Are you channeling Biff?I get the feeling / premonition some thing large in scale will be announced for downtown Winnipeg in short order.
Are you channeling Biff?I get the feeling / premonition some thing large in scale will be announced for downtown Winnipeg in short order.
I would be interested in what Artis has planned for Fort Street (Vendome). We have not heard anything for a couple of years now.
^^ well we are over due for some relatively large proposal. I don't believe anyone has made one since 300 main was announced (well maybe sutton if you count their announcement last summer that they would be proceeding). If only Harvard had an ace up their sleeve for 416 main
Well Drew (I think it was) has mentioned there is a project we will all love coming soon. Also the Boyd building addition/twin.
Last summer Harvard said they would wait for TNS to finish and settle into the market before making any decisions on 416 Main, said it would be five years out before anything concrete, they have their hands full trying to fill the vacant space in 201, they should be starting their lobby redevelopment soon.
That Metropolitan sign is cool. RIP.
I just wish I knew if they were looking at any sort of ideas and if they had done any work at all. Basically just pick the brain of the head of their development team to see what they have in mind. They must have some idea of what to put on the land.
Question for TV as an outsider – it seems like a lot of these local architecture companies producing a lot of these basic, cheap designs (that they would deem "modern") are borne of recent, young U of M grads... has the school lost is way? Or does the problem fall moreso on the developers and city for being cheap and approving ugly, respectively?
I'm not an architect, and not defending 254 Wellington's design in particular, but most of what I've seen of these younger upstart firms doing infill projects is they're managing to do good design for risky projects that have low capital and low returns.
Nope. If it made the required money while achieving the design intent, it would proceed close to render.I would say that the problem probably lies more with the developer side of things, though that is more beyond my knowledge as a student.
The point is that they shouldn't bother with the fancy looking rendering to begin with even if it is just for marketing purposes only. If there is no intention for the final product to look anything like the initial drawing then skip the false hype and just actually draw something that will actually look the same as what is to be built. The only thing similar in this case is the overall shape of the structure. It's like showing someone a picture of a crystal glass ornamental round ball and then presenting them with one of those red, white and blue rubber balls and saying - "okay, here you go".
I get the feeling / premonition some thing large in scale will be announced for downtown Winnipeg in short order.
im guesing this is the group behind that 40 story proposal that was tried for 100 main st? number yrs back and they got them self a peic of braodway now
but im just throwing the biggest wildest gues to stir the pot here folks..
One in the fall....one likely in the spring. Maybe winter.
Are you referring to Crystal Properties? Those are the guys that developed 300 Assiniboine and did the land swap with the city. Was that not the proposal for 100 Main?
So I was looking at my property tax and it's zoned as
R1M - Res - S F - Medium
Does anyone know what that means?
no one of the other bidders
not sure who they were that bit was never made public but a rendering did float around for it. was some sorta 40 story mix use project right at assinboine and fort