PHILADELPHIA | Highrise Development Thread IX


I don't know what's going on with SLS. There could be a lot of case-specific reasons for the delay or abandonment (if they pull out). But the luxury condo and townhouse market seems pretty healthy here as a whole. By all accounts, One Riverside is selling well. I believe it was almost half sold back as of January.

One Riverside is racing toward completion...literally...so I'm hoping that maybe Dranoff is just managing cash. Maybe he's waiting to get to the settlement phase of One Riverside to free up some capital (and to decrease his leverage) before moving forward with SLS.

If that's the case, we'll probably have to wait what, 9 months to a year?
 
Again, please cite any prior post stating this is a simple problem with an easy fix.

it permeates every post and every comment you make. I'm not citing anything specifically. You know exactly what I'm talking about. Every issue you bring up is only not solved because those in power aren't as clever as you are- you have solved everything with a few keystrokes.
 
One Riverside is racing toward completion...literally...so I'm hoping that maybe Dranoff is just managing cash. Maybe he's waiting to get to the settlement phase of One Riverside to free up some capital (and to decrease his leverage) before moving forward with SLS. The lender wouldn't allow it.

If that's the case, we'll probably have to wait what, 9 months to a year?

The chances these projects being cross collateralized is very low to zero because one riverside is condos. As he sells them he has no longer a standing ownership in the building hence it can't be used as collateral for the next project. This more or less proves that the financials of one riverside has nothing to do with SLS.

You could make the argument as he sells more units in ORS he returns cash back to his investors and they turn around again and give it to him for SLS. This is a possibility, but I doubt that's the case. If you are investing in ORS, chances are you are big enough accredited investor to invest in both projects simultaneously, so the lack of equity financing for SLS probably has nothing to do with small guys that need their money back from project 1 so it can go to project 2.

Furthermore the leverage has nothing to do with it. If anything he needs MORE leverage. Standard LTV on a construction loan is 55%. The remaining 45% equity is being made up of $6M from the state, whatever dranoff is personally putting in, plus his investors (His investors are probably the bulk, by far). I don't know what the cost of the project is so I can't break down the capital stack - but if I had to take a guess Dranoff is probably somewhere around 10% of the equity (total shot in dark - but not to be confused with 10% of the project). The problem is he can't close his construction loan until all the equity is upfront. When you develop the equity burns down first, then the debt financing starts, as you complete construction and prove to the bank you've hit certain hurdles (construction, sales/leasing, etc.) the bank continues to future fund the project.

Total Project $100m

Cash (needed upfront) $45m
Debt (upfront $20m & future funding $35m)
Future Funding Hurdle 1 - Bank releases $10M
Future Funding Hurdle 2 - Bank releases $10M
etc.

As I mentioned before, again lol, the project is probably stalled because he needs to raise MORE equity. The fact that it's taking this long is disconcerting - it means he's having trouble either "selling the dream", or the projected returns aren't good when compared to similar risk investments. Which is it? I have no idea. He could have an investor writing him a check at this very moment, we will never know. From what I've heard - it's been very very slow. But who really knows, he could be raising the final cash as I type this.
 
Last edited:
There is a trash policy and currently businesses are responsible for contracting out the disposal of their refuse if it exceeds a certain amount. There are regulations on dumpsters and a host of other things. What you mean to say is that the city government does not control or manage how businesses go about taking care of their trash needs. That isn't the same thing. The article clearly lays out why changing this throughout center city would be a very complex and contentious undertaking. The POV that was presented during the earlier conversation was "this is a simple problem that other cities solved long ago and it's only not solved here because Philadelphians and their politicians are idiots who don't give a shit and lack the intelligence of their counterparts in every other city".

I don't think this is an easy fix, I just think that Streets should be taking a much more proactive role to improve pedestrian conditions (not just related to dumpsters of course). You mentioned regulations so I went and looked up the dumpster regulation (section 10-722) in the city code. It does allow dumpsters in the public right of ways but there is a licensing and medallion system (each dumpster is supposed to have a medallion attached that transmits UHF information to the streets dept), that provides that the streets department will deny a license for any dumpster that unduly interferes with the public right of way. Many of the dumpsters on Sansom and our more heavily trafficed "alleys" clearly interfere with public rights of way (if they leave less than 3 feet of sidewalk space left they are not in compliance with the ADA), so clearly Streets isn't doing there job in licensing dumpsters.
 
Penn Medicine South Tower exterior is complete

Rising 19 floors and 302 FT tall. The project thread will be moved to the Completed Projects Archives shortly.

Here are some photos:

13434875_1298391326855015_7248405514409779946_n.jpg


13432358_1298391146855033_3050240371999578190_n.jpg


Visit the project thread here for more:
http://forum.skyscraperpage.com/showthread.php?t=207136&page=10&highlight=Philadelphia
 
35 years.. What a vision. I am going to be so old by then, I actually feel a little melancholy about the prospect of not being alive to see it finished. I see Cira 2 is on the back burner now and the market will dictate what will go there. If I ever get the big breakthrough I want to and make billions, I will build Torre De Cristal's twin.
 
35 years.. What a vision. I am going to be so old by then, I actually feel a little melancholy about the prospect of not being alive to see it finished. I see Cira 2 is on the back burner now and the market will dictate what will go there. If I ever get the big breakthrough I want to and make billions, I will build Torre De Cristal's twin.

Schuylkill Yards development is the primary one now. 30th Plan will be developed after most of Schuylkill yards projects are done.
 
I don't think this is an easy fix, I just think that Streets should be taking a much more proactive role to improve pedestrian conditions (not just related to dumpsters of course). You mentioned regulations so I went and looked up the dumpster regulation (section 10-722) in the city code. It does allow dumpsters in the public right of ways but there is a licensing and medallion system (each dumpster is supposed to have a medallion attached that transmits UHF information to the streets dept), that provides that the streets department will deny a license for any dumpster that unduly interferes with the public right of way. Many of the dumpsters on Sansom and our more heavily trafficed "alleys" clearly interfere with public rights of way (if they leave less than 3 feet of sidewalk space left they are not in compliance with the ADA), so clearly Streets isn't doing there job in licensing dumpsters.

there are many things in old cities that aren't in compliance with ADA. IN many cases a building, station or sidewalk ramp isn't in compliance until a major modification or upgrade is done. The majority of our subway and rail stations aren't ADA compliant.
 
What's very impressive about this, is this is $12MM just for a shell. The condo is not completed. The person will certainly spend another couple million building out the condo.

And $17.6 million is the record holder in Philadelphia right now.

Which condo is that? They have not closed on the 500 walnut condo. Was there something in 1706 Rittenhouse that sold for that amount?

Edit- per the philly.com article the most expensive condo SALE to date was $12.5M for penthouse at 1706. So the RARC unit is right behind that, but considering its not finished it's more impressive in reality.
 
This plan is amazing. If all of this comes to fruition, West Philly will be home to two Supertall towers. That tower next to 30th St Station/Cira is definitely 1,200 FT tall. If you look closely, there is a nice pretty tower sitting on the Cira II plot which looks to be about 700 FT tall.
 
Which condo is that? They have not closed on the 500 walnut condo. Was there something in 1706 Rittenhouse that sold for that amount?

Alright, if you're not technically considering it a done deal yet, but it has been
"sold" to a buyer.

I think the "technical" most expensive condo sale is still $12.5MM for one of the condos in 1706 Ritt.
 