Quote:
Originally Posted by officedweller
|
If I understand the article correctly, the lower image is a comparison of the two routes considered, with the Jericho Lands route being the one they eventually recommended and endorsed.
There was some discussion by City staff (or more like, hope) of them possibly doing an option that buids both routes, but that was quickly (and rightly) slapped down by Translink as being unfeasible and impractical, as both stops would likely be cannibalising the same pool of riders, and building that dual-route option would almost likely drive the project way overbudget.
The Jericho Lands stop makes more sense especially considering the fact that in addition to the usual UBC students/employees and the anticipated increased population from the development of those lands, you'l also have people using it to more conveniently get to and from Jericho beach.
They'll likely just create a shuttle service between the Jericho Lands stop and Sasamat to serve the riders from there who would have been the ones using a Sasamat stop.