HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Diagrams & Database > Building Requests & Database Corrections > Completed Requests


Reply

 
Thread Tools Display Modes
     
     
  #1  
Old Posted Apr 18, 2019, 8:07 AM
mteregdl mteregdl is offline
Registered User
 
Join Date: Oct 2018
Posts: 82
Building Request | Torres Diez

-----------------------------------
BUILDING REQUEST FORM 1
-----------------------------------


Official sources: https://nest.com.mx/es/proyectos/DIEZ.html, https://nest.com.mx/assets/e-brochure/DIEZ.pdf

Unofficial sources: https://www.mural.com/aplicacionesli...c16cb9ad1b2efe, http://www.landingpointei.com/inmueb...y/?RID=5590300, https://www.inmuebles24.com/propieda...-51884572.html, http://www.behome.mx/propiedad/diez-...-monterrey-nl/

Building Name: Torre Diez Norte
Native Name:
Other Names:
Street Address: Anillo Perif. No.100, Colinas de San Jerónimo

City: Monterrey
Postal Code: 64634
State/Province: Nuevo León
Country: México
Official Building Website URL:
Wikipedia.org URL:
Skyscrapers.com (Emporis.com) URL:
CTBUH.org URL :
Structurae.de URL:
• Architect:
Interesting Facts/Records (in own words):


Coordinates (with decimal fraction): 25.697092, -100.381742



Heights--

- antenna:
- spire:
- roof: 60 meters.
- top floor:
- other heights:


Current Building Status (Built, Proposed, Cancelled, Destroyed, etc...): Built

Construction Dates--
- started: 2015 (Estimation made with this google earth historical photo of Nov 2015.)
- finished: 2017 (Estimated with GSV, the previous photo also from 2017 shows the tower clearty in construction. However this shoot from sep 2017 has the tower with the advertising and everything.
- destroyed:



Above ground floors: 17
Basement floors:
Gross Floor area:
Unit count: 54

Structure Type(s): Highrise
Building Use(s): Residential, parking.
Building Style(s): Modern
Building Materials: Concrete, aluminum, glass.





-----------------------------------
BUILDING REQUEST FORM 2
-----------------------------------


Official sources: https://nest.com.mx/es/proyectos/DIEZ.html, https://nest.com.mx/assets/e-brochure/DIEZ.pdf

Unofficial sources: https://www.mural.com/aplicacionesli...c16cb9ad1b2efe, https://www.inmuebles24.com/propieda...-51884572.html, http://www.behome.mx/propiedad/diez-...-monterrey-nl/

Building Name: Torre Diez Sur
Native Name:
Other Names:
Street Address: Anillo Perif. No.100, Colinas de San Jerónimo

City: Monterrey
Postal Code: 64634
State/Province: Nuevo León
Country: México
Official Building Website URL:
Wikipedia.org URL:
Skyscrapers.com (Emporis.com) URL:
CTBUH.org URL :
Structurae.de URL:
• Architect:
Interesting Facts/Records (in own words):


Coordinates (with decimal fraction): 25.696699, -100.382081



Heights--

- antenna:
- spire:
- roof: 45 meters.
- top floor:
- other heights:


Current Building Status (Built, Proposed, Cancelled, Destroyed, etc...): Built

Construction Dates--
- started: 2016 (Estimated with this Google Earth photo of April 2016)
- finished: 2018 (Estimated with Google Street View) The photos from 2017 show the topped tower but it wasn't complete. The link to the GSV at Sep 2018 shows the building pretty much finished.
- destroyed:



Above ground floors: 14
Basement floors:
Gross Floor area:
Unit count: 46

Structure Type(s): Highrise
Building Use(s): Residential, parking.
Building Style(s): Modern
Building Materials: Concrete, aluminum, glass.


Buildings:





Note: They go by separate.
Thank you.

Last edited by mteregdl; Apr 19, 2019 at 8:23 PM.
Reply With Quote
     
     
  #2  
Old Posted Apr 19, 2019, 1:26 PM
LMich's Avatar
LMich LMich is offline
Midwest Moderator - Editor
 
Join Date: Jan 2002
Location: Big Mitten
Posts: 31,745
One source say the apartments would be ready in 2017, another says 2018. That may be for each tower. In any case, in doesn't appear they were completed in 2016. Google Maps doesn't even show that I don't think.

Find out for me when each of these was started and completed. Google Maps seems to show one well under construction before the foundation work for the other began.
__________________
Where the trees are the right height
Reply With Quote
     
     
  #3  
Old Posted Apr 19, 2019, 8:17 PM
mteregdl mteregdl is offline
Registered User
 
Join Date: Oct 2018
Posts: 82
Quote:
Originally Posted by LMich View Post
One source say the apartments would be ready in 2017, another says 2018. That may be for each tower. In any case, in doesn't appear they were completed in 2016. Google Maps doesn't even show that I don't think.

Find out for me when each of these was started and completed. Google Maps seems to show one well under construction before the foundation work for the other began.
It seems like your appreciation was on point. The first was completed by 2017 ant the last one was completed well into 2018.
Reply With Quote
     
           
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Diagrams & Database > Building Requests & Database Corrections > Completed Requests
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 10:15 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.