Then remove the Production Line Spur, and return it to the Millennium Line.Problem there is that you'd give up one of SkyTrain's major advantages: frequency. One branch line to Production Way, one to Newton, and one to Langley means about a five-minute wait at peak hour. If we're going with an "Expo to Newton" scenario, better make a separate Langley-Guildford Line.
Then remove the Production Line Spur, and return it to the Millennium Line.
Or are there problems I'm missing here?:shrug:
Is the Evergreen Extension so busy that the Millennium Line can't branch into two?
It was mine, actually.I can't find it online, but I remember a Vancouver Sun two-page spread on Gordon Campbell's 2008 $14 billion transit plan that showed a jog up to Guildford before coming back down to Fraser Highway, just as officedweller suggests. I kept a copy of that page, but can't find it now (I might have recycled it). The existing images online don't show the Guildford diversion.
BTW, love the use of the paper map, officedweller.
It's more logistics than demand. Having the M-Line terminate to Lafarge Lake from VCC-Clarke than looping back reduces the complexity of interlining. Officedweller make a good post on that stuff, but I can't remember when he posted it.
Add me to the list of supporting officedweller's plan. That looks really feasible and cost effective. It maintains Central City as the main hub while ensuring 104th and Guildford are serviced adequately as the train heads down 152th and down Fraser Highway to Langley. Sorry Newton....you're crime ridden anyway with weirdos and gangs. Take the bus, for now. But facetiousness aside, this is an excellent example of route planning the city should consider.
People are forgetting that Newton has a larger population than Langley and will continue to do so as one of the faster growing areas of Surrey to 2045.
Ron.
This here is why it's kind of crazy that Newton only warrants B-Line buses but Langley gets SkyTrain. Why not a B-Line down Fraser Highway? Oh wait.
What we really need is to get to a position where we're not squabbling about the technology of the routes, which is really driven by a lack of funding. We need to get to pushing for higher levels of funding so the Newton-Surrey Central-Guildford LRT (or whatever technology makes sense) can happen AND Fraser Highway can get whatever rapid transit it should have (as decided by actual transit planners and not mayors) AND these things happen quicker instead of having to be drawn out over twenty-year periods. SkyTrain vs LRT is a distraction, when the actual challenge we should be tackling is scarcity vs abundance.
It was mine, actually.
It was from Mapart, which no longer produces its high-quality maps, unfortunately.
https://vancouversun.com/news/local-news/experts-weigh-in-on-the-costs-of-skytrain-vs-lrt-in-surrey
“SkyTrain costs more and does less”
Wtf?? :???:
"experts"
Problem there is that you'd give up one of SkyTrain's major advantages: frequency. One branch line to Production Way, one to Newton, and one to Langley means about a five-minute wait at peak hour. If we're going with an "Expo to Newton" scenario, better make a separate Langley-Guildford Line.
This here is why it's kind of crazy that Newton only warrants B-Line buses but Langley gets SkyTrain.
I see this all a little different.
An extension should be built to both Newton and Guildford. They should be designed so that they could be their own line separate of the Expo line. Then, build the Skytrain to Langley.
Now, for those that say that is not enough for the legs, what you now do is make the Newton - Guildford section a new "line"
Build an extension north of Guildford to PoCo to connect with the Evergreen section. That would turn the Newton - Guldford section into the Millennium Line.
Then, a future extension to White Rock could be done.
Solves a lot of problems and gives more access to more areas by Skytrain.
Broadway's got several times then population and density, but they've had to make do with a B-Line for over two decades now... while semi-empty industrial land next door got the full starchitect treatment. Surrey hasn't even had their B-Line for one decade (and three-door boarding only came a year or two ago).
Not saying any of that is fair - on the contrary, it's understandable for Newton and Guildford to be resentful - but the needs of the entire metro outweigh two town centres.
And it's not like they're being robbed here. Remember that the light rail's capacity and trip times are barely above the 96's, much less a BRT's.
You're not wrong, but I highly doubt we're going to reach Coquitlam with $1.7 billion - maybe in Phase 3. For now, the plan needs to focus on a purely SoF route, and that probably means extending the Expo Line to Langley or Newton.
BTW, wouldn't it make more sense to make it separate from the Millennium? Running the Guildford-Coquitlam extension down Mariner allows for a second station atop Coq Central (a la Commercial-Broadway) - then it can take over Lincoln & Lafarge, and the Millennium can run to Maple Ridge at full frequency.
I see this as at least 3 phases. But getting it up there and getting it down to White Rock should be done within 25 years.