cganuelas1995
Active member
without the whole system having local + express (4 tracks) then none of it ever will. there really is no point. not unless they want to run express trains from langley - surrey, then turn them into local trains for the rest of the trip.
not sure if the timing could be made to work, but who knows.:shrug:
personally, i think local + express tracks would have been a good idea in the original system. but they probably didn't need it since headway's on SkyTrain are a lot more than normal subways so that can compensate to a point.
i still think they should be building the whole system with 100m platforms though... shame they re only doing 82.5m for the Broadway Subway.
Yeah I feel express services could also expand capacity by getting the inter-zone commuters past stations that aren't major stations (any station in urban centres or connects with other skytrain lines or lots of bus routes). I used to live in Richmond, I would take a bus to the station and basically ride the entire route all the way downtown. It would have shaved a bunch of time off my commute if I could have skip Lansdowne, Aberdeen, 49th, and King Edward.
Last edited: