As someone who watched the project for years and years the beginning of all the work has been surprisingly uneventful. This project is really going to transform the network so of course I am super excited, just surprised there isn't more talk!
Traffic Decking by B.C. Ministry of Transportation and Infrastructure, on Flickr
Removal of Tunnel Boring Machines Near Arbutus by B.C. Ministry of Transportation and Infrastructure, on Flickr
Mount Pleasant Station Aerial by B.C. Ministry of Transportation and Infrastructure, on FlickrRenders of the temporary roadway decking for Broadway overtop station construction, four lanes on Broadway in these sections.
Traffic Decking by B.C. Ministry of Transportation and Infrastructure, on Flickr
Renders of the temporary roadway decking for Broadway overtop station construction, four lanes on Broadway in these sections.
Traffic Decking by B.C. Ministry of Transportation and Infrastructure, on Flickr
TBM removal shown at Cypress Street.
Removal of Tunnel Boring Machines Near Arbutus by B.C. Ministry of Transportation and Infrastructure, on Flickr
[...]
Did they use GeoSim for these?
Elevated Guideway by B.C. Ministry of Transportation and Infrastructure, on FlickrWhat the hey? For what distance and for how long? I hope my favourite local ramen place survives. They've worked hard to survive covid and the staff are wonderful and personable.
(raises hand) Why're they taking the TBM out at Cypress? That doesn't sound good...
Did they use GeoSim for these?
The station box will be between Arbutus and Maple, I’ll assume there will be a crossover switch (or perhaps a pocket track) before the station which needs to be excavated East of Maple so the bored tunnel will end at Cypress.
Fair enough. Can we assume that there'll be extra room past Arbutus so we don't have to shut the station down for the UBC phase?
Fair enough. Can we assume that there'll be extra room past Arbutus so we don't have to shut the station down for the UBC phase?