Quote:
Originally Posted by Acajack
As a fan of transit I am quite happy that there are projects like the various Ottawa LRT extensions and the REM in Montreal that are well enough along.
Because with the changes that COVID will likely bring to society and a likely financial crunch in the near-future, I don't have much hope for anything that doesn't already have shovels deep in the ground.
That means the tramway project for Plateau-Aylmer in Gatineau, unfortunately.
|
I don't think COVID is really going to hurt transit that much in the long run. Widespread working and studying from home for both office workers and university students was fun at first but it has serious drawbacks.
The WFH model is not good for socialization, company bonding/morale, or for networking/setting up a career. There's also very real security concerns with WFH - for this reason, I think the federal government especially will pivot back hard to in-person office attendance.
Post-secondary institutions, too. It's becoming very clear that Zoom webinars are not even remotely close to a proper substitute for in-person attendance for universities. I'd argue that for a university, actually being there and being immersed in the environment is way more important than the actual academics, and with the class-from-home model, you're missing all of that. "virtual coffee meetups" are no substitute for actual human interaction.
After this is all over, I think we'll see a strong cultural reaction
against the idea of remote-everything, and doing things "for real" will become the cool thing to do. 2020s popular culture will be all about tangible things you can see with your own eyes, and feel with your own hands. We're seeing a preview of this with the growing interest in things like breadmaking, camping, etc. Physical distancing will be a thing of the past and will not be something people will want to keep up.
That said, I do think there will be a higher rates of telecommuting than in the old times, as some people really do enjoy it. For this reason I do think peak-period transit ridership may indeed take a longer term hit, possibly taking as long as 10-15 years to return to 2019 levels. This isn't necessarily a bad thing - peak period surge capacity can be expensive to accommodate for transit agencies. If anything, smoothing out demand peaks at rush hour would improve the economics of transit.
In Ottawa's case, this does call into question whether LRT investment was worthwhile, as the old Transitway system worked well enough outside of rush hours. Not to say that the Confederation Line isn't an improvement - the user experience overall is far superior IMO - but the necessity of it as an upgrade is questionable if we don't have such a large peak-period ridership surge. The Kanata and Barrhaven extensions are probably dead - they were already on shaky ground. If it wasn't already under construction, the Orleans extension would be too.