Did they give an estimated date when the existing building will be fully taken down?
Found this on Twitter yesterday, I just cut and pasted it. It's a possible explanation for why we haven't seen renders:
Theodore Grunewald
@TedGrunewald
·
Sep 1
A reliable source tells me Foster's office is *not* releasing a rendering of 270 Park's replacement until they're certain that "every last scrap" of Natalie de Blois' 1961 façade "is in the dumpster."
09/10/2019
EXPRESS SLAB MODIFICATIONS, RE FRAMING OF STEEL AT THE EXPRESS LEVEL, AND TRAIN PLATFORM REDESIGN. NOTE: THE CONSTRUCTION COST ASSOCIATED WITH THIS SCOPE OF WORK IS CAPTURED IN THE ESTIMATED OF 49,500,000 AS SHOWN ON DOC-03 OF THIS APPLICATION
is this likely the final word — or just what we know so far?
‘The proposed 1,322-foot-tall development will yield 2,439,635 square feet, with 1,871,767 square feet designated for office space.’
is this likely the final word — or just what we know so far?
‘The proposed 1,322-foot-tall development will yield 2,439,635 square feet, with 1,871,767 square feet designated for office space.’
That's a ton of non office SF, is that all retail/mechanical?
We've seen 1,322' and 1,341', not sure what that actually refers to yet, hopefully occupied solid roof with a parapet going higher :shrug:
Does perimeter wall height refer to the highest slab (straight from the street) before a setback? That's what I would assume.
I always thought it was that or the highest wall over occupied or zoned space. I'm never sure what it is, but it's higher than what the stated height (obviously not final height) of the building is on the construction permit. Only the zoning diagrams that will appear when the construction permits are approved will say for sure. That or an official release of renderings and information on building height.
I'm relieved it won't be a skinny chimney either