Regina Construction IV


Yup, the city of Regina ending sponsorships with the fossil fuels industry would totally destroy the industry. Please, enough with the hyperbole.

I didn't say that. I got the impression that you want to shut down the industry, but maybe I misunderstood you as well.
 
I remember when our province was paying down debt and had record oil royalties, I repeatedly said now is the time to invest in alternate energy, technology, etc. Build strength on top of strength. Instead we let arrogance and shortsightedness get in the way.

The second best time to do this would be right now, but it appears arrogance and shortsightedness is still running rampant.
 
Is there a dedicated political thread that I can stay away from?

I don't really give a shit about anyone's political opinions in a construction thread.
 
Update on the Cargill (shuttering as I type that) canola crushing plant: my dad was working on the project driving heavy machinery as they prepare the ground. He mentioned they were working on an embankment over train tracks. I was surprised to hear that would be part of the project. Anyone have any more details? Sounds like it’ll quite the site for a private company.

I assume that will be a crossing of their private rail spur off the CP mainline. Given the volume of railcars they will require on site, the tracks will be full of cars nearly all the time, so they will need a grade separation to cross.
 
67607-EBD-2-D5-F-4-D93-94-B6-148-F06-B47521.jpg


https://www.collierscanada.com/en-ca/properties/strategic-location-superior-logistics/can-rotary-avenue-west-regina-bypass-regina-saskatchewan-canada/can2004109

Anyone know where the Cargill build will be?
 
Yes, the loop tracks are incredibly efficient, but use a lot of land. In many cases, they can bring a unit train and not even unhook the locomotives. They just slowly do a a loop filling several cars at a time and then head back out directly on to the mainline. The sketch is not entirely clear, but it appears they may be proposing a second connection to CN to the north.

Also you can see the grade separation on the upper east side.

To understand the scale of this thing, take at look at how tiny the semi trailers at Loblaws appear.
 
11. How tall will the facility be?
The facility will be approximately 130 feet tall, give or take 10 feet, depending on final equipment placement
This will stand out
 
It will most likely be built close to the tracks; a fair chunk of the GTH is sold

I am having trouble separating the facts from the politics. Does this mean the GTH as public investment has turned successful?

The short game on the GTH was full of problems, but the long-term outlook doesn't look bad at all. The death of just-in-time shipping should drive demand for warehouse space too.
 
I would take anything that particular poster says with a grain of salt. They don't even read the articles they post and comment on, and have some sort of weird, naive optimism that is based on little facts.

I sure hope you're right about the death of JIT shipping. What a farce that turned out to be. Environmental, social, and biological disasters are going to become more frequent so hopefully our economy adapts.

And you are one of the most negative nellies on here nothing is ever good enough you hate this you hate that what’s your problem , by the way Grinch try and have a good day I’m sure you will argue about this to
 
And you are one of the most negative nellies on here nothing is ever good enough you hate this you hate that what’s your problem , by the way Grinch try and have a good day I’m sure you will argue about this to

99% of us agree with you mayor. He should be banned for life on this forum.
 


Back
Top