Also found out...104th Ave would be entirely CLOSED during construction. KGB would be down to 1 lane each direction during construction.
From the City of Langley’s document.
Monday, March 7, 2018 @ 7:00pm
https://pub-langleycity.escribemeetings.com/filestream.ashx?DocumentId=5363
So they decided to throw SkyTrain out of the window. I’m losing my $&3t over this. :hell:
https://pub-langleycity.escribemeetings.com/filestream.ashx?DocumentId=5363* real time information is something TransLink is working on to have in place for the launch of the service or very soon after;
* the current objective is to work with municipalities through their municipal street furniture programs to have shelters at 100% of the stops along the B-Line network;
* custom branded shelters and off-board fare payment are longer term visions and are not currently part of the scope of this project;
Remember that the entire 98 B-Line infrastructure was demolished for the Canada Line.
My thinking is that if the B-Line down Fraser Hwy gets clogged up by all the diagonal intersections,
then there'll be a rethink on the at-grade LRT.
The NDP did not want this but they do not want to piss off the business community and developers..so they have committed funding. The community there is being run by developers...and they hold too much sway.
This is where the entire City needs to come out and protest this. This is potentially the last resort as the City are going to begin construction in Spring 2019.
Also found out...104th Ave would be entirely CLOSED during construction. KGB would be down to 1 lane each direction during construction.
There’s a large space on Fraser Hwy @ 160th where you can put a station there. It’s adjacent to the north of Fraser Hwy.The extent of closures - if it were SkyTrain- would depend on the allignment - centre of road or side of road.
Centre of road would have more impact, but one lane each way could probably be maintained, but centre of road makes for complex super tall statons like Brentwood.
Side of road is better, with smaller stations like Holdom.
Why is the NDP too coward to even say about this?
The NDP has decided to take the exact opposite approach and approve everything the mayors ask for, like they're in an Alpine Credits commercial. So we're once again getting the good (Broadway extension) along with the bad (Surrey LRT).
So Langley is fucked then. It’ll never have a chance to get SkyTrain.
The NDP did not want this but they do not want to piss off the business community and developers..so they have committed funding. The community there is being run by developers...and they hold too much sway.
This is where the entire City needs to come out and protest this. This is potentially the last resort as the City are going to begin construction in Spring 2019.
Also found out...104th Ave would be entirely CLOSED during construction. KGB would be down to 1 lane each direction during construction.
For those of you not on reddit Vancouver there's a healthy thread about the LRT. There have been many in the past as well.
https://www.reddit.com/r/vancouver/comments/85vb7k/so_why_is_surrey_going_with_lrt/
For those of you not on reddit Vancouver there's a healthy thread about the LRT. There have been many in the past as well.
https://www.reddit.com/r/vancouver/comments/85vb7k/so_why_is_surrey_going_with_lrt/
So what's the deal with that tunnel anyway? From the video it looks like cars drive down the paved ramp and then get stuck when the pavement ends and there's nothing but rails.More foreshadowing coming to Surrey LRT. According to video 25 incidents in the past 2 years.https://www.youtube.com/watch?v=RyPpYvMkR_I
So what's the deal with that tunnel anyway? From the video it looks like cars drive down the paved ramp and then get stuck when the pavement ends and there's nothing but rails.
If that's the case, then why is the ramp paved? They could make it a lot harder for people to screw up by removing the pavement on the approach and the ramp so that people simply couldn't drive down it.