I don't understand the point you're trying to make here. What other Skytrain station could the SFU buses stop at that isn't on the Millennium line? The other obvious candidate, Lougheed, is also a Millennium line station.

People who are already going to take Skytrain (from the west and South) were already going to take Skytrain.

What I was talking about are the people from the North East, who in 2002 (and still today) take a bus to Lougheed.

Before 2002, they would bus to the Lougheed transfer (at that time in the mall parking lot) and transfer to the bus to SFU.

When Millennium line opens, if they left the terminus of the 145 at Lougheed then everyone arriving by bus at Lougheed, would then take the 145 to SFU. By moving the bus to Production Way, you force all the people who are arriving at Lougheed (the major transfer point for people on buses) now have to ride the Skytrain 1 station to get to SFU.

There's something that irks me about this idea... Like, I can see why this would make sense, but I feel like we can't be sure about the legitimacy of this.

If coming from Coquitlam/east and going to SFU, then why even go through Lougheed... People coming from east on local bus routes on weekdays could take the direct 143 or transfer to it.

I understand that public opinion on the Millennium Line was pretty tough and that if there was a transfer at Lougheed, there'd be a transfer advantage. But when you think about it, practically, there's something that does make sense about having the terminus at Production Way: It's literally at the foot of Gaglardi. Meaning terminating the 145 there is shorter, more efficient, and cuts back on service hours. In a region with a limited fleet of articulated buses needed for ever-growing routes like the 99 and (at the time) 98, I think this was actually really important at the time. It would've been only a few buses but those would've made a difference somewhere else.

At the same time, with the introduction of the 97 B-Line to Lougheed Exch, it's totally understandable that they'd want to keep the 145 terminus out of there, because in the long term it could be a serious constrain on the capacity of the Lougheed bus exchange. I mean, just consider how popular the 145 is today. Where are you going to store for lay-over all of the numerous 60-ft articulated buses that today run at frequencies in excess of 3 minutes during peak hours? You'd have needed to expand the bus exchange there and raise costs. You'd also need to expand the surrounding roadways to account for all of the extra buses and effect on traffic (consider the impact of 60-ft buses turning every 3 minutes or less from Lougheed EB to Austin).

The SkyTrain may be a slight inconvenience and an excuse to boost boarding numbers assuming there are indeed many people going just the one stop (and I really don't think so), but I honestly do find the design to be very practical. And, now that we know the Expo Line can extend that one station over, therefore solving these concerns on the transfer, I think it's safe to say we can close this debate for good.

I think you need to put yourself in the world of pre 2002. That might be difficult for some young whippersnappers.

A lot of the bus routes might make sense today, but at the time they were clearly an attempt to force some transfers to take place short distances over Skytrain instead of at a large centralized bus exchange.

I lived in Coquitlam during the opening of the Millennium line, and it was a radically different place. Late nights coming back from class and I would frequently be the only person on an entire train.

But you would go through Lougheed and not take the 143 because that is where most of the buses would take you. To take the 143 you have to either go through the Coquitlam exchange or cross Como Lake ave; not that many buses did that.

A much larger portion of Coquitlams population lived South of Como Lake Ave at the time, so at first many of the bus routes from the tri-cities went south towards New Westminster's Skytrain. Then, when the 99B line opened to the Lougheed mall, a lot of local bus routes were diverted to Lougheed (or had their routes on the way to/from New West slightly altered) to meet the terminus of the B Line. It was popular enough that it encouraged the Millennium line.

To get to the 143, you would like have to take different, much less frequent buses, to meet up with the infrequent 143 (and I'm not entirely sure how old the route is). So it was easier to go to Lougheed (it is where the buses started going) and the frequency of the bus to SFU from Lougheed was better.

When the Millennium line opened, they changed a lot. Many of the buses that went through to New West were re-routed to terminate at Lougheed, and a few at Braid. Even then, re-routing to Braid was another attempt to boost ridership on the Millennium line, because if you wanted to transfer from a bus to a bus, you would most likely have to take the Skytrain a stop.

As for logistics, the distance from Production Way to Lougheed isn't that much. You are talking about 3 extra minutes. You would not need many, if any really, extra buses. Especially in 2002. Transit just wasn't that busy, even to SFU (the UPass program didn't start until a year after opening). The 145 didn't use articulated buses for quite some time. Same with Braid, it's only a 4 minute difference. And there is something to be said about having a more focused transit exchange. The Exchange works well in Surrey, Bridgeport, and Metrotown. The more buses that use one exchange, the easier transfers are, encouraging more use.

If you wanted to simplify the network and operation and terminate the Expo line at Lougheed, you could ease the backlash of an extra transfer by extending the 145 to Lougheed. Without the 97 B line, there is plenty of room. The bus ride would take an extra 3 or 4 minutes, which would equal the extra time taken to make an Expo to Millennium line transfer. So passengers would have a negligible net increase (maybe even a decrease) of their total trip.

I actually don't think making students transfer at Lougheed to the Millennium line is a big deal. But some do, and if they would rather spend some extra time on a bus than spend that time making an extra transfer, there's not much harm in it. But I think that's a better option than having a confusing extra station on the Expo line.
 
I used to ride the 99 down Lougheed during rush hour in the 90s. You could still get a seat.

I wasn't commuting from there by the time the M-Line opened, but when I did ride it, mostly off peak, I would also be the only person on the train car sometimes. It's really unreal to think about today.

Even on weekends it would pull into a station and maybe one person would get on or off.

This history ads to my frustration when people question the need for a train to UBC, or extensions in Surrey.
 
Ah, of course - thanks for clarifying.

Yeah, it would be like if all the buses east to Guildford only stopped at Surrey City Center, and all the buses south to Newton only stopped at King George. If you wanted to do an in Surrey trip of Newton to Guildford, you would have to take the Skytrain 1 station. (assuming there is no 96b line, which there wasn't for most of recorded history). Instead all the buses do meet up at City Center to facilitate as many transfers as possible.

When the Millennium line opened, it wasn't a huge amount of people making that bus-bus connection (via Braid-Lougheed-Production Way), but it would be enough to pump the tires of Skytrain ridership in those early days.

I used to ride the 99 down Lougheed during rush hour in the 90s. You could still get a seat.

I wasn't commuting from there by the time the M-Line opened, but when I did ride it, mostly off peak, I would also be the only person on the train car sometimes. It's really unreal to think about today.

Even on weekends it would pull into a station and maybe one person would get on or off.

This history ads to my frustration when people question the need for a train to UBC, or extensions in Surrey.

Yeah, I think if you have vision, money, and patients building Skytrain is worth it in the long run (eventually ridership increases). But frequently one, or all, of those things is in short supply.

But it was insane how (for quite a while too) the Millennium line would be dead off peak. I regularly rode the Millennium line from opening day through 2007, and it is mind boggling how much it has changed. If it wasn't for the fact that when it opened I was a student originally from a small town (and mother F'n loved trains and the big city feel of Skytrain) I would be pretty P.O.'d at where the NDP spent my tax dollars.

I remember waiting for trains to come at Lougheed for least 10 minutes, then a single MKII train would show up and there would be no problems finding a seat.

With regards to SFU, I remember how the 145 didn't even have a bus loop at the beginning. The buses just stopped on Lougheed Highway and the students would line up along the sidewalk. And the buses would just layover in the right turn lane on Lougheed. Then they built the bus loop, then promptly closed it to put that building overtop of it (sending the students back to loading on Lougheed). Even today the buses unload and layover in the right turn/bus lane on Lougheed (which isn't the greatest experience if you are in a wheelchair).
 

It still looks the same as when I visited the area 2 month ago. I think they were putting the finishing touches on the station interior at the time and now they look pretty much done inside. I guess the landscaping around the entrance is the city's job, and now that there is no rush they are dragging their feet?

I take it the landscaping around the guideway to the south was EGRT's or the Mall's responsibility, because it's been done for months.

MsnT2U7.jpg

(Source 2 months ago; me)

Xyrkq5Y.jpg

(Source 2 months ago; me)
 
It still looks the same as when I visited the area 2 month ago. I think they were putting the finishing touches on the station interior at the time and now they look pretty much done inside. I guess the landscaping around the entrance is the city's job, and now that there is no rush they are dragging their feet?

I take it the landscaping around the guideway to the south was EGRT's or the Mall's responsibility, because it's been done for months.

It looks like the landscaping is going to be done as part of the city's Pinetree Way enhancement project.
 
I think the streetscape landscaping was by the City, so proceeded on a different (faster) schedule.

.... I guess the landscaping around the entrance is the city's job, and now that there is no rush they are dragging their feet?

There was an announcement the other day about the awarding of contracts for the "station plazas".
Could be that they wanted to maintain equipment access to all the stations then award the finishing landscaping touches?

http://www.evergreenline.gov.bc.ca/documents/NewsReleases/2016TRAN0076-000635.pdf

http://www.evergreenline.gov.bc.ca/plaza.htm
 
There was an announcement the other day about the awarding of contracts for the "station plazas".

Sorry, double post.

But shouldn't this have been decided months ago? They seem to be cutting it close.

In my experience of trying to get contractors to do renos: if you wait to find someone at the last minute, you won't. Heck, I'm getting a guy to come by to put a screen door on my patio, and the earliest I could find someone is for next month.

On the Evergreen website, they mention construction has started and timelines for Burquitlam, Moody, and Inlet; that construction on plazas has started and will be done by July and August, which would have been in time for the original opening date, so being built on the original schedule. But nothing for Coquitlam, Lincoln and Douglas.

I'm sure they'll get it done in time for 2017, but it would have been nice for the area if this work were done in time for the summer (which it should have been on the original schedule). Maybe I'm mistaken and there actually isn't that much work to do and they can bang it out in a month or two.
 
Yeah, I guess. But they haven't really been doing heavy construction since they started testing trains in early March. And up to that point they seem to have gotten a lot of work done on Pinetree south of Lincoln. I just thought more would be done in the 2 months since I was last there. You know, try and finish things up ASAP for the pedestrians in the area (regardless of if the line was opening on time or not).

EDIT: After reading the Coquitlam city's page on the Pinetree way project, it does say Timeline: Spring 2015-spring 2016: Construction | June 2016: Opening day

So I think they are going to miss that?
 
I would imagine that when the tunnel officially pushed completion to early 2017 that pushed the streetscaping later for a completion date to deffer costs. Finite budgets and spreading costs over two fiscal years can make pushing these finale details later make sense. Don't know if that's the case here or not.
 
Yeah, but it feels like the rate at which the City has been working on it has slowed down recently.

They managed to finish up the Anson Ave intersection and the roads and parking lots in the mall, months ago. Not much has changed since then.

The mall parking lots were finished with such speed because the mall put a strict condition that construction in their parking lot had to be completed before the Christmas shopping season (Novemberish 2015)
 
I would imagine that when the tunnel officially pushed completion to early 2017 that pushed the streetscaping later for a completion date to deffer costs. Finite budgets and spreading costs over two fiscal years can make pushing these finale details later make sense. Don't know if that's the case here or not.

It might make sense on a financial spreadsheet, but not if there are penalties. If they are delaying work, it just affects schedules on other work. Usually a public works department has a very tight (and long) schedule. So by pushing this work back, you will be pushing other jobs back too. And you can't just move around work in other parts of the city because then you need to send out new notices to residents about road closures and noise impacts.

If they had hired a third party to help, that 3rd party would be pretty upset that the job they were going to be paid to do isn't being done and could have secured other contracts in the time being.

The mall parking lots were finished with such speed because the mall put a strict condition that construction in their parking lot had to be completed before the Christmas shopping season (Novemberish 2015)

Shouldn't the residents in the area get the same courtesy from their city? When I was last there it wasn't a pleasant experience to walk around the area. I can't imagine if that was my daily routine for months.

The Coquitlam website says the work is supposed to be done in June. Is it going to be? I'm not trying to sound like I'm freaking out, just surprised by the lack of progress on this. I'm just curious if anyone in the area more frequently has notice any progress on the city's work.
 
I used to ride the 99 down Lougheed during rush hour in the 90s. You could still get a seat.

I wasn't commuting from there by the time the M-Line opened, but when I did ride it, mostly off peak, I would also be the only person on the train car sometimes. It's really unreal to think about today.

Even on weekends it would pull into a station and maybe one person would get on or off.

This history ads to my frustration when people question the need for a train to UBC, or extensions in Surrey.

Truer words haven't been spoken. :cheers: What people that don't live through actual events make up in their heads almost never match the realities of those actual events.
 
Evergreen Line cars slated to run on Expo, Millennium Lines this summer

A fleet of SkyTrain cars ordered for the new Evergreen Line will be pressed into service even before the $1.4-billion line opens next year, as TransLink looks to ease rush-hour crowding on the Expo and Millennium lines.

The change will increase the average capacity of each train on the system by 100 passengers.

Vivienne King, president of TransLink Subsidiary B.C. Rapid Transit Co., said seven of the new Mark III trains will be added to SkyTrain as soon as they have been tested. That will likely be this summer.
 