I've updated my map of the MOOSE system.
Nicely done. Just one observation. The Phase 2 LRT now will extend to Moodie in the west.
I've updated my map of the MOOSE system.
Nicely done. Just one observation. The Phase 2 LRT now will extend to Moodie in the west.
@OCCheetos
How difficult would it be to add a circle around each station with an 800m radius. That is the area that MOOSE is considering as development land. I think in some cases that would encompass an entire town (like Maxville or Casselman) while in others it would be isolated from everything else (like where you've put Navan at the moment).
I realize that the stations can move around a bit, but this would just give a sense of the scale of what the PPR model would look like.
I notice that the small inset map, bottom right of the network map on your website, has the Confederation Line LRT included on it, but for some reason the Trillium Line has been omitted. Is there a reason why you would choose to show one line and not the other?
@OCCheetos
How difficult would it be to add a circle around each station with an 800m radius. That is the area that MOOSE is considering as development land. I think in some cases that would encompass an entire town (like Maxville or Casselman) while in others it would be isolated from everything else (like where you've put Navan at the moment).
I realize that the stations can move around a bit, but this would just give a sense of the scale of what the PPR model would look like.
acottawa said:I would doubt the stations would be in towns. The announced site at Morrison's Quarry seems to be the model. Existing towns would be pretty limiting in terms of development opportunity.
I believe Morrison's Quarry corresponds to the Farm Point station on the map. There would be another station further towards Wakefield. A lot of the station names correspond to street names, so I'd guess that they'd be built perpendicular to the road and would be kind of like the Milliken GO Station in Toronto. (At least for the stops in Gatineau and western Ottawa)
There may be a station near Wakefield, but it would be pretty silly to put these in existing towns. You would only get money from those who voluntarily sign up to provide money (and statscan says there are only 55 commuters from La Pêche in Ottawa) and the densities are very low. Moose needs to pack as many people into subdivsions near stations as possible.
(and statscan says there are only 55 commuters from La Pêche in Ottawa) .
I notice that the small inset map, bottom right of the network map on your website, has the Confederation Line LRT included on it, but for some reason the Trillium Line has been omitted. Is there a reason why you would choose to show one line and not the other?
Now it has the Confederation Line and Trillium Line (as well as their extensions), the rough locations of where each MOOSE station would be, as well as some other extra info (other abandoned railway corridors, as well as a visual representation of what the Pembroke commuter line would have looked like).
Some things I noticed after looking closely at the map:
Navan isn't situated along the rail corridor, and Quyon is nowhere near the rail corridor. I'm also a bit surprised that Carp and Dunrobin don't have stops planned.
You're right about that. I've corrected it on the map.One mistake you have. Joseph has pretty much admitted that Barrhaven station would be located near McKenna Casey Dr, not at the current Fallowfield station (that is why they use the name Barrhaven not Fallowfield).
You have also added stations that will no longer exist under Moose control, like Walkley, Mooney's Bay, Carling and Gladstone.
Do you have a source for that other than MOOSE's outdated and inaccurate map?
Moose would need pretty much 100% use of OC Transpo, so I am not clear why there would be a discount.
You're looking at the wrong table there. There are 55 people in Ottawa who work in La Peche. Going the other way around there are about 1000 people in La Peche who work in Ottawa and another 1000 from La Peche who work in Gatineau.
To be fair, since Moose want to take over operation of the Trillium Line north of Greensboro, there would be some quid pro quo as OC Transpo customers would be able to use Moose at least between Greensboro and Bayview.
If they are going to make all of those stops (and considering many of these routes are going to be well over an hour they might not want to make a lot of stops). Still, that is maybe 5% of employment in Ottawa? Other destinations (including downtown) would require a transfer. In contrast, STO and the rural partner routes serve downtown directly so a significant number require no transfers at all.
I'm not quite sure what you are trying to say. What I was saying is Carleton Students would be able to transfer from OC Transpo to Moose at Bayview or Greensboro. Similarly, people living along the Stage 2 South extension would be able to transfer from the Trillium Line to Moose at Greensboro to get to Bayview. I don't think OC Transpo riders can transfer to the rural bus lines without a fee though.
OTOH, OC Transpo would have to re-instate bus service to serve the other stations that Moose would be abandoning.
(Other than a north to south bus service?)
I'm not quite sure what you are trying to say. What I was saying is Carleton Students would be able to transfer from OC Transpo to Moose at Bayview or Greensboro. Similarly, people living along the Stage 2 South extension would be able to transfer from the Trillium Line to Moose at Greensboro to get to Bayview. I don't think OC Transpo riders can transfer to the rural bus lines without a fee though.
OTOH, OC Transpo would have to re-instate bus service to serve the other stations that Moose would be abandoning.