novatone82
Member
Does anyone know if the p street project ever brake ground?
Does anyone know if the p street project ever brake ground?
I was skimming through the city’s development tracker page the other day and noticed the Vanir development team has withdrawn their proposal for an office tower on 601 J street.
https://sacramento.civicinsight.com...amento/9126793/DR14-337-withdrawal letter.pdf
But, according to the letter, Vanir mentioned they are now focusing on a mixed-use project. It’s unclear whether they will propose a high-rise or mid-rise and number of stories.
All we know at this point is they have “changed their original design concept” and plan on submitting a new application with the city at a later time.
It wouldn’t surprise me to see a 5-8 story building there. We shall see.
I was skimming through the city’s development tracker page the other day and noticed the Vanir development team has withdrawn their proposal for an office tower on 601 J street.
https://sacramento.civicinsight.com...amento/9126793/DR14-337-withdrawal letter.pdf
But, according to the letter, Vanir mentioned they are now focusing on a mixed-use project. It’s unclear whether they will propose a high-rise or mid-rise and number of stories.
All we know at this point is they have “changed their original design concept” and plan on submitting a new application with the city at a later time.
It wouldn’t surprise me to see a 5-8 story building there. We shall see.
Sound the alarms... we have news on the Metropolitan site at 10th and J.
https://www.sacbee.com/news/local/article214774190.html
what round of proposals was this with? The Towers/Aura group?
OMG OMG OMG this is amazing!!!! The metropolitan might actually have a chance to get built or if not the site the metropolitan sits on will finally be redeveloped!
Sound the alarms... we have news on the Metropolitan site at 10th and J.
https://www.sacbee.com/news/local/article214774190.html
Anyone have predictions on what the proposed/revised development will be? # of stories? Obviously, 40 would be ideal... but can the market support it?
Sounds like it'll be a combination of a hotel and apartment/condo units.
Like snfenoc said before the demand certainly is there without a doubt, but I think it’s a question on if the demand is enough to justify 40 stories. I remember reading that hotel occupancy is around 80 percent in the region and with no major hotel developments coming up other than sutter, maybe the convention center hotel, and a bunch of Home2Suites the hotel option for the Metropolitan is certainly an option. Also, prices for hotels is up around 140 I think per night and the Metropolitan will boost that significantly because it will be an upscale hotel like the Sawyer.
If the plan doesn’t work out and the Metropolitan is pulled I think that the development team will make a scaled down version of the project like what Vanir is doing with their proposal. As for the size, idk but I think a viable range if the project is scaled down would be around 14 (Shorenstein’s upper proposal for 601 Capitol Mall) all the way up to 40, which is where the current proposal is.
Here are some just released details: https://twitter.com/NickMiller510/status/1017507499279171584
It's a joint venture project with Kolokotronis, Saca, and Grupe Company. Ground floor retail, 200 room hotel, and 250 apartment units.
That many units with that many hotel rooms could definitely require a 40-story building.