Quote:
Originally Posted by PEI highway guy
does anyone know has between done on Route 85/185?? this summer between Riviere Du Loup and NB? I realize the bulk of the road has been twinned, however, the completion of this road is taking forever.
|
I have mainly posted news about A85/Rte 185 in the TCH thread and in the Quebec highway thread. So far, work on 4 out of 7 sections of the final phase are underway. Construction around Rivière Verte (Saint Antonin) may cause minor congestion. MTQ intends to open the new freeway sections one by one gradually, between 2021 and 2025. (In other words, by 2025, one can travel from Windsor, ON to Halifax, NS completely on freeways.)
Speaking of A85, I was also gonna mention that CAQ also wanna bridge the gap of A20 between Rivière Trois Pistoles and Rimouski. Funny enough, only the section around Trois Pistoles will see 4 lanes right from the get-go.
By the way, how many lanes is the TCH Cornwall Bypass (P.E.I.) supposed to have? It looks like there’ll only be two lanes, but I can’t find official documents about it. .