jollyburger
Active member
No that's a worker's car parked doing work on the multi use lane
Not really the fault of this project, but it is total gridlock on the North Shore right now due to some emergency pothole work on the bridge deck.
https://www.google.ca/maps/@49.3129934,-123.0760836,12.29z/data=!5m1!1e1
Whether or not this comes to fruition in our lifetimes, it would be interesting to see what alignment they use. The location of the current IWM is offset to the east, compared to the rest of the freeway, so a new structure west of it could help to correct the somewhat dangerous curves in the roads on either side of the bridge.I would love to see some real progress made to increasing the capacity of our bridge link to the North Shore. 9 lanes of vehicle traffic isn't cutting it anymore. I know rapidtransit is coming to the North Shore, but I think it's time we consider replacing the IWMB with a 10 lane + rapid transit bridge to replace the aging IWMB.
I would prefer if they also converted the Cassiar Tunnel exit lane going WB into a through lane, and have the hastings on-ramp serve as a through lane rather than a merge in a 10 lane bridge crossing.
On the EB route, i would give Dollarton on-ramp a through lane and i'd add a third lane each direction from Taylor Way all the way down the cut.
The Capilano bridge would need to be replaced with a modern 6 lane bridge with expansion to 8-10 lanes for future growth. Why isnt this being proposed?
Whether or not this comes to fruition in our lifetimes, it would be interesting to see what alignment they use. The location of the current IWM is offset to the east, compared to the rest of the freeway, so a new structure west of it could help to correct the somewhat dangerous curves in the roads on either side of the bridge.
Looking at google maps, a new span could easily be moved like 500 metres west. would reduce the curve significantly.
I think your best hope for a new bridge is a ship smacking into one of the piers.![]()
We have to be realistic, as there are too many properties to the west which may make this location very expensive. Alternatively, if I were to design a bridge, I'll put it exactly on top of the old span (between the two red circles, and create much shallower curves on the approaches. This location will likely require the least property interruption and is much safer than the existing location.
https://ibb.co/9m0hNZY


Another dangerous stretch, is the capilano river overpass. There is mostly parkland north of the bridge. We could build a new overpass with capability of 8 lanes (4+4) and be able to build a proper merge lane for the dangerous on-ramp that currently exists.
If only they had built the bridge with two decks, like Seattle’s I-5 Ship Canal Bridge, built around the same time.
...If the Lions Gate Bridge was ever replaced with a bigger bridge, it should have 4 lanes + 2 dedicated Bus Lanes in the future...
Huh. I have driven Interstate 5 many times but never realized that this bridge has a lower deck. Is that for local traffic? I agree that a second 3+3 lane local traffic deck would be perfect. Second Narrows needs to be overbuilt when it gets to replacing it, as there is never going to be another crossing and people from the city will continue to flock to the mountains.
That's also a great point about the Capilano onramp being basically what Dollarton onramp was. There should be a third westbound merge lane across the bridge. A super dangerous design as it is.
Huh. I have driven Interstate 5 many times but never realized that this bridge has a lower deck. Is that for local traffic? I agree that a second 3+3 lane local traffic deck would be perfect. Second Narrows needs to be overbuilt when it gets to replacing it, as there is never going to be another crossing and people from the city will continue to flock to the mountains.
That's also a great point about the Capilano onramp being basically what Dollarton onramp was. There should be a third westbound merge lane across the bridge. A super dangerous design as it is.