Posted May 4, 2016, 7:53 PM
|
 |
Hmm....
|
|
Join Date: Mar 2007
Location: Regina
Posts: 3,505
|
|
Someone made the comment a while back (Stormer?) about how they were hoping Viterra would be continuing the restoration of the building on the other floors.
I meant to say something a week ago or so, but the lift is back, and a bunch of windows on the first and second floors have been replaced with plywood. They did this at the start of the 3rd floor process too. From how it seemed to go, they keep the windows/new frame inside, move them onto the lift, remove the window/frames and replace them with the new.
|