Already seeing this on Reddit. "Of course I'm not voting for this. I can't use public transit to do everything I need to do."
I had to quit going to that subreddit for the preservation of my own sanity.
Already seeing this on Reddit. "Of course I'm not voting for this. I can't use public transit to do everything I need to do."
I had to quit going to that subreddit for the preservation of my own sanity.
Apparently the whole system plan has _2_ lines south of the river, even though the majority of Austin lives North.
So yeah, quit your complaining![]()
2 lines is great but we need to know these will be built sooner rather than later.
Doesn't matter which side has the greater population, it's a matter of treating the southside equally. At least make sure what we vote for will actually benefit us from it sooner rather than later which is why I think they should add South Congress in conjunction with Guadalupe/N. Lamar.
I fully expect that it will be seen as political necessity to package at least 1 south line with a north line in a vote. It may be Riverside rather than Congress(like in 2014), given the recent and future redevelopments there. Also because it's seen (as some) as a way to the airport (even though that shouldn't matter).
And those added votes hopefully will be more than the votes it loses from increased costs.
I think they were all separate mobility investments. I think the S. 1st bridge and Cesar transit lanes are great ideas but it's going to get a lot of hate from motorists. I really think the city should invest in at least 1 more crossing at the river or expand the capacity of Pleasant Valley.These are separate "Enhancement" projects that are independent of the light rail plans?
If so, that's very important. As much as I would love to have that system, I think it's DOA.
The Riverside line has to cross I-35 which is a huge problem because of TxDot. The reconstruction of the Riverside overpass was suppose to begin in 2018-2019 but it's now on hiatus along with the rest of 35 in the Austin area. Unless things clear up real quick, real soon Cap Metro can't put a riverside LRT on their implementation plan because they have no way of knowing when the overpass will be rebuilt. It's not just a case of money either. It's also design.
You mean 35 through the DT area I take it. Cause construction has begun in ernest south of Riverside through Slaughter with new bridges and adding an extra lane to each side at least in segments.
^Haha, classic Novacek, I agree and even wonder if there is a point further south to spur off since Burnet is getting denser.
(reply moved from Domain thread)
The previous map they showed had the rest of Burnet listed as "long term Tier 1".
https://pbs.twimg.com/media/DMYcZHZUMAAUAb7.jpg
cutting across on 45th(?).
Along with Airport, Oltorf(?), Pleasant Valley.
I'm assuming/hoping that the exclusion of all of those from this map just means they'd be on a longer timeline.
Further south, it seems like the only potential options (besides Anderson) are there at 45th or 2222 (north Austin lacks good E/W connectivity). At 45th, it is really more of a second line than a spur. 2222 has some similar issues as 183. Its not an IA corridor. It has a more constrained RoW than Anderson. You'd also have to convince TxDot to give up lanes of technically a state highway.
I can see why they want the transfer point between the Lamar Line and domain spur to be the North Lamar Transit Center north of 183. You're talking about an actual lot to use as oppose to just an easement on the side of the road. Lot of room for bus and train idling. That likely maximizes the number of people that can quickly get to where they are to where they want to go with a few transfers as possible.
I assure you that the Riverside overpass was taken off the 10 year schedule and is in current hiatus.
What transfer point?
It's a spur, not a separate line. You don't have riders board at Payton Gin, ride for a stop, and then transfer to another train at the NLTC. You have riders board at PG (or the Domain) and have a one seat ride all the way to downtown.
Under connections 2025 (and even before) they've continually been de-emphasising NLTC in favor of crestview. Cx2025 had a single non-Lamar route (323) stop there. They slid back slightly for June 2018 (now there's still the 383 as well). But that one almost certainly wouldn't exist anymore with light rail.
The NLTC is kind of in an awkward spot. It's too far into the city, and too far away from the major N/S highways. Yet it's so far out that once parking there you still have a long transit ride in. It's almost too close to 183 (either driving in or driving out is probably going to be an awkward U turn). The highway and depressed Lamar (which is highway-like in that section) cuts off good pedestrian access from almost 270 degrees. Any central-core buses need to cross over 183 (twice) to connect there. Etc.
It probably was a good location years ago, when that was out in the boonies. But nowadays I'd be surprised if a new P+R was proposed there, if CM didn't already have the land.
The city posted some more details about cost estimates for the corridor work.
http://austintexas.gov/sites/defaul...ckagedescriptions_Recommendations20180216.pdf
It's not as fine grained as I was hoping for (how much does this intersection that was selected cost, vs. that intersection that wasn't selected). But it's something to read and discuss.
The estimate for Guadalupe seems really off to me. They estimate that the transit lanes for Guadalupe were going to cost $45M. Or 45M /mile. That's in addition to $20M for all the stuff on Nueces that was selected.
While CapMetro claims they can do _elevated_ Gold Class true-BRT for $50M /mile.
Someone is massively off.
Edit: Different compare. That's what, twice as expensive per mile as the Mopac toll lane, which added lanes and sound walls.
They are proposing a complete rebuild/repave of the entire corridor ROW along with designating transit lanes which is where the cost comes from. COA has a lot of similar projects like Brozos St. downtown to draw cost comparisons to.
I know, it's intentionally not apples to apples. I'm stating that even with a much more complicated project, Mopac cost less (per mile).Comparing to Mopac is not really apples to apples.
Again, I specifically pointed to the _elevated_ option. Which represents massively more work (and what should be more $) than repaving a corridor.We really don't know much about the Cap Metro plan to know what we are getting with that cost estimate. The 2014 light rail plan included money to redevelop/rebuild Riverside but maybe the new Guad/Lamar plan is down and dirty costs of installing tracks without re-working corridors other than what is necessary to keep existing lanes.
I guarantee you they didn't spend $45M /mile on Brazos street.
A complete corridor rebuild shouldn't cost $45M /mile. It doesn't cost that much for a brand new corridor.
I know, it's intentionally not apples to apples. I'm stating that even with a much more complicated project, Mopac cost less (per mile).
Another non-apples comparison, building TX 130 (including RoW costs) was only $30M /mile.
Again, I specifically pointed to the _elevated_ option. Which represents massively more work (and what should be more $) than repaving a corridor.