PHILADELPHIA | W Hotel & Element by Westin | 617 FT | 51 FLOORS


I have a question about the basement levels of the W Hotel project.

How do they accommodate parking?

I read that the site will feature underground parking, but I did not see the usual ramps for automobiles go in, nor did I see something like a single elevator shaft built to reach the multiple underground levels that have gone in at the site.

I am sure I just don't understand the design, or didn't see what is plainly present in it. But can someone explain what I am missing here?

Thanks.

There has been a ramp under construction coming in from 15th. St. but this is not suppose to be a 'self park' garage, so the parking will be by valet. So they will be sticking cars in whatever corner they can find. It might be hard to pin point unless you are looking for it, but you can sortof make out the ramp in past photos.
 
I have a question about the basement levels of the W Hotel project.

How do they accommodate parking?

I read that the site will feature underground parking, but I did not see the usual ramps for automobiles go in, nor did I see something like a single elevator shaft built to reach the multiple underground levels that have gone in at the site.

I am sure I just don't understand the design, or didn't see what is plainly present in it. But can someone explain what I am missing here?

Thanks.

Here it is.
 
Nov 22nd:
PmriPoF.jpg


Nov 29th:
EvdqDbf.jpg
 
There has been a ramp under construction coming in from 15th. St. but this is not suppose to be a 'self park' garage, so the parking will be by valet. So they will be sticking cars in whatever corner they can find.

That's unfortunate.
I personally prefer self-parking garages.

Better hope you don't find a dent on your vehicle because they won't pay for it. :hell:
 
I'd rather work in 0° weather than get rained on.

Been working outside since 1994

Agreed, in college I worked for a company that did residential and small commercial window cleaning jobs. Rain chills you to the bone and complicates every aspect of the job, with cold you just had to do was layer up and add alcohol to the soap so it wouldn't freeze.
 
i walked by there yesterday and it was crazy to finally see construction above grade. Been a long time coming.
 
Agreed, in college I worked for a company that did residential and small commercial window cleaning jobs. Rain chills you to the bone and complicates every aspect of the job, with cold you just had to do was layer up and add alcohol to the soap so it wouldn't freeze.

But wherever could you store alcohol on a job site? A hollowed out hand broom?
 