenda for the October Design Review Panel is posted. Presentations aren't available yet.
https://www.hamilton.ca/build-invest-grow/planning-development/design-review-panel
- 2900 King St W in Stoney Creek, which we have already seen
- 160 King St E - this is the building beside Effort Square on King. It's apparently owned by the Philpott Church, which I believe also owns the adjacent parking lots. My bet is that this will be a renovation for their new church.
- 215-217 King St West - this is the Max Foodmart on the southwest corner of King and Caroline. Another tower perhaps to join the already dense corner?
160 is the Lincoln Alexander Centre. It will be interesting to see what becomes of it.
Foodmart... be gone!
agenda for the October Design Review Panel is posted. Presentations aren't available yet.
https://www.hamilton.ca/build-invest-grow/planning-development/design-review-panel
- 2900 King St W in Stoney Creek, which we have already seen
- 160 King St E - this is the building beside Effort Square on King. It's apparently owned by the Philpott Church, which I believe also owns the adjacent parking lots. My bet is that this will be a renovation for their new church.
- 215-217 King St West - this is the Max Foodmart on the southwest corner of King and Caroline. Another tower perhaps to join the already dense corner?
Just the Max Foodmart site is only around 760sm in area.. it's not really big enough for a tower. So here's hoping it includes Tims as well. We'll have to see in a few days when the presentations get posted.
just wait until a few more construction sites start up!
Imminent construction starts (i.e. likely in the next 3-6 months):
1. Apex Condos (Queen/Main)
2. Television City (Jackson/Caroline)
3. Design District (Wilson/John)
4. Radio Arts (King/Caroline)
5. 213 King maybe? (King/Caroline)
just wait until a few more construction sites start up!
Imminent construction starts (i.e. likely in the next 3-6 months):
1. Apex Condos (Queen/Main)
2. Television City (Jackson/Caroline)
3. Design District (Wilson/John)
4. Radio Arts (King/Caroline)
5. 213 King maybe? (King/Caroline) - who knows with Vranich on this one
Others in the nearish future (12-18 months) for construction start likely include:
1. Corktown Condos (John/Young)
2. 71 Rebecca (John/Rebecca)
3. The Connelly maybe? (James/Jackson) - new owners apparently paid an above market rate for the site as it's basically ready to go for construction
4. The Moderne (King/Catherine)
I drive around Hamilton all day everyday and it is amazing to see just how much construction there is going on. This city is changing at a rapid rate and I wouldn't be surprised if we become the Vancouver of Ontario. We do have the beautiful natural setting everywhere you look and now all the towers and people moving downtown ! Would be very interesting if someone could do a drone fly over the core