I was talking about taking it down completely since that appears to be what the winning bidder for the property is most likely to do.
Jahn did release renders for a 110 story supertall addition to the Thompson Center as a way to preserve it, but that project would still not really have addressed the issue of the building requiring over $300 million dollars in deferred maintenance as well as the vast insulating work/HVAC upgrades to keep the existing building from freezing in the winter and cooking in the summer. From a cost/benefits standpoint, it's unlikely any developer would sink that much money to save the existing structure unfortunately.
The proposed tower appears to have been on the southwest corner of the property: