DENVER | Main Development Thread #7


Did someone here write this Denverite article on the Amacon project? Exciting new rendering

Denver’s condo freeze thaws with 461 new units coming to the old Shelby’s Bar & Grill site
DPA-B176-Rendering-2-1024x1280.jpg


https://denverite.com/2021/12/15/denvers-condo-freeze-thaws-with-461-new-units-coming-to-the-old-shelbys-bar-grill-site/
 
DIA $1.1 billion budget request to finish Great Hall project passes committee. - Denver Gazette
Gone is the retail area for departing passengers, the render now shows escalators going directly down to the trains from security on level 6 all the way to level 4.

61ba82be10fb5.image.png
 
1900 Lawrence lot is now closed to parking. A sign is up saying under new ownership as of Dec 14th and any remaining vehicles will be towed. Some fencing starting to go up on the perimeter.

woot!
 
1900 Lawrence lot is now closed to parking. A sign is up saying under new ownership as of Dec 14th and any remaining vehicles will be towed. Some fencing starting to go up on the perimeter.

woot!

I had monthly parking in this lot and am in process of obtaining a refund. I spoke with Hensel Phelps person onsite this morning and they will begin preliminary site work after the holidays with a groundbreaking in March.

Upward!
 
I had monthly parking in this lot and am in process of obtaining a refund. I spoke with Hensel Phelps person onsite this morning and they will begin preliminary site work after the holidays with a groundbreaking in March.

Upward!

That's awesome news! Having three 30-plus story towers going up in 2022 is not something that I would have expected a year ago.
 
That's awesome news! Having three 30-plus story towers going up in 2022 is not something that I would have expected a year ago.

Its looking likely we will have 7 towers under construction in the same close vicinity surrounding Arapahoe Square within two years.

Completion of XD2 - 250 ft
Tower 1 Amacon - 400 ft
Tower 2 Amacon - 350 ft
1900 Lawrence - 400 ft
Kenect Denver - 250 ft
Tower 1 Golub/Rockefeller -400 ft
Tower 2 Golub/Rockefeller -400 ft

Unlike other 'proposed' buildings, these projects have serious money already invested, land purchased, demolitions done or commencing, not to mention active project files with the city of Denver. Obviously no guarantee, but things are definitely pointing in the right direction.

There is also the Evolve Towers in the "proposed" status in this same area. I'm still skeptical about this one, but it would add another two towers (250ft each) bringing the total to NINE towers with overlapping construction timelines and a HUGE cluster of seven to twelve tower cranes at peak.
 
Its looking likely we will have 7 towers under construction in the same close vicinity surrounding Arapahoe Square within two years.

Completion of XD2 - 250 ft
Tower 1 Amacon - 400 ft
Tower 2 Amacon - 350 ft
1900 Lawrence - 400 ft
Kenect Denver - 250 ft
Tower 1 Golub/Rockefeller -400 ft
Tower 2 Golub/Rockefeller -400 ft

Unlike other 'proposed' buildings, these projects have serious money already invested, land purchased, demolitions done or commencing, not to mention active project files with the city of Denver. Obviously no guarantee, but things are definitely pointing in the right direction.

There is also the Evolve Towers in the "proposed" status in this same area. I'm still skeptical about this one, but it would add another two towers (250ft each) bringing the total to NINE towers with overlapping construction timelines and a HUGE cluster of seven to twelve tower cranes at peak.

Nice! Is X3 still happening?
 
A Square is going to very different in a few years, especially with the 5280 trail. The Evolve Towers are legit though, right? Isn't the confidence level in that project has happening pretty high?
 
Last edited:
A Square is going to very different in a few years, especially with the 5280 trail. The Evolve Towers are legit though, right? Isn't the confidence level in that project has happening pretty high?

Yeah, just no construction permitting activity yet. Considering they said that they plan to break ground soon, they don't seem to be moving quickly. This is a developer with no track record of delivering a single project and probably meager financial means unlike the big players from Vancouver, Chicago and New York developing the other properties in the towers list.

It could happen though, they claimed to be getting major interest from investors, their development plans are 100% city approved, they bought the property, the city seems enthused about the "attainable" price point, and of course they cleaned up the encampments and designated that surrounding area as a frequent clean-up zone. All of these are positive indicators.

One other interesting aspect to eVolve towers is that it will be the first construction project in Colorado to use "top-down" construction, whereby the core is erected and then floors are fabricated and raised to highest open level and they work their way down. That would be very interesting to see.
 
One other interesting aspect to eVolve towers is that it will be the first construction project in Colorado to use "top-down" construction, whereby the core is erected and then floors are fabricated and raised to highest open level and they work their way down. That would be very interesting to see.

That sounds very different from what's normally called "top down construction." This involves building the below-grade parts from the top down, which you can do while the above-grade part is built normally. Youtube 1. Youtube 2.
 
That sounds very different from what's normally called "top down construction." This involves building the below-grade parts from the top down, which you can do while the above-grade part is built normally. Youtube 1. Youtube 2.

Evolve Towers is designed employing a novel technology from TGE Construction and it is different from the top-down excavation construction that you reference.

It reduces construction costs by having most of the fabrication, including plumbing and electrical, done on the ground and then whole floors are hoisted up the core one by one. It also eliminates the need for tower cranes.

Here is a video that illustrates the process.

• Video Link
 
cool interior render of a unit in Evolve Towers showing the Denver skyline out the window.

evolve-interior-rendering1.jpg


I really do hope this gets built and at least partially becomes for-sale condos at a more affordable price point.
 


Back
Top