Does anyone know if they intend to replace the remaining walkway red brick tiles after completing AC? They seem white'ish in the rendering, so I'm thinking yes?
The developer, LaPour Partners, is working with the architect AXIS GFA and the builder Layton Construction, on this 13-story and 199-room hotel scheduled to be completed within 18 months after groundbreaking, according to information provided by Sonnenklar.
“Downtown Phoenix is a true destination, and soon Arizona Center will be able to host out-of-town visitors in the heart of it all,” Rood said.
Palm Tower, the 31-story residential tower on Arizona Center’s property, will break ground by the end of the year, according to Sonnenkar. North American Development Group (NADG) will be working with Will Bruder Architects on this project. The builder has yet to be determined.
Sonnenklar said in an email that the Palm Tower is scheduled for completion approximately 24 months after the groundbreaking.
The cranes are really adding up. Very neat to see them all.
Did we get two for X Phoenix? Drove near downtown and the only crane I could see from the 202/51 was Kennec.
Tower crane is being installed today.
:cheers::cheers::cheers::cheers::cheers:
Where's that Crane watch study now????
By the time they do it again we'll have a crane for Aspire and Filmore too, maybe even Hines.
Just a couple tidbits of info on Palm Court's height for us height junkies. I decided to put in a records request for the heck of it for AZ Center and it came in today. The design for Palm Court is the one that we have seen from Will Bruder's site. But the total height to the parapet will be 292'. So this one will not break 300' unfortunately. Also, AC will be 151' officially.
Here's the record's requests for anyone that wants to look at them: https://drive.google.com/open?id=1-P9b-4XdmlITB6NyvTw_9K59XOxXQwCz
Here's the record's requests for anyone that wants to look at them: https://drive.google.com/open?id=1-P9b-4XdmlITB6NyvTw_9K59XOxXQwCz