Road base requires a lot of water to compact. It can't be done in freezing temperatures. For job planning purposes, road crews start after May long. Sometimes they can start a week or two early.
Fingers crossed!!
Road base requires a lot of water to compact. It can't be done in freezing temperatures. For job planning purposes, road crews start after May long. Sometimes they can start a week or two early.
I assume they still need to finalize design drawings. Get a tender out for contractors. Line up the cash flow. Etc.
Probably do rock blasting work over winter.
I noticed on snap chat on the snap map people are video taping near kenora major road blasting. Parts of the trans Canada is gravel in parts.
MTO has been quietly doing work along Kenora Bypass until one day that giant boulder made the news. (I shared it a few pages back.)
Wait a second...what's the province planning to do at the Symington overpass?
I ask because although there's no real idea of when it will happen, I get the impression that the Bishop Grandin extension to Hwy 1 has more or less made it on to the city's radar. As such, I wonder what they plan to do with Plessis at the yards to facilitate the extension. I don't imagine we're talking about any substantial changes, of course, but the ramps must make it something of a close-run thing if you get my drift.
https://www.kenoraonline.com/articl...17-to-begin-this-fall-after-historic-ceremony
Read: Except delay at Manitoba-Ontario border this fall.
It’s nuts they are waiting until Fall to get going. They’ve had 10 years to be ready to go once it was made official. :superwhip:
I would hope the Province and City work together on a long term functional plan. Bishop would be best served to connect with plessis directly. As opposed to just running straight out to fermor near 101.
The short term bishop extension is only a local road to des hivernet to serve sage creek.
.