McMaster Graduate Student Residence | ? | 31 & 10 fl | Complete

  • Thread starter Thread starter thmx
  • Start date Start date

On the bright side, the fire saved a step in the demolition process. Maybe the project-management point of view has had stress added, though.

Nice to see this rising so quickly.
 
Here is the picture

D71YLrLh.jpeg
 
They seem to be going super fast, like almost fast than a floor per week, on floor 10. Lots of concrete trucks at the site today, oddly they seemed to not be working on Monday or stopped earlier, no idea why:

ZhnDBVph.jpeg
 
Assorted questions:

Anyone know or speculate why the 5th tower floor is taller than the rest?
3Pa0Q27.png


Why the opening at a property line like this?
VexKGrj.png
 
Probably programming. Perhaps that room is going to be used for some sort of common area for students that require more space.

There will likely be some sort of ventilation louvres there, that's a parking garage afterall.
 
Floor 13 almost done. They're still working away next door too, unsure what they're doing still. It's just one guy in an excavator.

xSoUBDoh.jpeg
 
Floor 13 almost done. They're still working away next door too, unsure what they're doing still. It's just one guy in an excavator.

xSoUBDoh.jpeg

It's so weird seeing something there. Been a parking lot for as long as I can remember!

Sounds like the start of a joke: "So, there was a lone guy in an excavator..." :D
 