New Central Library | Construction


So final beam is in place:

34234665140_4b632cbde0_h.jpg


33810605133_a3e46a894e_b.jpg


34579070106_cf4b2e3b77_b.jpg


34458651012_915bcd851a_b.jpg


34458650252_6f3e70c8f5_b.jpg


34579069876_c89b4b5f66_b.jpg


34490048101_973b952160_b.jpg


34234653550_dc20d43b3d_b.jpg
 
The last beam can be seen in my photo as well as Da_Master's photo, unfortunately they had it placed on the street upside down so now everyones messages are upside down.

34057401013_3d5453dc89_b.jpg
 
unfortunately they had it placed on the street upside down so now everyones messages are upside down.

Well, knowing Calgary's construction track record, we should be happy that they at least measured correctly this time and it didn't need to go back to manufacturing. Is that bend part-way by design, or is that something they did on-site to make it fit?

Library is looking amazing, and the inside space that they recently tweeted a scaffolding-free image of looks fabulous.
 
Last edited:
Pictures were taken Monday afternoon, so almost a week old but there hasn't been any updates since so might as well update this thread :).

34819429912_c0fa6b36da_b.jpg


34172032423_fc4001f30a_b.jpg


34819430152_d80f300fc4_h.jpg


34850234451_0dd390d280_b.jpg


34595257870_e19282c5dc_b.jpg


34595045030_30b1903f61_b.jpg


34850017731_4d5f9cfd2c_b.jpg


34139734504_3ff7b9ba65_b.jpg
 
That looks awesome. Does anyone know is this steam bent? Is that just a rack, or is it being fabircated/bent on site?

Also, is the curve uniform, or do they have to bend each piece custom ad-hoc?

A+
 
hopefully they fix the gaps there...

I find that leading international architects from overseas often overestimate the capabilities of our local trades. Was the case with the Bow, the Peace Bridge, and seemingly now this Snøhetta designed library.

I'm certain this will get worked out, but it will undoubtedly require more hours than planned, and possibly a plea for more dollars from the construction folks.
 
I find that leading international architects from overseas often overestimate the capabilities of our local trades. Was the case with the Bow, the Peace Bridge, and seemingly now this Snøhetta designed library.

I'm certain this will get worked out, but it will undoubtedly require more hours than planned, and possibly a plea for more dollars from the construction folks.


There you go again talking about sh*t that isn't correct because you have a hate-on for local trades. For the Peace Bridge it was the Spanish welders that did sub-par work not local ones. Look it up.
 
Thanks for the correct. Yes, I do recall that now.

Who is doing the work on the library sofits?

I'm not up on that but I will tell you that the raised floor that is going into this building is one of the more complicated jobs for that sort of thing. The good thing is they picked a superior product....not like Telus Sky who picked a generic raised floor out of China that they are going to have many issues with.
 
Would you give it up already. Local tradespeople aren't perfect and can make mistakes, but this is the case every where else. Even in highly controlled professions like lawyers, doctors or pilots, mistakes get made. Also construction folks make mistakes in other cities, it has nothing to do with the the so called construction mafia.

I find that leading international architects from overseas often overestimate the capabilities of our local trades. Was the case with the Bow, the Peace Bridge, and seemingly now this Snøhetta designed library.

I'm certain this will get worked out, but it will undoubtedly require more hours than planned, and possibly a plea for more dollars from the construction folks.
 


Back
Top