Within the next 10 years, we will build the North-South Taxiway (NST)—an above-grade taxiway where planes will taxi over Grant McConnachie Way and the Canada Line. On the horizon since our 2027 Master Plan, this resulted in constructing the Canada Line at ground level at Templeton and Sea Island stations. Building the NST provides a direct link between the runway ends and the terminal, enabling a more balanced use of the parallel runways and an airfield that is more efficient. It also means shorter taxiing distances for aircraft, thereby reducing GHG’s, cost and taxiing time for passengers and airlines.