Quote:
Originally Posted by Truenorth00
Tough sell to pitch projects that don't have any study behind them and with the end result that government will have to throw tens or hundreds of millions in new operating subsidies after the project is done.
|
To be fair, resumption of the Victoria–Courtenay train has been studied and the Federal government promised $7.5 million to do the repairs back in 2014, but never came through with the funds.
ref1, ref2 Also, VIA Rail did list this route (along with the Matapédia – Gaspé route) as two of their Regional Services in their
Summary of the 2018-2022 Corporate Plan on pg.21, but indicate that they "have been suspended for safety reasons."