I almost never post anything, but I did want to mention all the construction in North Natomas and by the airport. If you haven't driven up the 5 recently, there are several projects under construction. There are several areas (circled) where housing is under construction as well, some not shown on the map (south of Arena). Anyway, a lot is happening, maybe even a new zoo...wishful thinking.
1) Metro Air Parkway Interchange (under construction) - New freeway interchange connecting Metro Air Parkway, which runs up to the 'new' Amazon building. (
https://www.bizjournals.com/sacrame...-air-park-interchange-underway-with-more.html)
2) Greenbriar Development (under construction) - Nearly 600 acres, 3K homes, commercial, etc.
https://www.cityofsacramento.org/-/...vationStrategy1417-1-00192414xC4B98.PDF?la=en
3) North Natomas Aquatic Center (under construction) -
http://bcaarchitects.com/portfolio/north-natomas-community-center-and-aquatics-complex/
4) Spec commercial/industrial (under construction) - sat unfinished for a while, there are several multi-level spec building finishing construction.
5) Hilton Garden Inn (complete) - just recently finished
6) Centene Sacramento Campus (under construction) - currently, two large, 4 story office buildings as part of new campus that takes up that entire area off Arena/I5 -
https://www.centene.com/news/centene-dedicates-sacramento-campus.html
7) Another hotel under construction - not sure what it is yet.
8) Natomas Crossing Apartments (under construction) - Not too exciting, but it's getting pretty dense right there. -
https://www.cityofsacramento.org/-/...sing-Apartments-Addendum-P17062-WEB.pdf?la=en
9) Wyndham Garden Hotel (under construction) -
https://www.wyndhamhotels.com/wyndh...am-garden-sacramento-airport-natomas/overview