Edmonton Construction 13 (November 2015)


Status
Not open for further replies.
How many floors does Stantec have to go or is it topped out? I took a ton of shots last night and it looked like they were still adding floors...
 
Augustana's crane is now complete, just in time for the next storm.

Dip9Nb_U0AAwk2W.jpg

@ianoyeg
 
Former Enbridge Tower on Jasper/102st has workers on site and it looks to be on its way to becoming a 300 suite hotel.

Di4JKvTUwAA7jcV.jpg

@ianoyeg
 
Excellent......be nice to see if they light up the crown in some capacity.





Or incorporate this little element!......Pretty cool tower in China.....Even has a waterfall!


It sounds like something out of sci-fi cityscape ─ a massive waterfall plunging 350-feet along the side of skyscraper ─ but in China it’s reality.

Residents of Guiyang thought something was wrong when they saw water cascading from the top of the Liebian building down to a public plaza in the city’s central business district.

And the bill is also supersized. The electricity needed to keep such a massive amount of water flowing costs about $118 per hour, according to The New York Post.


Because of that, the waterfall will only be turned on for special events for periods of 10 to 20 minutes, officials said.




http://www.foxnews.com/tech/2018/07...0-foot-waterfall-streaming-down-its-side.html
 
^
They tried that large exterior waterfall feature at a medical complex in Houston (not nearly as high though). It would rain water on people during windy periods and the sidewalks would always be soaked. Further, the lack of appropriate water treatment meant that it could also spread infection.
 
Status
Not open for further replies.


Back
Top