Just a block away the water table only allowed a one story parking garage.
2 levels, 228 stalls.
Tower 1
![]()
http://www.truenorthsquare.com/development/floor-plans-availability/
-2 Level Underground Parkade:
-3 floors of Podium all leased.
-1 Level above podium leased
-Floors 13-17 leased.
^ Yeah we'll see what the TNS parkade looks like.
Photo from the construction cam this morning. Non changing photo. I will assume the wooden frame will be lowered into the hole as forms for a crane base. That hole is quite deep.
![]()
Just a block away the water table only allowed a one story parking garage. That hole is deep enough for a four level parking garage.
go one block south and the Delta Hotel complex has a multi level underground parking lot. And the underground at Portage Place is two levels if I am not mistaken.
Not sure why the Hydro Building was not able to do at least the same as those two other buildings.
go one block south and the Delta Hotel complex has a multi level underground parking lot. And the underground at Portage Place is two levels if I am not mistaken.
Not sure why the Hydro Building was not able to do at least the same as those two other buildings.
^ Yeah we'll see what the TNS parkade looks like.
Photo from the construction cam this morning. Non changing photo. I will assume the wooden frame will be lowered into the hole as forms for a crane base. That hole is quite deep.
![]()
I recall reading somewhere that part of the rational for only putting in one parkade level had something to do with the Leed Platinum Certification that Manitoba Hydro Place was chasing.
If two levels were put it, it likely would have been manageable; however more dewatering of sumps in the parkade would be required. Thus increasing the energy use of the building.